You are on page 1of 4

MRI Suite HBN 06 volume 1

MRI Suite
Date :
Index Level :
M&E Index Level:

290 MIPS(FP)
290

ELEMENT

Gross Floor Area :

COST OF RATE
ELEMENT

/m2

ELEMENTAL DATA QUANTITY


Quantity Rate
FACTOR

SUBSTRUCTURE

12211

51.96

115

106.18

0.49

2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & Externl.Doors
2G Internal Walls & Partns.
2H Internal Doors

9839
5650
12990

41.87
24.04
55.28

235
113
141

41.87
50
92.13

1
0.48
0.6

9843
8340
5957.28
6244.56

41.89
35.49
25.35
26.57

122
24
236
15

80.68
347.49
25.25
416.304

0.52
0.1
1.004
0.064

58864

250.49

15.18
495.58 7.196213
24.22 223.5392 25.46236
18.1 223.5392 19.02509

2.109
0.951
0.951

SUPERSTRUCTURE

3A Wall Finishes
3B Floor Finishes
3C Ceiling Finishes

3566.299
5691.8334
4252.8518

INTERNAL FINISHES

13510.984

57.5

FITTINGS & FURNISHINGS

5764.33

24.53

2410.42
1137.6923
6181
3090

10.26
4.84
26.3
13.15

12819

54.55

3559.1923
4558.5769

15.15
19.4

5A Sanitary Appliances
5C Disposal Installations
5N B.W.I.C.
5O Profit & Attendances
BUILDING SERVICES

5B Services Equipment
5D Water Installations

7
7

344.35
162.53

0.03
0.03

5E Heat Source (Inc. in 5F)


5F Space Heating/Air Treatment
5G Ventilation System
5H Electrical Installations
5I Gas (N/R)
5J Lifts and Conveyors
5K Protective Installations
5L Communications
5M Special Installations

0
24271.885
11393.654
17037.5
0
0
510.84615
56354.808
5923.8077

0
103.28
48.48
72.5
0
0
2.17
239.81
25.21

M. & E. SERVICES

123610.27

526

226780

965.03

28348
4536

120.63
19.3

259664

1104.95

Building
116828
Engineering142836.42

497.14
607.81

BUILDING & ENGINEERING


6A Preliminaries
6B Contingencies

TOTAL COST

17-Apr-97
235 m2

ELEMENTAL
PERCENTAGE
%
5.38

4.34
2.49
5.73
4.34
3.68
2.63
2.75
25.96

1.57
2.51
1.88
5.96
2.54

1.06
0.5
2.73
1.36
5.65

1.57
2.01

0
10.7
5.02
7.51
0
0
0.23
24.85
2.61
54.5

100
12.5
2

44.99
55.01