Assignment No. 1 Due: September 16, 2013 Research and write a paper, on a type of project delivery methods used by owners purchasing construction in Canada. Project delivery method is to be summarized on one page with an appendix to a maximum of four pages. Your paper is to cover the basic fundamentals, the advantages and disadvantages, and overview of why and where the particular type of Project delivery method is used and an actual project which used this type of Project delivery method. Group 1 Design Build Group 2 Pure Construction Manager Group 3 Construction Manager at risk Group 4 Maximum upset price (Maximum Guaranteed Price) Group 5 Joint Venture Group 6 - P3 Group 7 Unit Price and lump sum combination Group 8 Design, build, own, operate and transfer (DBOOT) Group 9 Fast Track Each Group will be assigned 10 minutes, on September 16th, 2013 to present their findings to the class on type of Project delivery method assigned to the group. The paper and copy of your presentation must be submitted on this day.