Hospital accommodation for children & young people

Main Entrance. Out-patient's suite-6 consult/exam rooms. Child development centre-2assessment rooms.
Rehabilitaion unit-2 rooms. Day care unit-8 single & 2x4 multi-bed rooms. In-patient accommodation-24 single and 4x4
multi-bedrooms. Admission room-1 room. Paediatric assessment unit-1x4 multi-bed room. Staff accommodation
Date :

Index Level :
M&E Index Level:

425 MIPS(FP)
425

ELEMENT

Gross Floor Area :

COST OF RATE
ELEMENT

/m2

ELEMENTAL DATA QUANTITY


Quantity Rate
FACTOR

SUBSTRUCTURE

367372

76.24

2361

155.6

0.49

2A Frame
2B Upper Floors
2C Roof
2D Stairs
2E External Walls
2F Windows & Externl.Doors
2G Internal Walls & Partns.
2H Internal Doors

295694
169474
390314

61.36
35.17
81

4819
2313
2891

61.36
73.27
135.01

1
0.48
0.6

296309
245459
106742.1
274117.5

61.49
50.94
22.15
56.89

2506
118.24
482
509.25
5187
20.58
334.2 820.2199

0.52
0.1
1.076
0.069

SUPERSTRUCTURE

1778110

369

3A Wall Finishes
3B Floor Finishes
3C Ceiling Finishes

219577.2
191805.8
118479.3

45.57 11035.46 19.89742


39.81 4576.733 41.90889
24.59 4576.733 25.88732

2.29
0.95
0.95

INTERNAL FINISHES

529862.3

109.97

FITTINGS & FURNISHINGS

160325.6

33.27

174598.5
295485.2
81577
40788

36.23
61.32
16.93
8.46

592449

122.94

5A Sanitary Appliances
5C Disposal Installations
5N B.W.I.C.
5O Profit & Attendances
BUILDING SERVICES

1241
1241

140.69
196.21

0.258
0.258

5B Services Equipment
5D Water Installations
5E Heat Source (Inc. in 5F)
5F Space Heating/Air Treatment
5G Ventilation System
5H Electrical Installations
5I Gas (N/R)
5J Lifts and Conveyors
5K Protective Installations
5L Communications
5M Special Installations

53563.5
149940.3
0
351819
124002.3
444508.2
0
0
0
412632.6
95064.26

11.12
31.12
0
73.01
25.73
92.25
0
0
0
85.63
19.73

M. & E. SERVICES

1631530

338.59

BUILDING & ENGINEERING

5059649

1050.01

632456
101193

131.25
21

5793298

1202.27

3865655
1927643

802.23
400.04

6A Preliminaries
6B Contingencies

TOTAL COST

Building
Engineering

ent rooms.
ation-24 single and 4x4
f accommodation
1-Jul-05

4818.623 m2

ELEMENTAL
PERCENTAGE
%
7.26

5.84
3.35
7.71
5.86
4.85
2.11
5.42
35.14

4.34
3.79
2.34
10.47
3.17

3.45
5.84
1.61
0.81
11.71

1.06
2.96
0
6.95
2.45
8.79
0
0
0
8.16
1.88
32.25

100
12.5
2

66.73
33.27