3G 4G

1. Grounding cables.
2. Rack position in Diagram.
3. Dummy slots e.g. WRFU.MRFU
4. Power breakers check Ampere of breakers and power configuration on SAF 63A
5. VSWR test max software 1.30dbm in Huawei.
6. Feeder and jumpers cables installation, looping, weather proofing, grounding. PHYSICAL layout.
7. Roxtec is sealed and fixed well after new cables installation.
8. Indoor outdoor labeling.

3G TCP/IP address 17.21.2.14 user name admin and password NodeB


VSWR COMMANDS FOR 3G
STR VSWR TEST
LST VSWR TEST
LST DEVIP
PING

4G TCP/IP 192.168.0.2 IE 192.168.0.49 username admin password admin123


LST DEVIP
LST VLANMAP
DSP OMCH
STR VSWR

The link status


SET DHCPSW: SWITCH=DISABLE;

REJECTED
1.

2.

3. Fixed the roxtec

4. Power cables should be grounded.

5. Outdoor Cavity box (OCB) should be tightly fastened.

6. Keep the environment of site neat and clean

CIVIL ISSUES
1. Roxtec.
2. Bus bar.
3. Grounding. Indoor out door
4. Tower Load.
Life load, dead load, wind load, etc
Tubular three leg masts, angular four leg lattice towers, and mobile site with telescopic towers.

LBBP fiber termination for 4G


WBBP fiber termination for 3G
Same card are used UMPT traffic to 3g 4g. Use USB port to login and through LMA. From
EG3

EG3 RTN

1. IF cable is soggy, broken, or pressed.


2. Rectify the faults.