{Fourth Schedule}
Fort SCHEDULE
WEIGHTS OF MATERIALS
(By-taw 56)
ANI kgf?
Earth (in natural state orrammed).. -. +. 1734
Sand (Wet) 0. ee ewe ete 20 2,039
Gravel foe 191,937
Aluminiumand Alloys 50-5 5 eee 7 270
Steel cee ee 7,850
Brickwork 9.00. eee ee (®) 4,920 cy
Concrete: j
(a) Umreinforced-- 22. 2B 2,310 |
(b) Reinforced : cM 2,800 |
Granite and Marble. - 26 2,690 1
Limestone 25 2,500 ;
Sandstone toe - 2 2,310 i
Timber eve eee ee ee BAL 80041120 i
Nin fn i
Plaster on brickwork, blocks or concrete per 25.4 mm_ i
thickness... kee 49 j
Suspended metal lath and plaster... =. + 380 39 i
Roof Tiles:
(a) Terra-cotta (French pattern)... .. -. -. 580 59
() Concrete 62 5800 34
Glass per6.35 mmthickness 5 0.0... 170 7 i
Asbestos coment:
(a) 635mmplain .. - wee 100 16
(b) Corrugated 5-20. ee, 200-170 10:17
Galvanished Iron, 24 gauge, 76.2.mm corrugation .. 4 9
Brickwork per25.4mmthickness .. .. .. -- 480 “9
Cement mortar finish per 25.4mm thickness... .. 580 9
104{Fourth Schedule}
aN L ca
ART GALLERY (See MUSEUM FLOORS)
ASSEMBLY BUILDINGS such as public halls
and theatres, but excluding dril halls
places of worship, public lounges, schools
and toilet rooms:
with Fixed seating® 40 408 - -
without fixed seating 50 510 3.6 367
BALCONIES Same as the rooms to | 15 133
which they give access | per metre | per metre
ran roa
concentrated at the edge
BANKING HALLS 30 Eo = ~
BEDROOMS:
Domestic buildings 1s. 183 14 13
Hotels and motels 20 208 18 184
Institutional buildings 4S 153 18 184
BILLIARD ROOMS 20 204 27 25
BOILER ROOMS. 7s 768 43+ 459+
BOOK STORES 24 mS 70+ m+
foreach | tor exch
metre of | metre of
storage | storage
height height
4 BROADCASTINGS STUDIOS: 20 204 18 184
Corridors (see CORRIDORS) 4SKN | 459%ef = ~
Dressing rooms per metre | per metre
: Fly galleries mun run
‘uniformly distributed
‘over the width
: Grids 28 255 - -
we Stages 73 765 45 49
: Stodios 49 408 = —
‘Toilet rooms 20 24 - -
Fue eatog ples tat tbe removal be eating and be ut fhe pce er oterpusponr a imprbable
+ Concenited lad 10 be determined bu of not et wae thas hese. .
105{Fourth Schedule}
USES AND LOADS—(cont.)
Use t0 which building or
structure is 10 be put
BUNGALOWS
|CATWALKS
ICHAPELS AND CHURCHES
|CINEMAS (1ee ASSEMBLY BUILDINGS
JAND BROADCASTING
| STUDIOS
CLASS ROOMS
Iceur
‘Assembly areas with fied seating®
Assembly areas without fixed seating
Bedrooms
183
Billiard rooms 204
Corridors (see CORRIDORS)
Dining rooms 20 24
Kitebens To be determined but
not leas than,
30 306
Lounges 20 rst
Laundries 3.0 306
‘Toilet rooms 20 cy
COLD STORAGE 50 51a
foreach | for cach
metre of | metre-of
wtorage | storage
height, | beigat,
witha | witha
minimum | minimum
of 15.0 | of 1530
Flat aang inp at Be removal aang and the a of emperor pry a imprbabe
“+ Conca lod tobe atari bt ot ota ta hn,
106