You are on page 1of 8

Trench Piping

Central , Polymer & Monomer /


: Supports 1
1-1 :
L 70*70*7 mm : 120 %20

216,000,000
1-2 :

5555 500,000,000
1-3 :

%15 75,000,000
: Cable Ducts & Caps 2
2-1 :

2000*1000*3mm 400 Sheet %25


960,000,000 :
2-2 :
455 680,000,000 :
3 UPVC 2 255
3-1 :
" 1/2" ~ 6 %25

216,000,000

3-2 :
" 1955 650,000 "
1,235,000,000 %25

" 1,485,000,000 :
4 Carbon Steel 4 255
4 1
" 1/2" ~ 4 %20 :

720,000,000
4 2 :
" 1855 800,000
1,480,000,000 %25

" 1,776,000,000 :
U Bolts 5
" 300 U Bolt 50,000,000
.

:
Supports 1 :

216,000,000

Cable Ducts & Caps 2 :

960,000,000

3 UPVC :

216,000,000

4 :

720,000,000

U BOLTS 5 :

50,000,000

-------------------------------------------------------------------------

2,162,000,000

:
Supports 1 :

575,000,000

Cable Ducts & Caps 2 :

680,000,000

3 UPVC 1,485,000,000 :
4 :

1,776,000,000

-----------------------------------------------------------------------

4,516,000,000

Trench Piping
Central , Polymer & Monomer /
: Supports 1
1 1 155 :
1 2/ 3/ /
" 6 :
25 : / 5

5 = 365 * 12 * 6
1 2 :
1 2/ 3/

" 6 :
25 : / 5

5 = 365 * 12 * 6
1 3 :
1 2 / 1 / 1 / 1 /
/ 3 /
" 15 :
5 : / 25

25 = 2455 * 12 * 15

365 + 365 + 2455 = 3125

: Cable Ducts & Caps 2


2 1 455:
1 2 / 3 / 1 /
1 /
" 8 :
45 : / 15

15 = 965 * 12 * 8

2 2 :
1 1 / 2 / 3 / 1 / 3 /
2/
" 13 :
35 : / 14 :

14 = 2184 * 12 * 13
2 3 455:
1 1 / 3 / 2 /
2 / 1/ 2/
2/

" 14
25 : / 16

16 = 2685 * 12 * 14

965 + 2184 + 2685 = 5825

3 UPVC 2 255
3 1
1 2 / 5 /
"8 :
45 : / 15 :

15 = 965 * 12 * 9
3 2
1 1 / 2 / 5 /
9 :
35 : / 14

14 = 1512 * 12 * 9

965 + 1512 = 2472

4 Carbon Steel 4 255


4 1
1 / 2 3 / 3 /
2 /
" 11 :
55 : / 16 :

16 = 2112 * 12 * 11
4 2
1 2 / 2 / 2 / 6 / 2 /
2 /
" 17 :
45 : / 46 = 45 1855 /

46 = 9384 * 12 * 17

2112 + 9384 = 11496

1
655,000,000 = 210,000* 3120
2
1,222,200,000 = 210,000 * 5820
3
519,120,000 = 210,000 * 2472
4
2,414,160,000 = 210,000 * 11496
--------------------------------------------------------------------------

4,810,480,000