You are on page 1of 10

STV EXTENSION STV SOUTH WEST PROJECT

EPCI FOR WHP-SVSW, PIPELINES


AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT

Revision No: B

APPENDIX D : SACS INPUT

Date: 14 May 2014

LDOPT
NF+Z1.0250007.850000
GLOBMN HYDFLD MPP
**************************** SV-SW JACKET*****************************
* T&I ENGINEERING FOR SV-SW PROJECT
*
* VIETSOVPETRO

* Vung Tau, Vietnam.

*
*
*
*
*
*
*

*
*
*
*
*
*
*

Project No.
: ....
Commenced modelling : APR 2014
File name
: sacinp.Boatlanding
Client
: Cuu Long JOC
Description
: boatlanding lifting ANALYSIS
REVISION
:A
PREPARE by
: VDC

* REVIEWED BY

: PCK

* APPROVED BY
: NDT
*
*
*
*****************************************************************************
OPTIONS MN
SDUCJT 8 8 DC C PTPTPTPTPT PTPT
LCSEL
CB GRV LC1 LC2
UCPART
0.5000.5001.0001.000
GRUP
GRUP BL1
76.200 2.540 21.0080.0034.50 1 1.001.00 0.500 7.8500
GRUP BL2
61.000 3.180 21.0080.0034.50 1 1.001.00 0.500 7.8500
GRUP BL3
50.800 2.540 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP BL4
40.640 1.270 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP BL5
45.700 2.540 21.0080.0034.50 1 1.001.00 0.500 7.8500
GRUP BL6
32.390 1.270 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP BL7
27.310 1.270 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP BL8
21.910 1.270 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP BL9
16.830 0.952 21.0080.0024.00 1 1.001.00 0.500 7.8500
GRUP PA
21.900 1.270 20.007.72424.80 9 1.001.00 0.500 1.00-5
GRUP SLI
5.000 2.400 20.007.72424.80 9 1.001.00 0.500 1.00-5
MEMBER
MEMBER B011B015 BL1
L 1.801.80
MEMBER B012B011 BL1
MEMBER B013B016 BL1
L 1.801.80
MEMBER B014B013 BL1
MEMBER B017B012 BL1
L 1.801.80

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

MEMBER B018B014 BL1


MEMBER B001B003 BL2
MEMBER B002B004 BL2
MEMBER B009B024 BL2
MEMBER B010B025 BL2
MEMBER B019B009 BL2
MEMBER B020B010 BL2
MEMBER B024B027 BL2
MEMBER B025B028 BL2
MEMBER B027B079 BL2
MEMBER B028B002 BL2
MEMBER B079B001 BL2
MEMBER1B024B045 BL3
MEMBER OFFSETS
MEMBER1B027B029 BL3
MEMBER OFFSETS
MEMBER B029B033 BL3
MEMBER B033B034 BL3
MEMBER B034B035 BL3
MEMBER B035B036 BL3
MEMBER B036B037 BL3
MEMBER B037B052 BL3
MEMBER B045B046 BL3
MEMBER B046B047 BL3
MEMBER B047B048 BL3
MEMBER B048B049 BL3
MEMBER B049B050 BL3
MEMBER B050B051 BL3
MEMBER1B051B025 BL3
MEMBER OFFSETS
MEMBER1B052B028 BL3
MEMBER OFFSETS
MEMBER B033B061 BL4
MEMBER B034B062 BL4
MEMBER B035B063 BL4
MEMBER1B036B064 BL4
MEMBER OFFSETS
MEMBER B046B033 BL4
MEMBER B047B034 BL4
MEMBER B048B035 BL4
MEMBER B049B036 BL4
MEMBER B050B037 BL4

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

L 1.801.80
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 11.111.1
L 10.61.72
20.047-22.99
L 10.61.65
20.047-22.99
L 10.61.20
L 10.61.50
L 10.61.50
L 10.61.50
L 10.61.50
L 10.61.20
L 8.401.20
L 8.401.50
L 8.401.50
L 8.401.50
L 8.401.50
L 8.401.20
L 10.61.72
-20.04-22.99
L 10.61.65
-20.04-22.99
L 2.401.20
L 2.401.20
L 1.201.20
L 1.201.20
-20.32
L 3.263.26
L 3.263.26
L 3.263.26
L 3.263.26
L 3.263.26

Date: 14 May 2014

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

MEMBER1B060B071 BL4
MEMBER OFFSETS
MEMBER B061B060 BL4
MEMBER1B061B062 BL4
MEMBER OFFSETS
MEMBER B062B063 BL4
MEMBER B062B071 BL4
MEMBER1B063B064 BL4
MEMBER OFFSETS
MEMBER1B079B081 BL4
MEMBER OFFSETS
MEMBER B081B060 BL4
MEMBER1B011B001 BL5
MEMBER OFFSETS
MEMBER1B012B009 BL5
MEMBER OFFSETS
MEMBER1B013B002 BL5
MEMBER OFFSETS
MEMBER1B014B010 BL5
MEMBER OFFSETS
MEMBER1B027B059 BL6
MEMBER OFFSETS
MEMBER1B053B028 BL6
MEMBER OFFSETS
MEMBER B054B053 BL6
MEMBER B055B054 BL6
MEMBER B056B055 BL6
MEMBER B057B056 BL6
MEMBER B058B057 BL6
MEMBER B059B058 BL6
MEMBER1B061B068 BL7
MEMBER OFFSETS
MEMBER1B064B084 BL7
MEMBER OFFSETS
MEMBER1B066B065 BL7
MEMBER OFFSETS
MEMBER B067B066 BL7
MEMBER1B068B067 BL7
MEMBER OFFSETS
MEMBER B069B070 BL7
MEMBER1B070B073 BL7
MEMBER OFFSETS

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

L 3.831.50
28.000
L 2.401.20
L 4.501.50
-28.00
L 4.501.50
L 2.401.20
L 4.501.50
28.000
L 3.831.65
20.047-22.99
L 3.831.20
L 1.901.90
38.100
-30.50
L 1.901.90
38.100
-30.50
38.100

-30.50

38.100
-30.50
L 10.61.65
20.94522.171
L 10.61.65
-20.9422.177
L 10.61.20
L 10.61.50
L 10.61.50
L 10.61.50
L 10.61.50
L 10.61.20
L 2.502.50
20.320
15.000
L 2.501.30
20.320
L 4.501.50
-13.65
L 4.501.50
L 4.501.50
13.655
L 3.831.50
L 4.101.60
22.000

Date: 14 May 2014

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

MEMBER1B071B080 BL7
MEMBER OFFSETS
MEMBER1B079B082 BL7
MEMBER OFFSETS
MEMBER B080B070 BL7
MEMBER B082B069 BL7
MEMBER B084B065 BL7
MEMBER1B033B058 BL8
MEMBER OFFSETS
MEMBER1B034B057 BL8
MEMBER OFFSETS
MEMBER1B035B056 BL8
MEMBER OFFSETS
MEMBER1B036B102 BL8
MEMBER OFFSETS
MEMBER1B037B085 BL8
MEMBER OFFSETS
MEMBER1B046B058 BL8
MEMBER OFFSETS
MEMBER1B047B057 BL8
MEMBER OFFSETS
MEMBER1B048B056 BL8
MEMBER OFFSETS
MEMBER1B049B055 BL8
MEMBER OFFSETS
MEMBER1B050B054 BL8
MEMBER OFFSETS
MEMBER1B054B065 BL8
MEMBER OFFSETS
MEMBER1B055B065 BL8
MEMBER OFFSETS
MEMBER1B056B066 BL8
MEMBER OFFSETS
MEMBER1B057B067 BL8
MEMBER OFFSETS
MEMBER1B058B068 BL8
MEMBER OFFSETS
MEMBER1B060B069 BL8
MEMBER OFFSETS
MEMBER1B062B100 BL8
MEMBER OFFSETS
MEMBER1B063B083 BL8

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

L 4.102.50
20.320
L 3.831.65
20.94522.171
L 4.102.50
L 3.831.20
L 2.501.30
L 2.502.50
25.400
-16.19
L 2.502.50
25.400
-16.19
L 2.502.50
25.400
-16.19
L 2.502.50
25.400
L 2.502.50
25.400
L 4.114.11
15.45120.160
-9.851-12.85
L 4.114.11
15.45120.160
-9.851-12.85
L 4.114.11
15.45120.160
-9.851-12.85
L 4.114.11
15.45120.160
-9.851-12.85
L 4.114.11
15.45120.160 -9.851-12.85
L 1.921.92
-20.24 16.19517.069 -13.65
L 1.201.20
16.195
-13.65
L 1.201.20
16.195
-13.65
L 2.401.20
16.195
-13.65
L 2.401.20
16.195
-13.65
L 4.102.50
20.320
-13.65
L 2.501.30
20.320
L 2.501.30

Date: 14 May 2014

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

MEMBER OFFSETS
20.320
MEMBER1B066B070 BL8
L 1.921.92
MEMBER OFFSETS
-17.07 13.65517.069 -13.65
MEMBER1B067B070 BL8
L 2.401.20
MEMBER OFFSETS
13.655
-13.65
MEMBER1B068B069 BL8
L 2.401.20
MEMBER OFFSETS
13.655
-13.65
MEMBER B069B072 BL8
L 4.101.60
MEMBER B072B073 BL8
L
1.50
MEMBER1B083B066 BL8
L 2.501.30
MEMBER OFFSETS
-13.65
MEMBER1B083B080 BL8
L 1.921.92
MEMBER OFFSETS
-8.554
6.84410.663 -8.530
MEMBER1B085B054 BL8
L 2.502.50
MEMBER OFFSETS
-16.19
MEMBER1B085B084 BL8
L 1.921.92
MEMBER OFFSETS
-8.554
6.84410.663 -8.530
MEMBER1B100B067 BL8
L 2.501.30
MEMBER OFFSETS
-13.65
MEMBER1B102B055 BL8
L 2.502.50
MEMBER OFFSETS
-16.19
MEMBER1B083B084 BL9
L 3.001.50
MEMBER OFFSETS
10.955
-13.65
MEMBER1B100B083 BL9
L 3.001.50
MEMBER OFFSETS
10.955
-10.96
MEMBER1B102B085 BL9
L 1.501.50
MEMBER OFFSETS
10.955
-10.96
MEMBER B003PA01 PA
MEMBER B004PA02 PA
MEMBER1B064PA04 PA
MEMBER OFFSETS
20.300
MEMBER1B071PA03 PA
MEMBER OFFSETS
20.300
MEMBER PA01HOOK SLI 000011000111
MEMBER PA02HOOK SLI 000011000111
MEMBER PA03HOOK SLI 000011000111
MEMBER PA04HOOK SLI 000011000111
JOINT
JOINT B001 -5. 0. 5.-33.350
JOINT B002 5. 0. 5. 33.350 0.004
JOINT B003 -5. 0. 7.-33.350
JOINT B004 5. 0. 7. 33.350 0.004

Date: 14 May 2014

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

JOINT B009 -5. 0. -2.-33.350


-85.000
JOINT B010 5. 0. -2. 33.350 0.004-85.000
JOINT B011 -5. -1. 5.-33.350-90.000
JOINT B012 -5. -1. -2.-33.350-90.000-85.000
JOINT B013 5. -1. 5. 33.350-90.000
JOINT B014 5. -1. -2. 33.350-90.000-85.000
JOINT B015 -5. -1. 5.-33.350-90.000 90.000
JOINT B016 5. -1. 5. 33.350-90.000 90.000
JOINT B017 -5. -1. -3.-33.350-90.000-70.000
JOINT B018 5. -1. -3. 33.350-90.000-70.000
JOINT B019 -5. 0. -5.-33.350
-22.000 110000
JOINT B019 10.000 10.000
ELASTI
JOINT B020 5. 0. -5. 33.350
-22.000 110000
JOINT B020 10.000 10.000
ELASTI
JOINT B024 -5. 0. -2.-33.350
-20.000
JOINT B025 5. 0. -2. 33.350 0.004-20.000
JOINT B027 -5. 0. 0.-33.350
80.800
JOINT B028 5. 0. 0. 33.350 0.004 80.800
JOINT B029 -4. -1. 0.-19.947-29.996 80.800
JOINT B033 -2. -1. 0.-99.947-29.996 80.800
JOINT B034 -1. -1. 0.-49.947-29.996 80.800
JOINT B035 0. -1. 0. 0.053-29.996 80.800
JOINT B036 1. -1. 0. 50.053-29.996 80.800
JOINT B037 3. -1. 0. 0.053-29.996 80.800
JOINT B045 -4. -1. -2.-19.947-29.996-20.000
JOINT B046 -2. -1. -2.-99.947-29.996-20.000
JOINT B047 -1. -1. -2.-49.947-29.996-20.000
JOINT B048 0. -1. -2. 0.053-29.996-20.000
JOINT B049 1. -1. -2. 50.053-29.996-20.000
JOINT B050 3. -1. -2. 0.053-29.996-20.000
JOINT B051 4. -1. -2. 20.053-29.996-20.000
JOINT B052 4. -1. 0. 20.053-29.996 80.800
JOINT B053 4. 1. 0. 20.053 20.004 80.800
JOINT B054 3. 1. 0. 0.053 20.004 80.800
JOINT B055 1. 1. 0. 50.053 20.004 80.800
JOINT B056 0. 1. 0. 0.053 20.004 80.800
JOINT B057 -1. 1. 0.-49.947 20.004 80.800
JOINT B058 -2. 1. 0.-99.947 20.004 80.800
JOINT B059 -4. 1. 0.-19.947 20.004 80.800
JOINT B060 -2. -1. 3.-99.947-29.996 25.880
JOINT B061 -2. -1. 2.-99.947-29.996 5.880
JOINT B062 -1. -1. 2.-49.947-29.996 5.880

Date: 14 May 2014

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

SuTuVangSouthWest

BOATLANDINGS OFFSHORE LIFTING

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

JOINT B063 0. -1. 2. 0.053-29.996 5.880


JOINT B064 1. -1. 2. 50.053-29.996 5.880
JOINT B065 1. 1. 2. 50.053 20.004 5.880
JOINT B066 0. 1. 2. 0.053 20.004 5.880
JOINT B067 -1. 1. 2.-49.947 20.004 5.880
JOINT B068 -2. 1. 2.-99.947 20.004 5.880
JOINT B069 -2. 1. 3.-99.947 20.004 25.880
JOINT B070 -1. 1. 3.-49.947 20.004 25.880
JOINT B071 -1. -1. 3.-49.947-29.996 25.880
JOINT B072 -2. 2. 3.-99.947 80.004 25.880
JOINT B073 -1. 2. 3.-49.947 80.004 25.880
JOINT B079 -5. 0. 3.-33.350
25.880
JOINT B080 -1. 0. 3.-49.947 0.004 25.880
JOINT B081 -4. -1. 3.-19.947-29.996 25.880
JOINT B082 -4. 1. 3.-19.947 20.004 25.880
JOINT B083 0. 0. 2. 0.053 0.004 5.880
JOINT B084 1. 0. 2. 50.053 0.004 5.880
JOINT B085 3. 0. 0. 0.053 0.004 80.800
JOINT B100 -1. 0. 2.-49.947 0.004 5.880
JOINT B102 1. 0. 0. 50.053 0.004 80.800
JOINT HOOK 0. 0. 22.-20.116-62.850 54.600 111111
JOINT PA01 -5. 0. 7.-33.350
17.000
JOINT PA02 5. 0. 7. 33.350 0.004 17.000
JOINT PA03 -1. -1. 3.-49.947-29.996 63.180
JOINT PA04 1. -1. 2. 50.053-29.996 43.180
LOAD
LOADCN 2
LOAD Z B046B033
-0.6100
-0.6100
GLOB UNIF
LOAD Z B033B061
-0.6100
-0.6100
GLOB UNIF
LOAD Z B061B060
-0.6100
-0.6100
GLOB UNIF
LOAD Z B047B034
-0.6100
-0.6100
GLOB UNIF
LOAD Z B034B062
-0.6100
-0.6100
GLOB UNIF
LOAD Z B062B071
-0.6100
-0.6100
GLOB UNIF
LOAD Z B048B035
-0.6100
-0.6100
GLOB UNIF
LOAD Z B035B063
-0.6100
-0.6100
GLOB UNIF
LOAD Z B049B036
-0.6100
-0.6100
GLOB UNIF
LOAD Z B036B064
-0.6100
-0.6100
GLOB UNIF
LOAD Z B050B037
-0.6100
-0.6100
GLOB UNIF
LOAD Z B079B082
-0.3100
-0.3100
GLOB UNIF
LOAD Z B082B069
-0.3100
-0.3100
GLOB UNIF
LOAD Z B069B072
-0.3100
-0.3100
GLOB UNIF
LOAD Z B072B073
-0.3100
-0.3100
GLOB UNIF

Date: 14 May 2014

BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-FENDE
BL-HANDR
BL-HANDR
BL-HANDR
BL-HANDR

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

Date: 14 May 2014

LOAD Z B066B070
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B066B065
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B054B065
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B083B080
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B085B084
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B054B053
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B053B028
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B062B100
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B100B083
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B102B085
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B036B102
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B064B084
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B071B080
-0.3100
-0.3100
GLOB UNIF BL-HANDR
LOAD Z B079B081 0.80000-0.6000
GLOB CONC BL-LADDE
LOAD Z B027B029 0.80000-0.3000
GLOB CONC BL-LADDE
LOAD Z B024B045 0.80000-0.3000
GLOB CONC BL-LADDE
LOAD Z B079B081 1.30000-0.6000
GLOB CONC BL-LADDE
LOAD Z B027B029 1.30000-0.3000
GLOB CONC BL-LADDE
LOAD Z B024B045 1.30000-0.3000
GLOB CONC BL-LADDE
LOAD B003
-1.2000
GLOB JOIN BL-PADEY
LOAD B004
-1.2000
GLOB JOIN BL-PADEY
LOAD B071
-0.6000
GLOB JOIN BL-PADEY
LOAD B064
-0.6000
GLOB JOIN BL-PADEY
LOAD Z B079B082 0.70000-0.7500
GLOB CONC BL-MORIG
LOAD Z B053B028 0.70000-0.7500
GLOB CONC BL-MORIG
LOAD Z B070B073 0.10000-0.6000
GLOB CONC BL-STAIR
LOAD Z B070B073 1.40000-0.6000
GLOB CONC BL-STAIR
*
***LDS1** -5.334-4.70206-4 3.462 -4.200 -1.299 3.462 -4.200
***LDS2** 1.201 3.462 -4.200 1.201 3.462 -0.551 -0.551
***LDS3** 0.340 50 3 3 0 12 -2EQUPPRESBL-GRATT
LOAD Z B079B081
-0.5499
-0.5499
GLOB UNIF BL-GRATT
*
***LDS1** -3.000 1.201 3.462 -3.000 2.801 3.462 -3.000
***LDS2** 1.201 3.462 -3.000 2.801 3.462 -0.551 -0.551
***LDS3** 0.340 50 3 3 0 12 -2EQUPPRESBL-GRATT
LOAD Z B069B072
-0.4133
-0.4133
GLOB UNIF BL-GRATT
LOAD Z B070B073
-0.41331.60000-0.4133
GLOB UNIF BL-GRATT
*
***LDS1** -4.200 -1.299 3.462 -3.000 -1.299 3.462 -4.200
***LDS2** 1.201 3.462 -3.000 1.201 3.462 -0.551 -0.551
***LDS3** 0.305 50 3 3 0 12 -2EQUPPRESBL-GRATT

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011

BOATLANDINGS OFFSHORE LIFTING

Page: 1 of 10

ANALYSIS REPORT

Revision No: B

LOAD Z B081B060
LOAD Z B082B069
*
***LDS1** -3.000
***LDS2** -1.299
***LDS3** 0.305
LOAD Z B060B069
LOAD Z B071B080
LOAD Z B080B070
*
***LDS1** -3.000
***LDS2** -1.299
***LDS3** 0.500
LOAD Z B064B084
LOAD Z B084B065
LOAD Z B062B100
LOAD Z B063B083
LOAD Z B083B066
*
***LDS1** -3.000
***LDS2** -1.299
***LDS3** 0.500
LOAD Z B037B085
LOAD Z B085B054
*
***LDS1** 3.000
***LDS2** 1.201
***LDS3** 0.500
LOAD Z B037B052
LOAD Z B054B053
*
***LDS1** 4.200
***LDS2** -1.299
***LDS3** 0.500
LOAD Z B053B028
LOAD Z B083B080
LOAD Z B066B070
LOAD Z B085B084
LOAD Z B054B065
LOAD B001
LOAD B009
LOAD B010

SuTuVangSouthWest

APPENDIX D : SACS INPUT

-0.6887
-0.6888

-0.6887
-0.6888

Date: 14 May 2014

GLOB UNIF BL-GRATT


GLOB UNIF BL-GRATT

-1.299 3.462 -3.000 1.201 3.462 -3.000


3.462 -3.000 1.201 3.462 -0.551 -0.551
50 3 3 0 12 -2EQUPPRESBL-GRATT
-0.4782
-0.4782
GLOB UNIF BL-GRATT
-0.4898
-0.4898
GLOB UNIF BL-GRATT
-0.4133
-0.4133
GLOB UNIF BL-GRATT
-1.299 2.262 -3.000 1.201 2.262 -3.000
2.262 -3.000 1.201 2.262 -0.551 -0.551
50 3 3 0 12 -2EQUPPRESBL-GRATT
-0.4898
-0.4898
GLOB UNIF BL-GRATT
-0.4133
-0.4133
GLOB UNIF BL-GRATT
-0.9796
-0.9796
GLOB UNIF BL-GRATT
-0.9796
-0.9796
GLOB UNIF BL-GRATT
-0.9326
-0.9326
GLOB UNIF BL-GRATT
-1.299 1.062 -3.000 1.201 1.062 -3.000
1.062 -3.000 1.201 1.062 -0.551 -0.551
50 3 3 0 12 -2EQUPPRESBL-GRATT
-0.5136
-0.5136
GLOB UNIF BL-GRATT
-0.4777
-0.4777
GLOB UNIF BL-GRATT
-1.299 1.062 4.200 -1.299 1.062 3.000
1.062 4.200 1.201 1.062 -0.551 -0.551
50 3 3 0 12 -2EQUPPRESBL-GRATT
-0.6887
-0.6887
GLOB UNIF BL-GRATT
-0.6888
-0.6888
GLOB UNIF BL-GRATT
1.201 1.062 5.334 0.001 1.062 4.200
1.062 4.200 -1.299 1.062 -0.551 -0.551
50 3 3 0 12 -2EQUPPRESBL-GRATT
-0.4728
-0.4728
GLOB UNIF BL-GRATT
-0.3850
-0.3850
GLOB UNIF BL-GRATT
-0.3850
-0.3850
GLOB UNIF BL-GRATT
-0.3850
-0.3850
GLOB UNIF BL-GRATT
-0.3850
-0.3850
GLOB UNIF BL-GRATT
-0.7400
GLOB JOIN BL-_DOPL
-0.7400
GLOB JOIN BL-_DOPL
-0.7400
GLOB JOIN BL-_DOPL

STV EXTENSION STV SOUTH WEST PROJECT


EPCI FOR WHP-SVSW, PIPELINES
AND CPP MODIFICATIONS
Document No.:
2013-1489-6R-3011
Revision No: B

BOATLANDINGS OFFSHORE LIFTING

SuTuVangSouthWest

Page: 1 of 10

ANALYSIS REPORT
APPENDIX D : SACS INPUT

LOAD B002
-0.7400
LOAD B054
-0.1800
LOAD B085
-0.1800
LOAD B066
-0.1800
LOAD B083
-0.1800
LOAD B073
-0.1800
LOAD B070
-0.1800
LOAD Z B012B011
-2.4051
-2.4051
LOAD Z B014B013
-2.4051
-2.4051
LOADCN 1
DEAD
DEAD -Z
M
LOADCN 3
LOAD B065
-10.940
LOAD B064
12.6400
LOAD B067
-14.940
LOAD B062
13.2400
LCOMB
LCOMB CB 1 1.00002 1.0000
LCOMB GRV CB 1.13003 1.0000
LCOMB LC1 GRV 1.3500
LCOMB LC2 GRV 2.0000
END

Date: 14 May 2014

GLOB JOIN BL-_DOPL


GLOB JOIN BL-_DOPL
GLOB JOIN BL-_DOPL
GLOB JOIN BL-_DOPL
GLOB JOIN BL-_DOPL
GLOB JOIN BL-_DOPL
GLOB JOIN BL-_DOPL
GLOB UNIF BL-BUMPE
GLOB UNIF BL-BUMPE

GLOB JOIN
GLOB JOIN
GLOB JOIN
GLOB JOIN

COUPLE
COUPLE
COUPLE
COUPLE

You might also like