DAILY REPORT
(00:00 H to 24:00 H)
DATE : 04-October-14
Day : Saturday
Operating Hours
24
24
24
24
24
0.56
GTG #1
GTG #2
GTG #3
GTG #4
GTG #5
GTG #6
TOTAL
PLANT AVERAGE LOAD (kW)
PLANT PEAK LOAD (kW)
B. POWER DELIVERED
B1. ENERGY EXPORT (Reference Value)
Non-Custody Meter
Pusaka
Pedada
Beruk/Zamrud
TOTAL
C. FUEL CONSUMPTION
3
173,111.69
0.00
20.80
20.60
21.10
44.50
41.10
00:00
666.73
157.55
@
@
17.06 H
17.10 H
18.34 H
24:00
666.38
155.66
E. REMARKS
0004H - Total Plant Load decrease from 26301 to 22516 KW due to Problem on Zamrud
Water Injection Pumps (WIP) Feeder Trafo 7MVA;
1425 H - Zamrud back to normal load total plant load around 26120 kW;
1600H-Completed the Installation of New CO2 Panel for GT-6; 16.20 H - GT 6 Start test Package Fire Alarm;
GTG 1,2, 3, 4, 5, running normal with Ave. Load 24844.75 kw; GTG-6 Available on Stand By.