You are on page 1of 27

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE II
STS

REV.

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE III
STS

REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

PLUMBING
UMUM
1

DAFTAR GAMBAR PLUMBING

PL-SD-001

PL - FC - 001

SIMBOL & SINGKATAN

PL-SD-002

PL - FC - 002

DIAGRAM SYSTEM
3

DIAGRAM SYSTEM AIR BERSIH TOWER A, B,C & MALL ( Lembar -1 )

PL-SD-101

PL - FC - 101

17-Feb-14

25-Feb-14

ADI

DIAGRAM SYSTEM AIR BERSIH TOWER D,E,F & G ( Lembar -2 )

PL-SD-102

PL - FC - 102

19-Feb-14

3-Mar-14

ADI

DIAGRAM SYSTEM AIR KOTOR, AIR BEKAS & KITCHEN TOWER A & B

PL-SD-103

PL - FC - 103

DIAGRAM SYSTEM AIR KOTOR, AIR BEKAS & KITCHEN TOWER C & D

PL-SD-104

DIAGRAM SYSTEM AIR KOTOR, AIR BEKAS & KITCHEN TOWER E,F & G

PL-SD-105

PL - FC - 104

16-Dec-13

16-Dec-13

DIAGRAM SYSTEM AIR HUJAN TOWER A, B, C & MALL ( Lembar -1 )

PL-SD-106

PL - FC - 105

12-Mar-14

18-Mar-14

ADI

DIAGRAM SYSTEM AIR HUJAN TOWER D, E, F & G ( Lembar -2 )

PL-SD-107

PL - FC - 106

12-Mar-14

18-Mar-14

ADI

10

DIAGRAM SYSTEM STP TOWER A ( KAP 375 M3/HARI )

PL-SD-108

PL - FC - 107

11

DIAGRAM SYSTEM STP TOWER D ( KAP 375 M3/HARI )

PL-SD-109

PL - FC - 108

12

DIAGRAM SYSTEM STP TOWER F ( KAP 750 M3/HARI )

PL-SD-110

PL - FC - 109

PL - FC - 201

28-Dec-13

11-Jan-14

28-Dec-13

11-Jan-14

ADI

11-Jan-14

16-Jan-14

ADI

30-Jan-14

10-Feb-14

24-Feb-14

5-Mar-14

ADI

INSTALASI
13

INSTALASI PEMIPAAN AIR BERSIH SITE PLAN

PL - SD - 201

14

INSTALASI PIPA TRANSFER AIR BERSIH LT. BASEMENT TOWER A, B, C & MALL (LEMBAR 1)

PL - SD - 202

PL - FC - 202

15

INSTALASI PIPA TRANSFER AIR BERSIH LT. BASEMENT TOWER D, E, F & G (LEMBAR 2)

PL - FC - 203 (202.A)

16

INSTALASI PEMIPAAN AIR BERSIH KE RUANG POMPA LANTAI LOWER GROUND

PL - SD - 203
(202.A)
PL - SD - 204

17

INSTALASI SUPPLY AIR BERSIH DEEP WELL

PL - SD - 205

PL - FC - 204

18

INSTALASI KRAN TAMAN SITE PLAN

PL - SD - 206

PL - FC - 205

19

INSTALASI AIR KOTOR, AIR BEKAS, & KITCHEN LANTAI LOWER GROUND TOWER A

PL - SD - 207

PL - FC - 206

20

INSTALASI AIR KOTOR, AIR BEKAS, & KITCHEN LANTAI LOWER GROUND TOWER C & D

PL - SD - 208

PL - FC - 207

21

INSTALASI AK, ABK, KD, AH & VENT LANTAI LOWER GROUND TOWER E, F & G

PL - SD - 209

PL - FC - 208 (205.B)

22

INSTALASI AIR HUJAN DAN ROOF DRAIN AREA PARKIR LANTAI 3

PL - SD - 210

PL - FC - 209

23

INSTALASI AIR HUJAN DAN ROOF DRAIN AREA PARKIR LANTAI 5

PL - SD - 211

PL - FC - 210

24

INSTALASI AIR HUJAN DAN ROOF DRAIN AREA PARKIR LANTAI 6

PL - SD - 212

PL - FC - 211

25

INSTALASI AIR HUJAN DAN ROOF DRAIN AREA PARKIR LANTAI 7

PL - SD - 213

PL - FC - 212

26

INSTALASI AIR HUJAN DAN ROOF DRAIN AREA PARKIR LANTAI 8

PL - SD - 214

PL - FC - 213

27

INSTALASI AIR HUJAN DAN ROOF DRAIN LANTAI 9 TOWER A, B & C

PL - SD - 215

PL - FC - 214

28

INSTALASI KRAN TAMAN LANTAI 9 TOWER A, B & C

PL - SD - 216

PL - FC - 215

29

INSTALASI STP TOWER A ( KAP 375 M3/HARI )

PL - SD - 217

PL - FC - 216

30

INSTALASI STP TOWER D ( KAP 375 M3/HARI )

PL - SD - 218

PL - FC - 217

31

INSTALASI STP TOWER F ( KAP 750 M3/HARI )

PL - SD - 219

PL - FC - 218

32

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 9 TOWER - A

PL-A-SD-301

PL-A-FC-301

33

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 9TOWER - A

34

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 10 TOWER - A

35

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 10 TOWER - A

36

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 11 S/D 15 ( TYPIKAL) TOWER - A

37

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 11 S/D 15 (TYPICAL) TOWER - A

38

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 30 ( TYPIKAL) TOWER - A

39

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 30 (TYPICAL) TOWER - A

40

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - A

PL-A-SD-305

PL-A-FC-305

41

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 9 TOWER - C

PL-C-SD-306

PL-C-FC-306

PL-A-SD-301.A
PL-A-SD-302

PL-A-FC-302

PL-A-SD-302.A
PL-A-SD-303

PL-A-FC-303

PL-A-SD-303.A
PL-A-SD-304

23-Jan-14

29-Jan-14

ADI

PL - FC - 204

PL-A-FC-304

PL-A-SD-304.A

Page 1

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE II
STS

REV.

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE III
STS

REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

42

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 9 TOWER - C

PL-C-SD-306.A

43

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 10 TOWER - C

44

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 10 TOWER - C

45

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 11 S/D 15 ( TYPIKAL) TOWER - C

46

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 11 S/D 15 ( TYPIKAL) TOWER - C

47

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 30 ( TYPIKAL) TOWER - C

48

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 30 ( TYPIKAL) TOWER - C

49

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - C

PL-C-SD-310

PL-C-FC-310

50

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI GF TOWER - D

PL-D-SD-311

PL-D-FC-311

51

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - D

PL-D-SD-312

PL-D-FC-312

52

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - D

53

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - D

54

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - D

55

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 S/D 6 ( TYPIKAL ) TOWER D

56

DETAIL SHAFTINSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 S/D 6 ( TYPIKAL) TOWER - D

57

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 ( TYPIKAL ) TOWER D

58

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 ( TYPIKAL) TOWER - D

59

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL ) TOWER D

60

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL) TOWER - D

61

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - D

PL-D-SD-317

PL-D-FC-317

62

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI GF TOWER - E

PL-E-SD-318

PL-E-FC-317

63

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - E

PL-E-SD-319

PL-E-FC-318

64

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - E

65

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - E

66

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - E

67

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 TOWER - E

68

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 TOWER - E

69

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 5 S/D 6 (TYPICAL) TOWER - E

70

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 5 S/D 6 (TYPICAL) TOWER - E

71

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 TOWER - E

72

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 TOWER - E

73

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL ) TOWER - E

74

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL) TOWER - E

75

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - E

PL-E-SD-325

PL-E-FC-325

76

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI DASAR TOWER - F

PL-F-SD-326

PL-F-FC-326

19-Mar-14

26-Mar-14

ADI

77

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - F

PL-F-SD-327

PL-F-FC-327

24-Mar-14

2-Apr-14

ADI

78

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - F

24-Mar-14

2-Apr-14

ADI

79

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - F

24-Mar-14

2-Apr-14

ADI

80

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2TOWER - F

24-Mar-14

2-Apr-14

ADI

81

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 S/D 6 TOWER - F

24-Mar-14

2-Apr-14

ADI

82

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 s/d 6 TOWER - F

24-Mar-14

2-Apr-14

ADI

83

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 ( TYPIKAL ) TOWER - F

26-Mar-14

2-Apr-14

84

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 s/d 15 TOWER - F

26-Mar-14

2-Apr-14

85

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL ) TOWER - F

26-Mar-14

2-Apr-14

86

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 s/d 33 TOWER - F

26-Mar-14

2-Apr-14

87

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - F

PL-C-SD-307

PL-C-FC-307

PL-C-SD-307.A
PL-C-SD-308

PL-C-FC-308

PL-C-SD-308.A
PL-C-SD-309

PL-C-FC-309

PL-C-SD-309.A

PL-D-SD-312.A
PL-D-SD-313

PL-D-FC-313

PL-D-SD-313.A
PL-D-SD-314

PL-D-FC-314

PL-D-SD-314.A
PL-D-SD-315

PL-D-FC-315

PL-D-SD-315.A
PL-D-SD-316

PL-D-FC-316

PL-D-SD-316.A

PL-E-SD-319.A
PL-E-SD-320

PL-E-FC-319

PL-E-SD-320.A
PL-E-SD-321

PL-E-FC-320

PL-E-SD-321.A
PL-E-SD-322

PL-E-FC-321

PL-E-SD-322.A
PL-E-SD-323

PL-E-FC-322

PL-E-SD-323.A
PL-E-SD-324

PL-E-FC-323

PL-E-SD-324.A

PL-F-SD-327.A
PL-F-SD-328

PL-F-FC-328

PL-F-SD-328.A
PL-F-SD-329

PL-F-FC-329

PL-F-SD-329.A
PL-F-SD-330

PL-F-FC-330

PL-F-SD-330.A
PL-F-SD-331

PL-F-FC-331

PL-F-SD-331.A
PL-F-SD-332

PL-F-FC-332

Page 2

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE II
STS

REV.

TANGGAL
KIRIM

KEMBALI

26-Feb-14

5-Mar-14

PENGAJUAN KE III
STS

REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

88

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI DASAR TOWER - G

PL-G-SD-333

PL-G-FC-333

12-Feb-14

19-Feb-14

89

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - G

PL-G-SD-334

PL-G-FC-334

19-Feb-14

3-Mar-14

90

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - G

PL-G-SD-334.A

PL-G-FC-334

19-Feb-14

3-Mar-14

91

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 - 6 TOWER - G

PL-G-SD-335

PL-G-FC-335

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 - 6 TOWER - G

16-Jan-14
18-Mar-14

92

11-Jan-14
10-Mar-14

93

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 - 15 ( TYPIKAL ) TOWER - G

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 - 15 TOWER - G

16-Jan-14
18-Mar-14

94

11-Jan-14
10-Mar-14

95

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 - 33 ( TYPIKAL ) TOWER - G

DETAIL SHAFT INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 - 33 TOWER - G

16-Jan-14
18-Mar-14

96

11-Jan-14
10-Mar-14

ADI

97

INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - G

PL-G-SD-338

PL-G-FC-338

98

INSTALASI AIR BERSIH LANTAI 9 TOWER - A

PL-A-SD-339

PL-G-FC-339

99

INSTALASI AIR BERSIH LANTAI 10 S/D 16 TOWER - A

PL-A-SD-340

PL-G-FC-340

100 INSTALASI AIR BERSIH LANTAI 17 S/D 21 ( TYPIKAL) TOWER - A


101 INSTALASI AIR BERSIH LANTAI 22 S/D 27 ( TYPIKAL) TOWER - A

PL-A-SD-341

PL-G-FC-341

PL-A-SD-342

PL-G-FC-342

102 INSTALASI AIR BERSIH LANTAI 28 S/D 30 TOWER - A


103 INSTALASI AIR BERSIH ROOF TANK TOWER - A

PL-A-SD-343

PL-G-FC-343

PL-A-SD-344

PL-G-FC-344

104 INSTALASI AIR BERSIH LANTAI 9 TOWER - C


105 INSTALASI AIR BERSIH LANTAI 10 S/D 16 TOWER - C

PL-C-SD-345

PL-C-FC-345

PL-C-SD-346

PL-C-FC-346

106 INSTALASI AIR BERSIH LANTAI 17 S/D 21 ( TYPIKAL) TOWER - C


107 INSTALASI AIR BERSIH LANTAI 22 S/D 27 ( TYPIKAL) TOWER - C

PL-C-SD-347

PL-C-FC-347

PL-C-SD-348

PL-C-FC-348

108 INSTALASI AIR BERSIH LANTAI 28 S/D 30 TOWER - C


109 INSTALASI AIR BERSIH ROOF TANK TOWER - C

PL-C-SD-349

PL-C-FC-349

PL-C-SD-350

PL-C-FC-350

110 INSTALASI AIR BERSIH LANTAI GF TOWER - D


111 INSTALASI AIR BERSIH LANTAI 1 TOWER - D

PL-D-SD-351

PL-D-FC-351

28-Feb-14

8-Mar-14

MIEKA

PL-D-SD-352

PL-D-FC-352

17-Feb-14

25-Feb-14

MIEKA

112 INSTALASI AIR BERSIH LANTAI 2 TOWER - D


113 INSTALASI AIR BERSIH LANTAI 3 S/D 5 ( TYPIKAL ) TOWER - D

PL-D-SD-353

PL-D-FC-353

17-Feb-14

25-Feb-14

MIEKA

PL-D-SD-354

PL-D-FC-354

17-Feb-14

25-Feb-14

MIEKA

114 INSTALASI AIR BERSIH LANTAI 6 S/D 10 ( TYPIKAL ) TOWER - D


115 INSTALASI AIR BERSIH LANTAI 11 S/D 17 ( TYPIKAL ) TOWER - D

PL-D-SD-355

PL-D-FC-355

30-Jan-14

6-Feb-14

MIEKA

PL-D-SD-356

PL-D-FC-356

30-Jan-14

6-Feb-14

MIEKA

116 INSTALASI AIR BERSIH LANTAI 18 S/D 23 ( TYPIKAL ) TOWER - D


117 INSTALASI AIR BERSIH LANTAI 25 S/D 30 ( TYPIKAL ) TOWER - D

PL-D-SD-357

PL-D-FC-357

30-Jan-14

6-Feb-14

MIEKA

PL-D-SD-358

PL-D-FC-358

30-Jan-14

6-Feb-14

MIEKA

118 INSTALASI AIR BERSIH LANTAI 31 S/D 33 ( TYPIKAL ) TOWER - D


119 INSTALASI AIR BERSIH ROOF TANK TOWER - D

PL-D-SD-359

PL-D-FC-359

30-Jan-14

6-Feb-14

MIEKA

PL-D-SD-359.A

PL-D-FC-359.A

120 INSTALASI AIR BERSIH LANTAI DASAR TOWER - E


121 INSTALASI AIR BERSIH LANTAI 1 TOWER - E

PL-E-SD-360

PL-E-FC-360

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-361

PL-E-FC-361

12-Feb-14

19-Feb-14

MIEKA

122 INSTALASI AIR BERSIH LANTAI 2 TOWER - E


123 INSTALASI AIR BERSIH LANTAI 3 TOWER - E

PL-E-SD-362

PL-E-FC-362

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-363

PL-E-FC-363

12-Feb-14

19-Feb-14

MIEKA

124 INSTALASI AIR BERSIH LANTAI 5 TOWER - E


125 INSTALASI AIR BERSIH LANTAI 6 TOWER - E

PL-E-SD-364

PL-E-FC-364

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-365

PL-E-FC-365

12-Feb-14

19-Feb-14

MIEKA

126 INSTALASI AIR BERSIH LANTAI 7 S/D 10 ( TYPIKAL ) TOWER - E


127 INSTALASI AIR BERSIH LANTAI 11 S/D 17 ( TYPIKAL ) TOWER - E

PL-E-SD-366

PL-E-FC-366

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-367

PL-E-FC-367

12-Feb-14

19-Feb-14

MIEKA

128 INSTALASI AIR BERSIH LANTAI 18 S/D 23( TYPIKAL ) TOWER - E


129 INSTALASI AIR BERSIH LANTAI 25 S/D 30 ( TYPIKAL ) TOWER - E

PL-E-SD-368

PL-E-FC-368

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-369

PL-E-FC-369

12-Feb-14

19-Feb-14

MIEKA

130 INSTALASI AIR BERSIH LANTAI 31 S/D 33 ( TYPIKAL ) TOWER - E


131 INSTALASI AIR BERSIH ROOF TANK TOWER - E

PL-E-SD-370

PL-E-FC-370

12-Feb-14

19-Feb-14

MIEKA

PL-E-SD-371

PL-E-FC-371

PL-G-SD-335.A
PL-G-SD-336

PL-G-FC-336

PL-G-SD-336.A
PL-G-SD-337

PL-G-FC-337

PL-G-SD-337.A

Page 3

ADI
ADI
ADI

10-Mar-14

18-Mar-14

10-Mar-14

18-Mar-14

10-Mar-14

18-Mar-14

ADI
ADI
ADI
ADI
ADI

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE II
STS

REV.

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE III
STS

REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

132 INSTALASI AIR BERSIH LANTAI DASAR TOWER - F


133 INSTALASI AIR BERSIH LANTAI 1 TOWER - F

PL-F-SD-372

PL-F-FC-372

28-Feb-14

8-Mar-14

PL-F-SD-373

PL-F-FC-373

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

134 INSTALASI AIR BERSIH LANTAI 2 TOWER - F


135 INSTALASI AIR BERSIH LANTAI 3 S/D 5 ( TYPIKAL ) TOWER - F

PL-F-SD-374

PL-F-FC-374

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-F-SD-375

PL-F-FC-375

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

136 INSTALASI AIR BERSIH LANTAI 6 S/D 10 ( TYPIKAL ) TOWER - F


137 INSTALASI AIR BERSIH LANTAI 11 S/D 17 ( TYPIKAL ) TOWER - F

PL-F-SD-376

PL-F-FC-376

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-F-SD-377

PL-F-FC-377

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

138 INSTALASI AIR BERSIH LANTAI 18 S/D 23 ( TYPIKAL ) TOWER - F


139 INSTALASI AIR BERSIH LANTAI 25 S/D 30 ( TYPIKAL ) TOWER - F

PL-F-SD-378

PL-F-FC-378

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-F-SD-379

PL-F-FC-379

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

140 INSTALASI AIR BERSIH LANTAI 31 S/D 33 ( TYPIKAL ) TOWER - F


141 INSTALASI AIR BERSIH ROOF TANK TOWER - F

PL-F-SD-380

PL-F-FC-380

9-Dec-13

13-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-F-SD-381

PL-F-FC-381

152 INSTALASI AIR BERSIH LANTAI DASAR TOWER - G


153 INSTALASI AIR BERSIH LANTAI 1 TOWER - G

PL-G-SD-382

PL-G-FC-382

17-Feb-14

25-Feb-14

PL-G-SD-383

PL-G-FC-383

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

154 INSTALASI AIR BERSIH LANTAI 2 S/D 5 ( TYPIKAL ) TOWER - G


155 INSTALASI AIR BERSIH LANTAI 6 S/D 10 ( TYPIKAL ) TOWER - G

PL-G-SD-384

PL-G-FC-384

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-G-SD-385

PL-G-FC-385

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

156 INSTALASI AIR BERSIH LANTAI 11 S/D 17 ( TYPIKAL ) TOWER - G


157 INSTALASI AIR BERSIH LANTAI 18 S/D 23 ( TYPIKAL ) TOWER - G

PL-G-SD-386

PL-G-FC-386

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-G-SD-387

PL-G-FC-387

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

158 INSTALASI AIR BERSIH LANTAI 25 S/D 30 ( TYPIKAL ) TOWER - G


159 INSTALASI AIR BERSIH LANTAI 31 S/D 33 ( TYPIKAL ) TOWER - G

PL-G-SD-388

PL-G-FC-388

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

PL-G-SD-389

PL-G-FC-389

2-Dec-13

7-Dec-13

23-Dec-13

4-Jan-14

MIEKA

160 INSTALASI AIR BERSIH ROOF TANK TOWER - G

PL-G-SD-390

PL-G-FC-390

PL-SD-391

PL-FC-391

162 KOMPOSIT M/E TYPIKAL UNIT TYPE STA


163 KOMPOSIT M/E TYPIKAL UNIT TYPE 1BA

PL-SD-401

PL - FC - 401

PL-SD-402

PL - FC - 402

164 KOMPOSIT M/E TYPIKAL UNIT TYPE 2BA


165 KOMPOSIT M/E TYPIKAL UNIT TYPE 2BB

PL-SD-403

PL - FC - 403

PL-SD-404

PL - FC - 404

166 KOMPOSIT M/E TYPIKAL UNIT TYPE 2BAC


167 KOMPOSIT M/E TYPIKAL UNIT TYPE 3BC

PL-SD-405

PL - FC - 405

PL-SD-406

PL - FC - 406

PL-G-SD-501

PL-G-FC-501

9-Dec-13

13-Dec-13

PL-G-SD-502

PL-G-FC-502

4-Mar-14

11-Mar-14

PL-G-SD-503

PL-G-FC-503

12-Mar-14

18-Mar-14

PL-F-SD-504

PL-F-FC-505

PL-F-SD-505

PL-F-FC-506

PL-F-SD-506

PL-F-FC-507

4-Apr-14

11-Apr-14

PL-G-SD-601

PL-G-FC-601

12-Mar-14

18-Mar-14

PL-F-SD-602

PL-F-FC-602

14-Mar-14

18-Mar-14

161 INSTALASI PLUMBING SITE PLAN

MIEKA

COMPOSIT HUNIAN

DETAIL TOILET
ADI

168 DETAIL PEMIPAAN AIR BERSIH, AIR KOTOR, AIR BEKAS & VENT TOILET PUBLIC
LANTAI BASEMENT ( TOWER - G )
169 DETAIL PEMIPAAN AIR BERSIH, AIR KOTOR, AIR BEKAS & VENT TOILET PUBLIC
LANTAI LOWER GROUND ( TOWER - G )

MIEKA

170 DETAIL PEMIPAAN AIR BERSIH, AIR KOTOR, AIR BEKAS & VENT TOILET PUBLIC
LANTAI GROUND FLOOR ( TOWER - G )
171 DETAIL PEMIPAAN AIR BERSIH, AIR KOTOR, AIR BEKAS & VENT TOILET PUBLIC

MIEKA

LANTAI BASEMENT ( TOWER - F )


172 DETAIL PEMIPAAN AIR BERSIH,AIR KOTOR,AIR BEKAS & VENT TOILET PUBLIC
LANTAI LOWER GROUND ( TOWER - F )
173 DETAIL PEMIPAAN AIR BERSIH, AIR KOTOR, AIR BEKAS & VENT TOILET PUBLIC
LANTAI GROUND FLOOR ( TOWER - F )
174 PENOMERAN SHAFT PLUMBING LANTAI 1 - 33 (TYPICAL) TOWER G
175 PENOMERAN SHAFT PLUMBING LANTAI 1 - 33 (TYPICAL) TOWER F

Page 4

ADI

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE II
STS

REV.

TANGGAL
KIRIM

KEMBALI

PENGAJUAN KE III
STS

REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

PL-SD-601

16-May-13

21-May-13

27-May-13

20-Jun-13

23-Jan-14

29-Jan-14

ADI

177 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 1 - 32 (TYPICAL) TOWER G
178 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 33 TOWER G

PL-G-SD-602

4-Jul-13

26-Jul-13

30-Aug-13

6-Sep-13

19-Feb-14

3-Mar-14

ADI

PL-G-SD-603

4-Jul-13

26-Jul-13

30-Aug-13

6-Sep-13

179 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 1 TOWER F


180 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 2 TOWER F

PL-F-SD-604

11-Mar-14

18-Mar-14

PL-F-SD-605

11-Mar-14

18-Mar-14

181 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 3 - 32 TOWER F


182 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 33 TOWER F

PL-F-SD-606

21-Aug-13

29-Aug-13

30-Aug-13

6-Sep-13

PL-F-SD-607

21-Aug-13

29-Aug-13

30-Aug-13

6-Sep-13

183 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 1 TOWER E


184 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 2 TOWER E

PL-E-SD-608

19-Mar-14

26-Mar-14

PL-E-SD-609

19-Mar-14

26-Mar-14

185 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 3 TOWER E


186 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 5 - 32 TOWER E

PL-E-SD-610

19-Mar-14

26-Mar-14

PL-E-SD-611

28-Aug-13

7-Sep-13

ADI

187 SLEEVE INSTALASI AIR BERSIH DAN SPRINKLER LANTAI 33 TOWER E

PL-E-SD-612

28-Aug-13

7-Sep-13

ADI

176 DETAIL PRINSIP POTONGAN AREA KORIDOR LT.TYPICAL INSTALASI M/E ALL TOWER

ADI
ADI
ADI
11-Mar-14

18-Mar-14

ADI
ADI

SITE PLAN
188 DETAIL PRINSIP POTONGAN PIPA AIR HUJAN SISI DALAM & SISI LUAR JALAN ( TOWER A,C,D,F & G )

PL-SD-705

PL-FC-705

PL-SD-705.A

PL-FC-705.A

190 SPARING PIPA INSTALASI M/E LANTAI LG (SITE PLAN)

PL-SD-706

PL-FC-706

191 SPARING PIPA INSTALASI M/E LANTAI LG PARSIAL (TOWER A, B & C)

PL-SD-707

PL-FC-707

192 SPARING PIPA INSTALASI M/E LANTAI LG PARSIAL (TOWER D & E)

PL-SD-708

PL-FC-708

11-Mar-14

18-Mar-14

ADI

193 SPARING PIPA INSTALASI M/E LANTAI LG PARSIAL (TOWER F & G)

PL-SD-709

PL-FC-709

24-Feb-14

5-Mar-14

ADI

194 INSTALASI TITIK SUMPIT LANTAI BASEMENT

PL-SD-710

PL-FC-710

195 INSTALASI TITIK SUMPIT PARSIAL (TOWER A,B & C) LANTAI BASEMENT

PL-SD-711

PL-FC-711

196 INSTALASI TITIK SUMPIT PARSIAL (TOWER D & E) LANTAI BASEMENT

PL-SD-712

PL-FC-712

28-Jan-14

29-Jan-14

ADI

197 INSTALASI TITIK SUMPIT PARSIAL (TOWER F & G) LANTAI BASEMENT

PL-SD-713

PL-FC-713

28-Dec-13

11-Jan-14

ADI

198 KOMPARTEMEN RUANG POMPA GWT LT. LOWER GROUND

PL-SD-801

PL-FC-801

199 KOMPARTEMEN RUANG POMPA GWT LT. BASEMENT - 1

PL-SD-802

PL-FC-802

189 DETAIL PRINSIP POTONGAN PIPA AIR HUJAN SISI DALAM & SISI LUAR JALAN ( TOWER E )

RUANG POMPA

200 DETAIL & POTONGAN SUMPIT - 12,13,14,15 & 16 LANTAI BASEMENT TOWER G

PL-G-SD-803

5-Dec-13

7-Dec-13

ADI

201 DETAIL & POTONGAN SEWAGE PIT - 07 & 08 LANTAI BASEMENT TOWER G

PL-G-SD-804

PL-G-FC-807, 809

5-Dec-13

7-Dec-13

ADI

202 DETAIL & POTONGAN SUMPIT - 10, 11 & SEWAGE PIT - 06 LANTAI BASEMENT TOWER F

PL-F-SD-805

PL-F-FC-810,811,812

5-Dec-13

7-Dec-13

ADI

203 DETAIL & POTONGAN SUMPIT - 09 LANTAI LOWER GROUND RUANG GENSET TOWER F

PL- F-SD-806

PL- F-FC-813

PL-G-FC-803,804,805,806,808

204 DETAIL & POTONGAN SUMPIT - 17. 18 & 19 LANTAI BASEMENT TOWER E

PL- E-SD-807

PL- E-FC-814

28-Jan-14

29-Jan-14

ADI

205 DETAIL & POTONGAN SUMPIT - 06, 07 & 08 LANTAI BASEMENT TOWER D

PL- D-SD-808

PL- D-FC-815

28-Jan-14

29-Jan-14

ADI

206 SLEEVE BALACING TANK LANTAI LOWER GROUND TOWER G


207 SLEEVE GWT & RWT R. POMPA AIR BERSI LT. BASEMENT TOWER E

PL-SD-901

17-Feb-14

25-Feb-14

PL-SD-902

21-Feb-14

3-Mar-14

ADI

208 TAMPAK A,B,C & D SLEEVE RWT,GWT-1,GWT-2, GWT-3,GWT-4 & GWT-5 LT. BASEMENT TOWER E

PL-SD-903

21-Feb-14

3-Mar-14

ADI

209 SLEEVE BALACING TANK LANTAI LOWER GROUND TOWER D

PL-SD-904

4-Mar-14

11-Mar-14

ADI

Page 5

4-Mar-14

11-Mar-14

ADI

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

PLUMBING

Jl. BASUKI RACHMAT No. 1A

General Contractor & Supplier

Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

PENGAJUAN KE I

REVERENSI
NO. FORCONST

TANGGAL

PENGAJUAN KE II
TANGGAL

PENGAJUAN KE III

7-Apr-14

ADI

KIRIM

KEMBALI

REV.

KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

REV.

KEMBALI

STS

TANGGAL

STS

KIRIM

210 INSTALASI TITIK MAINDRAIN AREA KOLAM RENANG TOWER F

PL-SD-905

29-Mar-14

211 POTONGAN - A, POTONGAN - B & POTONGAN - C (TOWER - F)

PL-SD-906

29-Mar-14

7-Apr-14

ADI

212 INSTALASI TITIK MAINDRAIN AREA KOLAM RENANG TOWER G

PL-SD-907

29-Mar-14

7-Apr-14

ADI

213 POTONGAN - A, POTONGAN - B & POTONGAN - C (TOWER - G)

PL-SD-908

29-Mar-14

7-Apr-14

ADI

Page 6

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI
General Contractor & Supplier
OFFICE : KOMPLEK RUKO NIAGA KALIMAS 2
Jl. Kalimas Raya Inspeksi Kalimalang
Setiadarma - Bekasi 17510
Telp / Fax : (021) 88374620

PEMADAM KEBAKARAN

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

PENGIRIMAN I

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

TANGGAL

NO. FORCONST

PENGIRIMAN II
STS

REV.

TANGGAL
KIRIM

KEMBALI

PENGIRIMAN III
STS REV.

TANGGAL
KEMBALI

REV.

Dibuat oleh :

KEMBALI

10-Feb-14

19-Feb-14

3-Dec-13

7-Dec-13

10-Feb-14

19-Feb-14

ADI

4-Mar-14

11-Mar-14

ADI

PEMADAM KEBAKARAN

KIRIM

STS

KIRIM

General Contra

UMUM
1 DAFTAR GAMBAR PEMADAM KEBAKARAN

PK-SD-001

PK - FC - 001

2 SIMBOL SINGKATAN

PK-SD-002

PK - FC - 002

PK-SD-101

PK - FC - 101

PK-FC-102

PK - FC - 102

PK-SD-201

PK - FC - 201

PK-SD-202

PK - FC - 202

7 INSTALASI PEMADAM KEBAKARAN LT. BASEMENT TOWER E,F,G ( LEMBAR-2 )


8 INSTALASI PEMADAM KEBAKARAN LANTAI LG TOWER A,B,C,D ( LEMBAR-1 )

PK-SD-203

PK - FC - 203

PK-SD-204

PK - FC - 204

DIAGRAM
3 DIAGRAM SYSTEM PEMADAM KEBAKARAN TOWER A,B,C & MALL ( LEMBAR -1 )
4 DIAGRAM SYSTEM PEMADAM KEBAKARAN D,E,F & G ( LEMBAR -2 )

INSTALASI
5 INSTALASI PEMADAM KEBAKARAN SITE PLAN
6 INSTALASI PEMADAM KEBAKARAN LT. BASEMENT TOWER A,B,C,D ( LEMBAR-1 )

9 INSTALASI PEMADAM KEBAKARAN LANTAI LG TOWER E,F,G ( LEMBAR-2 )

PK-SD-205

PK - FC - 205

10 INSTALASI PEMADAM KEBAKARAN AREA PARKIR LANTAI - 3


11 INSTALASI PEMADAM KEBAKARAN AREA PARKIR LANTAI - 5

PK-SD-206

PK - FC - 206

PK-SD-207

PK - FC - 207

12 INSTALASI PEMADAM KEBAKARAN AREA PARKIR LANTAI - 6


13 INSTALASI PEMADAM KEBAKARAN AREA PARKIR LANTAI - 7

PK-SD-208

PK - FC - 208

PK-SD-209

PK - FC - 209

14 INSTALASI PEMADAM KEBAKARAN AREA PARKIR LANTAI - 8

PK-SD-210

PK - FC - 210

15 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 9 TOWER - A


16 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 10 S/D 12 TOWER - A

PK-A-SD-301

PK-A-FC-301

PK-A-SD-302

PK-A-FC-302

17 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 15 S/D 30 TOWER - A


18 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - A

PK-A-SD-303

PK-A-FC-303

PK-A-SD-304

PK-A-FC-304

19 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 9 TOWER - C

PK-C-SD-305

PK-C-FC-305

20 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 10 S/D 12 TOWER - C


21 INSTALASI PEMADAM KEBAKARAN PARKIR LANTAI 15 S/D 30 TOWER - C

PK-C-SD-306

PK-C-FC-306

PK-C-SD-307

PK-C-FC-307

22 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - C

PK-C-SD-308

PK-C-FC-308

23 INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - D


24 INSTALASI PEMADAM KEBAKARAN LANTAI 1 TOWER - D

PK-D-SD-309

PK-D-FC-309

PK-D-SD-310

PK-D-FC-310

25 INSTALASI PEMADAM KEBAKARAN LANTAI 2 TOWER - D


26 INSTALASI PEMADAM KEBAKARAN LANTAI 3 S/D 12 ( TYPIKAL ) TOWER - D

PK-D-SD-311

PK-D-FC-311

PK-D-SD-312

PK-D-FC-312

Page 7

ADI

11-Jan-14

17-Jan-14

ADI

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI
General Contractor & Supplier
OFFICE : KOMPLEK RUKO NIAGA KALIMAS 2
Jl. Kalimas Raya Inspeksi Kalimalang
Setiadarma - Bekasi 17510
Telp / Fax : (021) 88374620

PEMADAM KEBAKARAN

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

PENGIRIMAN I

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

TANGGAL

NO. FORCONST

PENGIRIMAN II
STS

REV.

11-Mar-14

KIRIM

KEMBALI

4-Mar-14

TANGGAL
KIRIM

KEMBALI

PENGIRIMAN III
STS REV.

TANGGAL
KIRIM

KEMBALI

STS

REV.

Dibuat oleh :

General
Contra
ADI

27 INSTALASI PEMADAM KEBAKARAN LANTAI 15 S/D 33 ( TYPIKAL ) TOWER - D


28 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - D

PK-D-SD-313

PK-D-FC-313

PK-D-SD-314

PK-D-FC-314

29 INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - E


30 INSTALASI PEMADAM KEBAKARAN LANTAI 1 TOWER - E

PK-E-SD-315

PK-E-FC-315

PK-E-SD-316

PK-E-FC-316

12-Mar-14

18-Mar-14

ADI

31 INSTALASI PEMADAM KEBAKARAN LANTAI 2 TOWER - E


32 INSTALASI PEMADAM KEBAKARAN LANTAI 3 TOWER - E

PK-E-SD-317

PK-E-FC-317

12-Mar-14

18-Mar-14

ADI

PK-E-SD-318

PK-E-FC-318

12-Mar-14

18-Mar-14

ADI

33 INSTALASI PEMADAM KEBAKARAN LANTAI 5 TOWER - E


34 INSTALASI PEMADAM KEBAKARAN LANTAI 6 TOWER - E

PK-E-SD-319

PK-E-FC-319

28-Feb-14

8-Mar-14

ADI

PK-E-SD-320

PK-E-FC-320

28-Feb-14

8-Mar-14

ADI

35 INSTALASI PEMADAM KEBAKARAN LANTAI 7 S/D 12 ( TYPIKAL ) TOWER - E


36 INSTALASI PEMADAM KEBAKARAN LANTAI 15 S/D 33 ( TYPIKAL ) TOWER - E

PK-E-SD-321

PK-E-FC-321

28-Feb-14

8-Mar-14

ADI

PK-E-SD-322

PK-E-FC-322

10-Feb-14

19-Feb-14

0
0

37 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER -E

PK-E-SD-323

PK-E-FC-323

38 INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - F


39 INSTALASI PEMADAM KEBAKARAN LANTAI 1 TOWER - F

PK-F-SD-324

PK-F-FC-324

12-Mar-14

18-Mar-14

PK-F-SD-325

PK-F-FC-325

11-Jan-14

17-Jan-14

23-Jan-14

29-Jan-14

ADI

40 INSTALASI PEMADAM KEBAKARAN LANTAI 2 TOWER - F

PK-F-SD-326

PK-F-FC-326

11-Jan-14

17-Jan-14

23-Jan-14

29-Jan-14

ADI

41 INSTALASI PEMADAM KEBAKARAN LANTAI 3 S/D 12 ( TYPIKAL ) TOWER - F

PK-F-SD-327

PK-F-FC-327

11-Jan-14

17-Jan-14

23-Jan-14

29-Jan-14

ADI

42 INSTALASI PEMADAM KEBAKARAN LANTAI 15 S/D 33 ( TYPIKAL ) TOWER - F

PK-F-SD-328

PK-F-FC-328

11-Jan-14

17-Jan-14

23-Jan-14

29-Jan-14

ADI

43 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - F

PK-F-SD-329

PK-F-FC-329

44 INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - G


45 INSTALASI PEMADAM KEBAKARAN LANTAI 1 TOWER - G

PK-G-SD-330

PK-G-FC-330

20-Feb-14

3-Mar-14

PK-G-SD-331

PK-G-FC-331

20-Dec-13

4-Jan-14

23-Jan-14

29-Jan-14

ADI

46 INSTALASI PEMADAM KEBAKARAN LANTAI 2 S/D 12 ( TYPIKAL ) TOWER - G


47 INSTALASI PEMADAM KEBAKARAN LANTAI 15 S/D 33 ( TYPIKAL ) TOWER - G

PK-G-SD-332

PK-G-FC-332

20-Dec-13

4-Jan-14

23-Jan-14

29-Jan-14

ADI

PK-G-SD-333

PK-G-FC-333

20-Dec-13

4-Jan-14

23-Jan-14

29-Jan-14

ADI

48 INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - G

PK-G-SD-334

PK-G-FC-334

DETAIL
49 STANDAR DETAIL PEMADAM KEBAKARAN
50 DETAIL STANDAR IHB & OHB

PK-SD-401

PK-FC-301

PK-SD-402

PK-FC-301.A

Page 8

ADI

ADI

ADI

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

PENGIRIMAN KE III

TANGGAL
STS

KIRIM

KEMBALI

REV.

STS REV.
KIRIM

Dibuat oleh :

TANGGAL

KEMBALI

STS
KIRIM

ELEKTRONIK

KEMBALI

REV.

General Con

UMUM
1

DAFTAR GAMBAR ELEKTRONIK

EC-SD-001

EC-FC-001

SIMBOL-SIMBOL ELEKTRONIK

EC-SD-002

EC-FC-002

DIAGRAM
3

DIAGRAM SISTEM FIRE ALARM TOWER-A, C, D, E, F & G

EC-SD-101

EC-FC-101

19-Mar-14

26-Mar-14

ANWAR

DIAGRAM SISTEM FIRE ALARM TOWER-A & C

EC-SD-102

EC-FC-102

19-Mar-14

26-Mar-14

ANWAR

DIAGRAM SISTEM FIRE ALARM TOWER-D & E

EC-SD-103

EC-FC-103

19-Mar-14

26-Mar-14

ANWAR

DIAGRAM SISTEM FIRE ALARM TOWER-F & G

EC-SD-104

EC-FC-104

19-Mar-14

26-Mar-14

ANWAR

DIAGRAM SISTEM TATA SUARA TOWER-A, C, D, E, F & G

EC-SD-105

EC-FC-105

8-Feb-14

19-Feb-14

ANWAR

DIAGRAM SISTEM TATA SUARA TOWER-A & C

EC-SD-106

EC-FC-106

19-Mar-14

26-Mar-14

ANWAR

DIAGRAM SISTEM TATA SUARA TOWER-D & E

EC-SD-107

EC-FC-107

19-Mar-14

26-Mar-14

10

DIAGRAM SISTEM TATA SUARA TOWER- F & G

EC-SD-108

EC-FC-108

12-Mar-14

18-Mar-14

11

DIAGRAM SISTEM TELEPHONE TOWER-A, C, D, E, F & G

EC-SD-109

EC-FC-109

12

DIAGRAM SISTEM MATV TOWER-A,C,D,E,F & G

EC-SD-110

EC-FC-110

13

DIAGRAM SISTEM MATV TOWER-A & C

EC-SD-111

EC-FC-111

14

DIAGRAM SISTEM MATV TOWER-D & E

EC-SD-112

EC-FC-112

15

DIAGRAM SISTEM MATV TOWER-F & G

EC-SD-113

EC-FC-113

16

DIAGRAM SISTEM CCTV TOWER-A,C,D,E,F & G

EC-SD-114

EC-FC-114

17

DIAGRAM SISTEM SECURITY INTERCOM TOWER-A, C, D, E, F & G

EC-SD-115

EC-FC-115

18

DIAGRAM SISTEM ACCESS CONTROL TOWER-A, C, D, E, F & G

EC-SD-116

EC-FC-116

8-Feb-14

19-Feb-14

ANWAR

19

DIAGRAM SISTEM ACCESS CONTROL TOWER-A,C & D

EC-SD-117

EC-FC-117

8-Feb-14

19-Feb-14

ANWAR

20

DIAGRAM SISTEM ACCESS CONTROL TOWER-E, F & G

EC-SD-118

EC-FC-118

8-Feb-14

19-Feb-14

ANWAR

19-Mar-14

26-Mar-14

ANWAR

INSTALASI
21

INSTALASI FIRE ALARM LANTAI BASEMENT TOWER A, B & C

EC-SD-201

EC-FC-201

22

INSTALASI FIRE ALARM LANTAI BASEMENT TOWER D & E

EC-SD-202

EC-FC-202

24-Feb-14

5-Mar-14

ANWAR

23

INSTALASI FIRE ALARM LANTAI BASEMENT TOWER F & G

EC-SD-203

EC-FC-203

23-Dec-13

4-Jan-14

ANWAR

24

INSTALASI FIRE ALARM LANTAI LG TOWER A & C

EC-SD-204

EC-FC-204

25

INSTALASI FIRE ALARM LANTAI LG TOWER D & E

EC-SD-205

EC-FC-205

26

INSTALASI FIRE ALARM LANTAI LG TOWER F & G

EC-SD-206

EC-FC-206

29-Jan-14

1-Feb-14

ANWAR

27

INSTALASI TATA SUARA LANTAI BASEMENT TOWER A & C

EC-SD-207

EC-FC-207

28

INSTALASI TATA SUARA LANTAI BASEMENT TOWER D & E

EC-SD-207.A

EC-FC-207.A

19-Mar-14

26-Mar-14

29

INSTALASI TATA SUARA LANTAI BASEMENT TOWER F & G

EC-SD-208

EC-FC-208

20-Dec-13

4-Jan-14

30

INSTALASI TATA SUARA LANTAI LG TOWER A & C

EC-SD-209

EC-FC-209

31

INSTALASI TATA SUARA LANTAI LG TOWER D & E

EC-SD-209.A

EC-FC-209.A

19-Mar-14

26-Mar-14

ANWAR

32

INSTALASI TATA SUARA LANTAI LG TOWER F & G

EC-SD-210

EC-FC-210

28-Jan-14

1-Feb-14

ANWAR

33

INSTALASI CCTV LANTAI BASEMENT TOWER A & C

EC-SD-211

EC-FC-211

34

INSTALASI CCTV LANTAI BASEMENT TOWER D & E

EC-SD-211.A

EC-FC-211.A

19-Mar-14

26-Mar-14

35

INSTALASI CCTV LANTAI BASEMENT TOWER F & G

EC-SD-212

EC-FC-212

20-Dec-13

4-Jan-14

ANWAR

Page 9

11-Jan-14

11-Jan-14

21-Jan-14

21-Jan-14

ANWAR

ANWAR

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

PENGIRIMAN KE III

TANGGAL
STS

KIRIM

KEMBALI

REV.

STS REV.
KIRIM

Dibuat oleh :

TANGGAL

KEMBALI

STS
KIRIM

KEMBALI

REV.

General Con

36

INSTALASI CCTV LANTAI LG TOWER A & C

EC-SD-213

EC-FC-213

37

INSTALASI CCTV LANTAI LG TOWER D & E

EC-SD-213.A

EC-FC-213.A

19-Mar-14

26-Mar-14

ANWAR

38

INSTALASI CCTV LANTAI LG TOWER F & G

EC-SD-214

EC-FC-214

11-Jan-14

21-Jan-14

ANWAR

39

INSTALASI TATA SUARA AREA SITE PLAN (LEMBAR 1)

EC-SD-215

EC-FC-215

40

INSTALASI TATA SUARA AREA SITE PLAN (LEMBAR 2)

EC-SD-216

EC-FC-216

41

DETAIL PEMASANGAN HORN SPEAKER LANTAI BASEMENT

EC-SD-217

EC-FC-207, 208

3-Dec-13

7-Dec-13

ANWAR

42

DETAIL PEMASANGAN CCTV LANTAI BASEMENT

EC-SD-218

EC-FC-211 , 212

23-Dec-13

4-Jan-14

ANWAR

43

INSTALASI FIRE ALARM LANTAI 9 TOWER - A

EC-A-SD-301

EC-A-FC-301

44

INSTALASI FIRE ALARM LANTAI 10 s/d 12 (TYPICAL) TOWER - A

EC-A-SD-302

EC-A-FC-302

45

INSTALASI FIRE ALARM LANTAI 15 s/d 30 (TYPIKAL) TOWER - A

EC-A-SD-303

EC-A-FC-303

46

INSTALASI FIRE ALARM LANTAI ATAP TOWER - A

EC-A-SD-304

EC-A-FC-304

47

INSTALASI FIRE ALARM LANTAI 9 TOWER - C

EC-C-SD-305

EC-C-FC-305

48

INSTALASI FIRE ALARM LANTAI 10 s/d 12 (TYPICAL) TOWER - C

EC-C-SD-306

EC-C-FC-306

49

INSTALASI FIRE ALARM LANTAI 15 s/d 30 (TYPIKAL) TOWER - C

EC-C-SD-307

EC-C-FC-307

50

INSTALASI FIRE ALARM LANTAI ATAP TOWER - C

EC-C-SD-308

EC-C-FC-308

51

INSTALASI FIRE ALARM LANTAI GF TOWER.D

EC-D-SD-309

EC-D-FC-309

10-Apr-14

14-Apr-14

ANWAR

52

INSTALASI FIRE ALARM LANTAI 1 TOWER - D

EC-D-SD-310

EC-D-FC-310

53

INSTALASI FIRE ALARM LANTAI 2 TOWER - D

EC-D-SD-311

EC-D-FC-311

54

INSTALASI FIRE ALARM LANTAI 3 s/d 33 (TYPIKAL) TOWER - D

EC-D-SD-312

EC-D-FC-312

19-Mar-14

26-Mar-14

ANWAR

55

INSTALASI FIRE ALARM LANTAI 15 s/d 28 (TYPIKAL) TOWER - D

EC-D-SD-313

EC-D-FC-313

56

INSTALASI FIRE ALARM LANTAI ATAP TOWER - D

EC-D-SD-314

EC-D-FC-314

57

INSTALASI FIRE ALARM LANTAI GF TOWER.E

EC-E-SD-315

EC-E-FC-315

26-Mar-14

2-Apr-14

ANWAR

58

INSTALASI FIRE ALARM LANTAI-1 TOWER.E

EC-E-SD-316

EC-E-FC-316

26-Mar-14

2-Apr-14

ANWAR

59

INSTALASI FIRE ALARM LANTAI-2 TOWER.E

EC-E-SD-317

EC-E-FC-317

26-Mar-14

2-Apr-14

ANWAR

60

INSTALASI FIRE ALARM LANTAI-3 TOWER.E

EC-E-SD-318

EC-E-FC-318

26-Mar-14

2-Apr-14

ANWAR

61

INSTALASI FIRE ALARM LANTAI-5 s/d 33 (TYPIKAL) TOWER.E

EC-E-SD-319

EC-E-FC-319,320,321

12-Mar-14

18-Mar-14

ANWAR

62

INSTALASI FIRE ALARM LANTAI ATAP TOWER.E

EC-E-SD-320

EC-E-FC-322

63

INSTALASI FIRE ALARM LANTAI GF TOWER.F

EC-F-SD-321

EC-F-FC-323

18-Dec-13

4-Jan-14

ANWAR

64

INSTALASI FIRE ALARM LANTAI-1 s/d 12 (TYPIKAL) TOWER.F

EC-F-SD-322

EC-F-FC-324,325,326

18-Dec-13

4-Jan-14

65

INSTALASI FIRE ALARM LANTAI-15 s/d 33 (TYPIKAL) TOWER.F

EC-F-SD-323

EC-F-FC-327

18-Dec-13

4-Jan-14

66

INSTALASI FIRE ALARM LANTAI ATAP TOWER.F

EC-F-SD-324

EC-F-FC-328

67

INSTALASI FIRE ALARM LANTAI GF TOWER.G

EC-G-SD-325

EC-G-FC-329

18-Dec-13

4-Jan-14

68

INSTALASI FIRE ALARM LANTAI-1 s/d 12 (TYPIKAL) TOWER.G

EC-G-SD-326

EC-G-FC-330,331

18-Dec-13

4-Jan-14

69

INSTALASI FIRE ALARM LANTAI-15 s/d 33 (TYPIKAL) TOWER.G

EC-G-SD-327

EC-G-FC-332

18-Dec-13

4-Jan-14

17-Mar-14

70

INSTALASI FIRE ALARM LANTAI ATAP TOWER.G

EC-G-SD-328

EC-G-FC-333

Page 10

ANWAR
17-Mar-14

24-Mar-14

ANWAR

26-Jan-14

5-Mar-14

ANWAR

17-Mar-14

24-Mar-14

ANWAR

24-Mar-14

ANWAR

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

PENGIRIMAN KE III

TANGGAL
STS

KIRIM

KEMBALI

REV.

STS REV.
KIRIM

Dibuat oleh :

TANGGAL

KEMBALI

STS
KIRIM

KEMBALI

REV.

General Con

71

INSTALASI TATA SUARA LANTAI-9 TOWER.A

EC-A-SD-329

EC-A-FC-334

72

INSTALASI TATA SUARA LANTAI-10 s/d 30 (TYPICAL) TOWER.A

EC-A-SD-330

EC-A-FC-335

73

INSTALASI TATA SUARA LANTAI ATAP TOWER.A

EC-A-SD-331

EC-A-FC-336

74

INSTALASI TATA SUARA LANTAI-9 TOWER.C

EC-C-SD-332

EC-C-FC-337

75

INSTALASI TATA SUARA LANTAI-10 s/d 30 (TYPICAL) TOWER.C

EC-C-SD-333

EC-C-FC-338

76

INSTALASI TATA SUARA LANTAI ATAP TOWER.C

EC-C-SD-334

EC-C-FC-339

77

INSTALASI TATA SUARA LANTAI GF TOWER.D

EC-D-SD-335

EC-D-FC-340

78

INSTALASI TATA SUARA LANTAI-1 TOWER.D

EC-D-SD-336

EC-D-FC-341

4-Apr-14

11-Apr-14

ANWAR

79

INSTALASI TATA SUARA LANTAI-2 TOWER.D

EC-D-SD-337

EC-D-FC-341.A

4-Apr-14

11-Apr-14

ANWAR

80

INSTALASI TATA SUARA LANTAI-3 s/d 28 (TYPICAL) TOWER.D

EC-D-SD-338

EC-D-FC-342

4-Apr-14

11-Apr-14

ANWAR

81

INSTALASI TATA SUARA LANTAI ATAP TOWER.D

EC-D-SD-339

EC-D-FC-343

82

INSTALASI TATA SUARA LANTAI GF TOWER - E

EC-E-SD-340

EC-E-FC-344

29-Mar-14

7-Apr-14

ANWAR

83

INSTALASI TATA SUARA LANTAI 1 TOWER - E

EC-E-SD-341

EC-E-FC-345

19-Mar-14

26-Mar-14

ANWAR

84

INSTALASI TATA SUARA LANTAI 2 TOWER - E

EC-E-SD-342

EC-E-FC-346

19-Mar-14

26-Mar-14

ANWAR

85

INSTALASI TATA SUARA LANTAI 3 TOWER - E

EC-E-SD-343

EC-E-FC-347

19-Mar-14

26-Mar-14

ANWAR

86

INSTALASI TATA SUARA LANTAI-5 s/d 33 (TYPIKAL) TOWER - E

EC-E-SD-344

EC-E-FC-348,349,350

19-Mar-14

26-Mar-14

ANWAR

87

INSTALASI TATA SUARA LANTAI ATAP TOWER - E

EC-E-SD-345

EC-E-FC-351

88

INSTALASI TATA SUARA LANTAI GF TOWER - F

EC-F-SD-346

EC-F-FC-352

18-Dec-13

4-Jan-14

7-Mar-14

11-Mar-14

14-Mar-14

18-Mar-14

ANWAR

89

INSTALASI TATA SUARA LANTAI 1 s/d 33 (TYPIKAL) TOWER - F

EC-F-SD-347

EC-F-FC-353,354,355

18-Dec-13

4-Jan-14

7-Mar-14

11-Mar-14

14-Mar-14

18-Mar-14

ANWAR

90

INSTALASI TATA SUARA LANTAI ATAP TOWER - F

EC-F-SD-348

EC-F-FC-356

91

INSTALASI TATA SUARA LANTAI GF TOWER - G

EC-G-SD-349

EC-G-FC-357

18-Dec-13

4-Jan-14

28-Feb-14

5-Mar-14

14-Mar-14

18-Mar-14

ANWAR

92

INSTALASI TATA SUARA LANTAI 1 s/d 33 (TYPIKAL) TOWER - G

EC-G-SD-350

EC-G-FC-358,359

18-Dec-13

4-Jan-14

28-Feb-14

5-Mar-14

14-Mar-14

18-Mar-14

ANWAR

93

INSTALASI TATA SUARA LANTAI ATAP TOWER - G

EC-G-SD-351

EC-G-FC-360

94

INSTALASI TELEPHONE LANTAI GF TOWER - A

EC-A-SD-352

EC-A-FC-361

95

INSTALASI TELEPHONE LANTAI GF TOWER - C

EC-C-SD-353

EC-C-FC-362

96

INSTALASI TELEPHONE LANTAI GF TOWER - D

EC-D-SD-354

EC-D-FC-363

97

INSTALASI TELEPHONE LANTAI GF TOWER - E

EC-E-SD-355

EC-E-FC-364

4-Apr-14

11-Apr-14

98

INSTALASI TELEPHONE LANTAI GF TOWER - F

EC-F-SD-356

EC-F-FC-365

14-Mar-14

18-Mar-14

99

INSTALASI TELEPHONE LANTAI GF TOWER - G

EC-G-SD-357

EC-G-FC-366

28-Feb-14

5-Mar-14

100 INSTALASI MATV LANTAI 9 TOWER - A

EC-A-SD-358

EC-A-FC-367

101 INSTALASI MATV LANTAI 10 s/d 30 (TYPICAL) TOWER - A

EC-A-SD-359

EC-A-FC-368

Page 11

ANWAR
ANWAR
17-Mar-14

24-Mar-14

ANWAR

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

PENGIRIMAN KE III

TANGGAL
STS

KIRIM

KEMBALI

REV.

STS REV.
KIRIM

KEMBALI

Dibuat oleh :

TANGGAL
STS
KIRIM

KEMBALI

REV.

General Con

102 INSTALASI MATV LANTAI 9 TOWER - C

EC-C-SD-360

EC-C-FC-369

103 INSTALASI MATV LANTAI 10 s/d 30 (TYPICAL) TOWER - C

EC-C-SD-361

EC-C-FC-370

104 INSTALASI MATV LANTAI GF TOWER -D

EC-D-SD-362

EC-D-FC-371

105 INSTALASI MATV LANTAI 1 TOWER - D

EC-D-SD-363

EC-D-FC-372

106 INSTALASI MATV LANTAI 2 TOWER - D

EC-D-SD-364

EC-D-FC-373

107 INSTALASI MATV LANTAI 3 s/d 28 (TYPIKAL) TOWER - D

EC-D-SD-365

EC-D-FC-374

108 INSTALASI MATV LANTAI 1 TOWER - E

EC-E-SD-366

EC-E-FC-375

109 INSTALASI MATV LANTAI 2 TOWER - E

EC-E-SD-367

EC-E-FC-376

110 INSTALASI MATV LANTAI 3 TOWER - E

EC-E-SD-368

EC-E-FC-377

111 INSTALASI MATV LANTAI 5 TOWER - E

EC-E-SD-369

EC-E-FC-378

112 INSTALASI MATV LANTAI 6 TOWER - E

EC-E-SD-370

EC-E-FC-379

113 INSTALASI MATV LANTAI 7 s/d 33 (TYPIKAL) TOWER - E

EC-E-SD-371

EC-E-FC-380

114 INSTALASI MATV LANTAI GF TOWER - F

EC-F-SD-372

EC-F-FC-381

14-Mar-14

18-Mar-14

ANWAR

115 INSTALASI MATV LANTAI 1 s/d 33 (TYPIKAL) TOWER - F

EC-F-SD-373

EC-F-FC-382,383,384

12-Apr-14

21-Apr-14

ANWAR

116 INSTALASI MATV LANTAI 1 s/d 33 (TYPIKAL) TOWER - G

EC-G-SD-374

EC-G-FC-385,386,387

12-Apr-14

21-Apr-14

ANWAR

117 INSTALASI CCTV LANTAI GF TOWER - A

EC-A-SD-375

EC-A-FC-388

118 INSTALASI CCTV LANTAI GF TOWER - B

EC-B-SD-376

EC-B-FC-389

119 INSTALASI CCTV LANTAI GF TOWER - C

EC-C-SD-377

EC-C-FC-390

120 INSTALASI CCTV LANTAI GF TOWER - D

EC-D-SD-378

EC-D-FC-391

121 INSTALASI CCTV LANTAI GF TOWER - E

EC-E-SD-389

EC-E-FC-392

122 INSTALASI CCTV LANTAI GF TOWER - F

EC-F-SD-380

EC-F-FC-393

7-Mar-14

11-Mar-14

ANWAR

123 INSTALASI CCTV LANTAI GF TOWER - G

EC-G-SD-381

EC-G-FC-394

26-Jan-14

5-Mar-14

ANWAR

124 INSTALASI AUDIO PHONE LANTAI GF TOWER A

EC-A-SD-382

EC-A-FC-395

125 INSTALASI AUDIO PHONE LANTAI 9 s/d 30 TOWER A

EC-A-SD-383

EC-A-FC-396

126 INSTALASI AUDIO PHONE LANTAI GF TOWER C

EC-C-SD-384

EC-C-FC-397

127 INSTALASI AUDIO PHONE LANTAI 9 s/d 30 TOWER C

EC-C-SD-385

EC-C-FC-398

128 INSTALASI AUDIO PHONE LANTAI GF TOWER D

EC-D-SD-386

EC-D-FC-399

10-Apr-14

14-Apr-14

ANWAR

129 INSTALASI AUDIO PHONE LANTAI 2 TOWER D

EC-D-SD-387

EC-D-FC-399.A

4-Apr-14

11-Apr-14

ANWAR

130 INSTALASI AUDIO PHONE LANTAI 3 s/d 33 TOWER D

EC-D-SD-388

EC-D-FC-400

4-Apr-14

11-Apr-14

ANWAR

131 INSTALASI AUDIO PHONE LANTAI GF TOWER E

EC-E-SD-389

EC-E-FC-401

4-Apr-14

11-Apr-14

ANWAR

132 INSTALASI AUDIO PHONE LANTAI 5 s/d 33 TOWER E

EC-E-SD-390

EC-E-FC-402

4-Apr-14

11-Apr-14

ANWAR

Page 12

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

PENGIRIMAN KE III

TANGGAL
STS

KIRIM

KEMBALI

REV.

STS REV.
KIRIM

KEMBALI

Dibuat oleh :

TANGGAL
STS
KIRIM

KEMBALI

REV.

General Con

134 INSTALASI AUDIO PHONE LANTAI GF TOWER F

EC-F-SD-391

EC-F-FC-403

7-Mar-14

11-Mar-14

ANWAR

135 INSTALASI AUDIO PHONE LANTAI 1 s/d 33 TOWER F

EC-F-SD-392

EC-F-FC-404,405,406

7-Mar-14

11-Mar-14

ANWAR

136 INSTALASI AUDIO PHONE LANTAI GF TOWER G

EC-G-SD-393

EC-G-FC-407

26-Jan-14

5-Mar-14

ANWAR

137 INSTALASI AUDIO PHONE LANTAI 1 s/d 33 TOWER G

EC-G-SD-394

EC-G-FC-408,409

28-Feb-14

5-Mar-14

ANWAR

138 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER A

EC-A-SD-395

EC-A-FC-411

139 INSTALASI ACCESS CONTROL LANTAI LG TOWER A

EC-A-SD-396

EC-A-FC-412

140 INSTALASI ACCESS CONTROL LANTAI GF TOWER A

EC-A-SD-397

EC-A-FC-413

141 INSTALASI ACCESS CONTROL LANTAI 1 TOWER A

EC-A-SD-398

EC-A-FC-414

142 INSTALASI ACCESS CONTROL LANTAI 2 TOWER A

EC-A-SD-399

EC-A-FC-415

143 INSTALASI ACCESS CONTROL LANTAI 3 TOWER A

EC-A-SD-400

EC-A-FC-416

144 INSTALASI ACCESS CONTROL LANTAI 5 TOWER A

EC-A-SD-401

EC-A-FC-417

145 INSTALASI ACCESS CONTROL LANTAI 6 TOWER A

EC-A-SD-402

EC-A-FC-418

146 INSTALASI ACCESS CONTROL LANTAI 7 TOWER A

EC-A-SD-403

EC-A-FC-419

147 INSTALASI ACCESS CONTROL LANTAI 8 TOWER A

EC-A-SD-404

EC-A-FC-420

148 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER C

EC-C-SD-405

EC-C-FC-421

149 INSTALASI ACCESS CONTROL LANTAI LG TOWER C

EC-C-SD-406

EC-C-FC-422

150 INSTALASI ACCESS CONTROL LANTAI GF TOWER C

EC-C-SD-407

EC-C-FC-423

151 INSTALASI ACCESS CONTROL LANTAI 1 TOWER C

EC-C-SD-408

EC-C-FC-424

152 INSTALASI ACCESS CONTROL LANTAI 2 TOWER C

EC-C-SD-409

EC-C-FC-425

153 INSTALASI ACCESS CONTROL LANTAI 3 TOWER C

EC-C-SD-410

EC-C-FC-426

154 INSTALASI ACCESS CONTROL LANTAI 5 TOWER C

EC-C-SD-411

EC-C-FC-427

155 INSTALASI ACCESS CONTROL LANTAI 6 TOWER C

EC-C-SD-412

EC-C-FC-428

156 INSTALASI ACCESS CONTROL LANTAI 7 TOWER C

EC-C-SD-413

EC-C-FC-429

157 INSTALASI ACCESS CONTROL LANTAI 8 TOWER C

EC-C-SD-414

EC-C-FC-430

158 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER D

EC-D-SD-415

EC-D-FC-431

29-Mar-14

7-Apr-14

ANWAR

159 INSTALASI ACCESS CONTROL LANTAI LG TOWER D

EC-D-SD-416

EC-D-FC-432

29-Mar-14

7-Apr-14

ANWAR

160 INSTALASI ACCESS CONTROL LANTAI GF TOWER D

EC-D-SD-417

EC-D-FC-433

7-Apr-14

14-Apr-14

ANWAR

161 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER E

EC-E-SD-418

EC-E-FC-434

29-Mar-14

7-Apr-14

ANWAR

162 INSTALASI ACCESS CONTROL LANTAI LG TOWER E

EC-E-SD-419

EC-E-FC-435

29-Mar-14

7-Apr-14

ANWAR

163 INSTALASI ACCESS CONTROL LANTAI GF TOWER E

EC-E-SD-420

EC-E-FC-436

7-Apr-14

14-Apr-14

ANWAR

164 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER F

EC-F-SD-425

EC-F-FC-437

28-Jan-14

1-Feb-14

ANWAR

165 INSTALASI ACCESS CONTROL LANTAI LG TOWER F

EC-F-SD-426

EC-F-FC-438

28-Jan-14

1-Feb-14

ANWAR

166 INSTALASI ACCESS CONTROL LANTAI GF TOWER F

EC-F-SD-427

EC-F-FC-439

14-Mar-14

18-Mar-14

ANWAR

Page 13

PT. SYNTHESIS KARYA PRATAMA

MONITORING SHOP DRAWING BASURA CITY

KONTRAKTOR

MANAJEMEN KONSTRUKSI

ELEKTRONIK

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

REVERENSI
NO.

JUDUL DRAWING

NO. GAMBAR

PENGIRIMAN KE I

PENGIRIMAN KE II

TANGGAL

NO. FORCONST

STS

REV.

STS REV.
KIRIM

STS

28-Jan-14

1-Feb-14

0
0

ANWAR

ANWAR

EC-G-SD-428

EC-G-FC-440

EC-G-SD-429

EC-G-FC-441

28-Jan-14

1-Feb-14

169 INSTALASI ACCESS CONTROL LANTAI GF TOWER G

EC-G-SD-430

EC-G-FC-442

26-Jan-14

5-Mar-14

EC-D-SD-501

EC-D-FC-501

DETAIL

Page 14

KIRIM

KEMBALI

REV.

KEMBALI

168 INSTALASI ACCESS CONTROL LANTAI LG TOWER G

KEMBALI

Dibuat oleh :

TANGGAL

KIRIM

167 INSTALASI ACCESS CONTROL LANTAI BASEMENT TOWER G

170 DETAIL RUANG KONTROL ELEKTRONIK LANTAI LG TOWER - D

PENGIRIMAN KE III

TANGGAL

General
Con
ANWAR

MONITORING SHOP DRAWING BASURA CITY

li

IM

la

li

&

IA

In

rm

(0

li

l.

ti

lp

IC

KONTRAKTOR
O

PT. SYNTHESIS KARYA PRATAMA


MANAJEMEN KONSTRUKSI

ELEKTRIKAL

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO

JUDUL DRAWING

NO. GAMBAR

REVERESI
No. FORCONST
KIRIM

PENGAJUAN KE I
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE II
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE III
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE IV
TANGGAL
KEMBALI

STS REV.

PENGAJUAN KE V
TANGGAL
KEMBALI

Dibuat oleh :

KIRIM

ELEKTRIKAL
UMUM
1

DAFTAR GAMBAR ELEKTRIKAL

EL-SD-001

EL-FC-001

SIMBOL-SIMBOL ELEKTRIKAL

EL-SD-002

EL-FC-002

EL-FC-101

General

DIAGRAM
3

BLOK DIAGRAM SISTEM DISTRIBUSI DAYA LISTRIK

EL-SD-101

SINGLE LINE DIAGRAM SISTEM DISTRIBUSI DAYA LISTRIK APARTEMEN

EL-SD-102

EL-FC-102

SINGLE LINE DIAGRAM SISTEM PUTM APARTEMENT & PKG APARTEMENT

EL-SD-102.A

EL-SD-102.A

SINGLE LINE DIAGRAM SISTEM PUTM TOWER F & PUTM TOWER G

EL-SD-102.B

EL-SD-102.B

SINGLE LINE DIAGRAM SISTEM PUTM TOWER D & PUTM TOWER E

EL-SD-102.C

EL-SD-102.C

SINGLE LINE DIAGRAM SISTEM PUTM TOWER A & PUTM TOWER C

EL-SD-102.D

EL-SD-102.D

9 SINGLE LINE DIAGRAM SISTEM CAPACITOR BANK APARTEMEN


10 SINGLE LINE DIAGRAM SISTEM DISTRIBUSI DAYA LISTRIK MALL & CONDOTEL
11 SINGLE LINE DIAGRAM SISTEM CAPACITOR BANK MALL & CONDOTEL

EL-SD-103

EL-FC-103

EL-SD-104

EL-FC-104

EL-SD-105

EL-FC-105

12 DIAGRAM PANEL SDP-A1.1 & MP-10.A1~MP-30.A1 ( TYPIKAL )

EL-SD-106

EL-FC-106

13 DIAGRAM PANEL SDP-1.A/1 & SDP-1.A/2

EL-SD-107

EL-FC-107

14 DIAGRAM PANEL SDP-2.A/1 & SDP-2.A/2

EL-SD-107.A

EL-FC-107.A

15 DIAGRAM PANEL SDP-3.A/1 & SDP-3.A/2

EL-SD-107.B

EL-FC-107.B

16 DIAGRAM PANEL PL-10.A/1 - PL-30.A/1 (TYPICAL) & PL-10.A/2 - PL-30.A/2 (TYPICAL)


17 DIAGRAM PANEL SDP-A2.1 & MP-10.A2~MP-30.A2 ( TYPIKAL )

EL-SD-107.C

EL-FC-107.C

EL-SD-108

EL-FC-108

18 DIAGRAM PANEL SDP-1.C/1 & SDP-1.C/2

EL-SD-109

EL-FC-109

19 DIAGRAM PANEL SDP-2.C/1 & SDP-2.C/2

EL-SD-109.A

EL-SD-109.A

20 DIAGRAM PANEL SDP-3.C/1 & SDP-3.C/2

EL-SD-109.B

EL-SD-109.B

21 DIAGRAM PANEL PL-10.C/1 - PL-30.C/1 (TYPICAL) & PL-10.C/2 - PL-30.C/2 (TYPICAL)


22 DIAGRAM PANEL SDP-2,3,4,5. D (TYPICAL) & PL-3.D - PL-33.D (TYPICAL)

EL-SD-109.C

EL-SD-109.C

EL-SD-110

EL-FC-110

23 DIAGRAM PANEL PL - SEKOLAH/DASAR.E


24 DIAGRAM PANEL SDP - 1.E

EL-SD-111

EL-FC-111

4-Apr-14

14-Apr-14

FAQI

EL-SD-111.A

EL-SD-111.A

4-Apr-14

14-Apr-14

FAQI

25 DIAGRAM PANEL SDP - 2,3,4,5.E (TYPICAL) & PL-5.E ~ PL - 33.E (TYPICAL)


26 DIAGRAM PANEL PL - SEKOLAH.1.E

EL-SD-111.B

EL-SD-111.B

4-Apr-14

14-Apr-14

FAQI

EL-SD-111.C

EL-SD-111.C

4-Apr-14

14-Apr-14

FAQI

27 DIAGRAM PANEL PL - SEKOLAH.2.E


28 DIAGRAM PANEL PL - SEKOLAH.3.E

EL-SD-111.D

EL-SD-111.D

4-Apr-14

14-Apr-14

FAQI

EL-SD-111.E

EL-SD-111.E

4-Apr-14

14-Apr-14

FAQI

29 DIAGRAM PANEL SDP-1.F/1 & SDP-1.F/2


30 DIAGRAM PANEL SDP-2,3,4,5.F/1 (TYPICAL) & SDP-2,3,4,5.F/2 (TYPICAL)

EL-SD-112

EL-FC-112

30-Jan-14

6-Feb-14

FAQI

EL-SD-113

EL-FC-113

30-Jan-14

6-Feb-14

FAQI

31 DIAGRAM PANEL PL-1.F/1~PL-33.F/1 (TYPICAL) & PL-1.F/2~PL-33.F/2(TYPICAL)


32 DIAGRAM PANEL SDP-1.G/1 & SDP-1.G/2

EL-SD-114

EL-FC-114

30-Jan-14

6-Feb-14

FAQI

EL-SD-115

EL-FC-115

30-Jan-14

6-Feb-14

FAQI

33 DIAGRAM PANEL SDP-G-2,3,4,5.G/1 (TYPICAL) & SDP-2,3,4,5.G/2 (TYPICAL)


34 DIAGRAM PANEL PL-1.G/1~PL-33.G/1(TYPICAL) & PL-1.G/2~PL-33.G/2(TYPICAL)

EL-SD-116

EL-FC-116

30-Jan-14

6-Feb-14

FAQI

EL-SD-117

EL-FC-117

30-Jan-14

6-Feb-14

FAQI

35 DIAGRAM PANEL SDP-ATAP TOWER A, C, F, G, & PP LIFT ( TYPIKAL )


36 DIAGRAM PANEL SDP-ATAP TOWER D, E & PP LIFT ( TYPIKAL )

EL-SD-118

EL-FC-118

12-Apr-14

21-Apr-14

FAQI

EL-SD-119

EL-FC-119

12-Apr-14

21-Apr-14

FAQI

37 DIAGRAM PANEL SDP-EMERGENCY TOWER A, C, F, G & TOWER B, D, E (TYPICAL)

EL-SD-120

EL-FC-120

30-Jan-14

6-Feb-14

FAQI

38 DIAGRAM PANEL PL-OL ( OUTDOOR LIGHTHING ) TOWER A, C, F, G & TOWER B, D, E ( TYPIKAL )


39 DIAGRAM PANEL SDP-HYDRANT

EL-SD-121

EL-FC-121

EL-SD-122

EL-FC-122

12-Apr-14

21-Apr-14

FAQI

40 DIAGRAM PANEL SDP-UTILITAS

EL-SD-123

EL-FC-123

12-Apr-14

21-Apr-14

FAQI

41 WIRING DIAGRAM MCB BOX UNIT HUNIAN & KIOS

EL-SD-124

EL-FC-124

29-Nov-13

7-Dec-13

FAQI

42 WIRING DIAGRAM MCB BOX KELAS LT. 1 ~ LT.3 (TYPICAL)

EL-SD-125

EL-FC-125

EL-SD-201

EL-FC-201

WIRING

INSTALASI
43 INSTALASI JALUR CABLE & CABLE LADDER LANTAI LG
44 INSTALASI JALUR CABLE TEGANGAN MENENGAH ,STOP KONTAK

Page 15

MONITORING SHOP DRAWING BASURA CITY

li

IM

la

li

&

IA

In

rm

(0

li

l.

ti

lp

IC

KONTRAKTOR
O

PT. SYNTHESIS KARYA PRATAMA


MANAJEMEN KONSTRUKSI

ELEKTRIKAL

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO

JUDUL DRAWING

NO. GAMBAR

REVERESI
No. FORCONST
KIRIM

EL-SD-201.A

EL-SD-201.A

EL-SD-202

EL-FC-202

EL-SD-203

EL-FC-202.A

EL-SD-204

EL-FC-202.B

48 INSTALASI PENERANGAN LANTAI BASEMENT (TOWER A, B & C)

EL-SD-205

EL-FC-203

49 INSTALASI PENERANGAN LANTAI BASEMENT (TOWER D & E)

EL-SD-206

50 INSTALASI PENERANGAN LANTAI BASEMENT (TOWER F & G)

EL-SD-207

51 INSTALASI PENERANGAN LANTAI LG (TOWER A,B & C)

EL-SD-208

EL-FC-206

52 INSTALASI PENERANGAN LANTAI LG (TOWER D & E)

EL-SD-209

EL-FC-207

53 INSTALASI PENERANGAN LANTAI LG (TOWER F & G)

EL-SD-210

EL-FC-208

54 INSTALASI PENERANGAN JALAN UMUM (PJU) SITE PLAN

EL-SD-211

EL-FC-209

55 INSTALASI PENERANGAN AREA PARKIR TOWER A, B & C LANTAI - 3

EL-SD-212

EL-FC-210

56 INSTALASI PENERANGAN AREA PARKIR TOWER A, B & C LANTAI - 5

EL-SD-213

EL-FC-211

57 INSTALASI PENERANGAN AREA PARKIR TOWER A, B & C LANTAI - 6

EL-SD-214

EL-FC-212

58 INSTALASI PENERANGAN AREA PARKIR TOWER A, B & C LANTAI - 7

EL-SD-215

EL-FC-213

59 INSTALASI PENERANGAN AREA PARKIR TOWER A, B & C LANTAI - 8

EL-SD-216

EL-FC-214

60 INSTALASI STOP KONTAK AREA PARKIR TOWER A, B & C LANTAI - 3

EL-SD-217

EL-FC-215

61 INSTALASI STOP KONTAK AREA PARKIR TOWER A, B & C LANTAI - 5

EL-SD-218

EL-FC-216

62 INSTALASI STOP KONTAK AREA PARKIR TOWER A, B & C LANTAI - 6

EL-SD-219

EL-FC-217

63 INSTALASI STOP KONTAK AREA PARKIR TOWER A, B & C LANTAI - 7

EL-SD-220

EL-FC-218

64 INSTALASI STOP KONTAK AREA PARKIR TOWER A, B & C LANTAI - 8

EL-SD-221

EL-FC-219

65 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 9 TOWER - A

EL-A-SD-301

EL-A-FC-301

66 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 10 s/d 30 TOWER - A

EL-A-SD-302

EL-A-FC-302

67 INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER.A

EL-A-SD-303

EL-A-FC-303

68 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - A

EL-A-SD-304

EL-A-FC-304

69 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - A

EL-A-SD-305

EL-A-FC-305

70 INSTALASI PENERANGAN LUAR TOWER - A

EL-A-SD-306

EL-A-FC-306

71 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 9 TOWER - C

EL-C-SD-307

EL-C-FC-307

72 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 10 s/d 30 TOWER - C

EL-C-SD-308

EL-C-FC-308

73 INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - C

EL-C-SD-309

EL-C-FC-309

74 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - C

EL-C-SD-310

EL-C-FC-310

75 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER.C

EL-C-SD-311

EL-C-FC-311

76 INSTALASI PENERANGAN LUAR TOWER - C

EL-C-SD-312

EL-C-FC-312

78 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI GF TOWER - D

EL-D-SD-313

EL-D-FC-313

79 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 TOWER - D

EL-D-SD-314

EL-D-FC-314

80 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 2 TOWER - D

EL-D-SD-315

EL-D-FC-315

81 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 3 s/d 33 (TYPIKAL) TOWER - D

EL-D-SD-316

EL-D-FC-316

82 INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - D

EL-D-SD-317

EL-D-FC-317

83 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER.D

EL-D-SD-318

EL-D-FC-318

84 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - D

EL-D-SD-319

EL-D-FC-319

85 INSTALASI PENERANGAN LUAR TOWER - D

EL-D-SD-320

EL-D-FC-320

86 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI GF TOWER - E

EL-E-SD-321

EL-E-FC-321

87 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 TOWER - E

EL-E-SD-322

EL-E-FC-322

88 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 2 TOWER - E

EL-E-SD-323

EL-E-FC-323

89 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 3 TOWER - E

EL-E-SD-324

EL-E-FC-324

90 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 5 s/d 33 (TYPIKAL) TOWER - E

EL-E-SD-325

EL-E-FC-325,326,327

DAN PANEL CONTROL LANTAI LOWER GROUND TOWER F & G

45 INSTALASI JALUR CABLE TEGANGAN MENENGAH LANTAI BASEMENT

PENGAJUAN KE I
TANGGAL
KEMBALI

STS REV.

STS REV.

KIRIM

PENGAJUAN KE III
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE IV
TANGGAL
KEMBALI

STS REV.

PENGAJUAN KE V
TANGGAL
KEMBALI

Dibuat oleh :

KIRIM

FAQI

26-Mar-14

4-Mar-14

11-Mar-14

FAQI

EL-FC-204

7-Apr-14

14-Apr-14

FAQI

EL-FC-205

13-Dec-13

19-Dec-13

FAQI

28-Jan-14

1-Feb-14

FAQI

General

47 INSTALASI JALUR CABLE TEGANGAN MENENGAH ,STOP KONTAK DAN PANEL


LANTAI BASEMENT TOWER F & G

PENGAJUAN KE II
TANGGAL
KEMBALI

21-Mar-14

46 INSTALASI JALUR CABLE TEGANGAN MENENGAH ,STOP KONTAK DAN PANEL


LANTAI BASEMENT TOWER D & E

KIRIM

Page 16

MONITORING SHOP DRAWING BASURA CITY

li

IM

la

li

&

IA

In

rm

(0

li

l.

ti

lp

IC

KONTRAKTOR
O

PT. SYNTHESIS KARYA PRATAMA


MANAJEMEN KONSTRUKSI

ELEKTRIKAL

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO

JUDUL DRAWING

NO. GAMBAR

REVERESI
No. FORCONST
KIRIM

PENGAJUAN KE I
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE II
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE III
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE IV
TANGGAL
KEMBALI

STS REV.

PENGAJUAN KE V
TANGGAL
KEMBALI

Dibuat oleh :

KIRIM

91 INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - E

EL-E-SD-326

EL-E-FC-328

92 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - E

EL-E-SD-327

EL-E-FC-329

93 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - E

EL-E-SD-328

EL-E-FC-330

94 INSTALASI PENERANGAN LUAR TOWER - E

EL-E-SD-329

EL-E-FC-331

95 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI DASAR TOWER - F


96 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 s/d 33 (TYPIKAL) TOWER - F

EL-F-SD-330

EL-F-FC-332

4-Mar-14

11-Mar-14

EL-F-SD-331

EL-F-FC-333,334,335

4-Mar-14

11-Mar-14

97 INSTALASI PENERANGAN, STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - F

EL-F-SD-332

EL-F-FC-336

98 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - F

EL-F-SD-333

EL-F-FC-337

99 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - F

EL-F-SD-334

EL-F-FC-338

100 INSTALASI PENERANGAN LUAR TOWER - F

EL-F-SD-335

EL-F-FC-339

101 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI DASAR TOWER - G

EL-G-SD-336

EL-G-FC-340

25-Feb-14

5-Mar-14

102 INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 s/d 33 (TYPIKAL) TOWER - G

EL-G-SD-337

EL-G-FC-341, 342

3-Mar-14

5-Mar-14

103 INSTALASI PENERANGAN, STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - G

EL-G-SD-338

EL-G-FC-343

104 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI-20 TOWER - G

EL-G-SD-339

EL-G-FC-344

105 INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - G

EL-G-SD-340

EL-G-FC-345

106 INSTALASI PENERANGAN LUAR TOWER - G

EL-G-SD-341

EL-G-FC-346

107 INSTALASI SISTEM PENTANAHAN TOWER - A

EL-A-SD-342

EL-A-FC-347

108 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - A

EL-A-SD-343

EL-A-SD-348

109 INSTALASI SISTEM PENTANAHAN TOWER - C

EL-C-SD-344

EL-C-FC-349

110 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - C

EL-C-SD-345

EL-C-FC-350

111 INSTALASI SISTEM PENTANAHAN TOWER - D

EL-D-SD-346

EL-D-FC-351

112 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - D

EL-D-SD-347

EL-D-FC-352

113 INSTALASI SISTEM PENTANAHAN TOWER - E

EL-E-SD-348

EL-E-FC-353

114 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - E

EL-E-SD-349

EL-E-FC-354

115 INSTALASI SISTEM PENTANAHAN TOWER - F

EL-F-SD-350

EL-F-FC-355

116 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - F

EL-F-SD-351

EL-F-FC-356

117 INSTALASI SISTEM PENTANAHAN TOWER - G

EL-G-SD-352

EL-G-FC-357

118 INSTALASI PENANGKAL PETIR TAMPAK ATAS TOWER - G

EL-G-SD-353

EL-G-FC-358

119 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - STA

EL-SD-354

EL-FC-359

120 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - 1BA

EL-SD-355

EL-FC-360

121 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - 2BA

EL-SD-356

EL-FC-361

122 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - 2BB

EL-SD-357

EL-FC-362

123 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - 2BAC

EL-SD-358

EL-FC-363

124 DETAIL FIXTURE EL & EC UNIT ROOM TYPE - 3BC

EL-SD-359

EL-FC-364

125 DETAIL RUANG GENSET LANTAI LG

EL-SD-360

EL-FC-365

126 DETAIL RUANG POWER HOUSE LANTAI 8 TOWER - A

EL-A-SD-361

EL-A-FC-366

127 DETAIL RUANG POWER HOUSE LANTAI 8 TOWER - B

EL-B-SD-362

EL-B-FC-367

128 DETAIL RUANG POWER HOUSE LANTAI 8 TOWER - C

EL-C-SD-363

EL-C-FC-368

129 DETAIL RUANG POWER HOUSE LANTAI GF TOWER - D

EL-D-SD-364

EL-D-FC-369

130 DETAIL RUANG POWER HOUSE LANTAI GF TOWER - E

EL-E-SD-365

EL-E-FC-370

131 DETAIL RUANG POWER HOUSE LANTAI GF TOWER - F

EL-F-SD-366

EL-F-FC-371

4-Apr-14

14-Apr-14

FAQI

132 DETAIL RUANG POWER HOUSE LANTAI GF TOWER - G

EL-G-SD-367

EL-G-FC-372

18-Mar-14

2-Apr-14

FAQI

133 DETAIL RUANG PANEL LANTAI 8 TOWER - A

EL-A-SD-368

EL-A-FC-373

134 DETAIL RUANG PANEL LANTAI 9 - 30 (TYPIKAL) TOWER - A

EL-A-SD-369

EL-A-FC-374

135 DETAIL RUANG PANEL LANTAI 8 TOWER - C

EL-C-SD-370

EL-C-FC-375

136 DETAIL RUANG PANEL LANTAI 9 - 30 (TYPIKAL) TOWER - C

EL-C-SD-371

EL-C-FC-376

General
FAQI
17-Mar-14

24-Mar-14

11-Mar-14

18-Mar-14

FAQI

FAQI
FAQI

DETAIL

Page 17

MONITORING SHOP DRAWING BASURA CITY

li

IM

la

li

&

IA

In

rm

(0

li

l.

ti

lp

IC

KONTRAKTOR
O

PT. SYNTHESIS KARYA PRATAMA


MANAJEMEN KONSTRUKSI

ELEKTRIKAL

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO

JUDUL DRAWING

NO. GAMBAR

REVERESI
No. FORCONST
KIRIM

PENGAJUAN KE I
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE II
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE III
TANGGAL
KEMBALI

STS REV.

KIRIM

PENGAJUAN KE IV
TANGGAL
KEMBALI

STS REV.

PENGAJUAN KE V
TANGGAL
KEMBALI

Dibuat oleh :

KIRIM

137 DETAIL RUANG PANEL LANTAI 2 - 28 (TYPIKAL) TOWER - D

EL-D-SD-372

EL-D-FC-379

138 DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - D

EL-D-SD-373

EL-D-FC-380

139 DETAIL RUANG PANEL LANTAI ATAP TOWER - D

EL-D-SD-374

EL-D-FC-381

140 DETAIL RUANG PANEL LANTAI 1 - 33 (TYPIKAL) TOWER - E

EL-E-SD-375

EL-E-FC-382

141 DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - E

EL-E-SD-376

EL-E-FC-383

142 DETAIL RUANG PANEL LANTAI ATAP TOWER - E


143 DETAIL RUANG PANEL LANTAI 1 - 33 (TYPIKAL) TOWER - F

EL-E-SD-377

EL-E-FC-384

EL-F-SD-378

EL-F-FC-385

144 DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - F

EL-F-SD-379

EL-F-FC-386

145 DETAIL RUANG PANEL LANTAI ATAP TOWER - F

EL-F-SD-380

EL-F-FC-387

146 DETAIL RUANG PANEL LANTAI 1 - 33 (TYPIKAL) TOWER - G

EL-G-SD-381

EL-G-FC-388

147 DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - G

EL-G-SD-382

EL-G-FC-389

148 DETAIL RUANG PANEL LANTAI ATAP TOWER - G

EL-G-SD-383

EL-G-FC-390

149 DETAIL INSTALASI PENERANGAN RAMP RG2 LT. LOWER GROUND

EL-SD-384

EL-FC-391

30-Jan-14

6-Feb-14

FAQI

150 DETAIL INSTALASI PENERANGAN RAMP RD1 LT. LOWER GROUND

EL-SD-385

EL-FC-392

30-Jan-14

6-Feb-14

FAQI

151 DETAIL INSTALASI PENERANGAN RAMP RD2 LT. LOWER GROUND

EL-SD-386

EL-FC-393

30-Jan-14

6-Feb-14

FAQI

General

Page 18

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

VENTILASI

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

REVERENSI
NO. FORCONST
KIRIM

PENGIRIMAN KE II
TANGGAL
KEMBALI

STS

REV.

KIRIM

PENGIRIMAN KE III
TANGGAL
KEMBALI

STS

REV.

KIRIM

PENGIRIMAN KE IV
TANGGAL
KEMBALI

STS

REV.

Dibuat oleh :

VENTILASI
UMUM
1 DAFTAR GAMBAR TATA UDARA
2 SIMBOL SINGKATAN

VAC-SD- 001
VAC-SD-002

VAC-FC-001
VAC-FC-002

3
4
5
6
7
8
9

DIAGRAM
SISTEM PRESSURISASI TANGGA KEBAKARAN TOWER A,B & C ( lembar-01 )
SISTEM PRESSURISASI TANGGA KEBAKARAN TOWER D,E,F, & G ( lembar-02 )
SISTEM EXHAUST FAN TOWER A & C
SISTEM EXHAUST FAN TOWER D,E,F & G
SISTEM TATA UDARA TOWER A,B & C ( lembar - 01 )
SISTEM TATA UDARA TOWER D , E, F & G ( lembar - 02 )
SISTEM VENTILASI UDARA BASEMENT

VAC-SD-101
VAC-SD-102
VAC-SD-103
VAC-SD-104
VAC-SD-105
VAC-SD-106
VAC-SD-107

VAC-FC-101
VAC-FC-102
VAC-FC-103
VAC-FC-104
VAC-FC-105
VAC-FC-106
VAC-FC-107

10
11
12
13
14
15
16
17

INSTALASI
INSTALASI TATA UDARA LANTAI BASEMENT TOWER A,B & C ( lembar-1 )
INSTALASI TATA UDARA LANTAI BASEMENT TOWER D,E,F & G ( lembar-2 )
INSTALASI TATA UDARA LANTAI LG TOWER D (lembar 1)
INSTALASI TATA UDARA LANTAI LG TOWER E, F, & G (lembar 2)
INSTALASI TATA UDARA LANTAI 5 AREA PARKIR TOWER A,B & C
INSTALASI TATA UDARA LANTAI 6 AREA PARKIR TOWER A,B & C
INSTALASI TATA UDARA LANTAI 7 AREA PARKIR TOWER A,B & C
INSTALASI TATA UDARA LANTAI 8 AREA PARKIR TOWER A,B & C

VAC-SD-201
VAC-SD-202
VAC-SD-203
VAC-SD-204
VAC-SD-205
VAC-SD-206
VAC-SD-207
VAC-SD-208

VAC-FC-201
VAC-FC-202
VAC-FC-203
VAC-FC-204
VAC-FC-205
VAC-FC-206
VAC-FC-207
VAC-FC-208

18 INSTALASI TATA UDARA LANTAI 9 TOWER - A


19 INSTALASI TATA UDARA LANTAI 10 S/D 30 ( TYPIKAL ) TOWER -A
20 INSTALASI TATA UDARA LANTAI ATAP TOWER - A

VAC-A-SD-301
VAC-A-SD-302
VAC-A-SD-303

VAC-A-FC-301
VAC-A-FC-302
VAC-A-FC-303

21 INSTALASI TATA UDARA LANTAI 9 TOWER - C


22 INSTALASI TATA UDARA LANTAI 10 S/D 30 ( TYPIKAL ) TOWER - C
23 INSTALASI TATA UDARA LANTAI ATAP TOWER - C

VAC-C-SD-304
VAC-C-SD-305
VAC-C-SD-306

VAC-C-FC-304
VAC-C-FC-305
VAC-C-FC-306

24
25
26
27
28

INSTALASI TATA UDARA LANTAI DASAR TOWER - D


INSTALASI TATA UDARA LANTAI 1 TOWER - D
INSTALASI TATA UDARA LANTAI 2 TOWER - D
INSTALASI TATA UDARA LANTAI 3 S/D 33 ( TYPIKAL ) TOWER - D
INSTALASI TATA UDARA LANTAI ATAP TOWER - D

VAC-D-SD-307
VAC-D-SD-308
VAC-D-SD-309
VAC-D-SD-310
VAC-D-SD-311

VAC-D-FC-307
VAC-D-FC-308
VAC-D-FC-309
VAC-D-FC-310
VAC-D-FC-311

29
30
31
32

INSTALASI TATA UDARA LANTAI DASAR TOWER - E


INSTALASI TATA UDARA LANTAI 1 TOWER - E
INSTALASI TATA UDARA LANTAI 2 TOWER - E
INSTALASI TATA UDARA LANTAI 3 TOWER - E

VAC-E-SD-312
VAC-E-SD-313
VAC-E-SD-314
VAC-E-SD-315

VAC-E-FC-312
VAC-E-FC-313
VAC-E-FC-314
VAC-E-FC-315
VAC-E-FC316,317,318

33 INSTALASI TATA UDARA LANTAI 5 s/d 33 TOWER - E

VAC-E-SD-316

34 INSTALASI TATA UDARA LANTAI ATAP TOWER - E

VAC-E-SD-317

General Con

28-Dec-13
28-Dec-13

11-Jan-14
11-Jan-14

C
A

0
0

ADI
ADI

7-Apr-14
7-Apr-14

14-Apr-14
14-Apr-14

A
A

0
0

MEIKA
MEIKA

12-Apr-14
17-Mar-14
17-Mar-14
17-Mar-14

21-Apr-14
24-Mar-14
24-Mar-14
24-Mar-14

A
A
A
A

0
0
0
0

MEIKA
MEIKA
MEIKA
MEIKA

17-Mar-14

24-Mar-14

MEIKA

Page 19

MONITORING SHOP DRAWING BASURA CITY

PT. SYNTHESIS KARYA PRATAMA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

VENTILASI

Jl. BASUKI RACHMAT No. 1A


Jakarta Timur 13410

NO.

JUDUL DRAWING

NO. GAMBAR

REVERENSI
NO. FORCONST
KIRIM

PENGIRIMAN KE II
TANGGAL
KEMBALI

STS

REV.

29-Mar-14

7-Apr-14

23-Dec-13

4-Jan-14

VAC-F-SD-320

VAC-F-FC-320
VAC-F-FC321,322,323
VAC-F-FC-324

VAC-G-SD-321
VAC-G-SD-322
VAC-G-SD-323

VAC-G-FC-325
VAC-G-FC-326,327
VAC-G-FC-328

29-Mar-14
23-Dec-13

7-Apr-14
4-Jan-14

A
A

0
0

35 INSTALASI TATA UDARA LANTAI DASAR TOWER - F

VAC-F-SD-318

36 INSTALASI TATA UDARA LANTAI 1 s/d 33 TOWER - F

VAC-F-SD-319

37 INSTALASI TATA UDARA LANTAI ATAP TOWER - F


38 INSTALASI TATA UDARA LANTAI DASAR TOWER - G
39 INSTALASI TATA UDARA LANTAI 1 s/d 33 TOWER - G
40 INSTALASI TATA UDARA LANTAI ATAP TOWER - G

Page 20

KIRIM

PENGIRIMAN KE III
TANGGAL
KEMBALI

STS

REV.

KIRIM

PENGIRIMAN KE IV
TANGGAL
KEMBALI

STS

REV.

Dibuat oleh :
MEIKA

ADI
General
Con

MEIKA
ADI

F-PSA-K-04

PT. SYNTHESIS KARYA PRATAMA

MONITORING KOORDINASI BASURA

KONTRAKTOR

MANAJEMEN KONSTRUKSI

KOORDINASI

JL. BASUKI RACHMAT No. 1A

General Contractor & Supplier

JAKARTA TIMUR 13410


PENGIRIMAN KE I

NO.

1
2
3
3
4
5
6
7
8
9

JUDUL DRAWING

KOORDINASI
UMUM
GAMBAR KOORDINASI M/E LANTAI BASEMENT TOWER A, B & C (Lembar 1)
GAMBAR KOORDINASI M/E LANTAI BASEMENT TOWER D & E, (Lembar 2)
GAMBAR KOORDINASI M/E LANTAI BASEMENT TOWER F & G (Lembar 3)
GAMBAR KOORDINASI M/E LANTAI LG TOWER A, B & C (Lembar 1)
GAMBAR KOORDINASI M/E LANTAI LG TOWER D & E, (Lembar 2)
GAMBAR KOORDINASI M/E LANTAI LG TOWER F & G (Lembar 3)
GAMBAR KOORDINASI M/E LANTAI DASAR TOWER G
GAMBAR KOORDINASI M/E LANTAI 1 s/d 33 (TYPICAL) TOWER G
GAMBAR KOORDINASI M/E LANTAI DASAR TOWER F
GAMBAR KOORDINASI M/E LANTAI 1 s/d 33 (TYPICAL) TOWER F

NO. GAMBAR

ME-COORD-001
ME-COORD-002
ME-COORD-003
ME-COORD-004
ME-COORD-005
ME-COORD-006
ME-COORD-007
ME-COORD-008
ME-COORD-009
ME-COORD-010

TANGGAL

PENGIRIMAN KE II

STS REV.

KIRIM

KEMBALI

19-Feb-14
28-Dec-13

3-Mar-14
15-Jan-14

B
B

0
0

12-Feb-14
30-Jan-14

21-Feb-14
21-Feb-14

28-Dec-13
11-Mar-14
10-Apr-14
4-Apr-14

15-Jan-14

B
B
C

18-Mar-14

14-Apr-14
14-Apr-14

0
0
0
0
0
0

TANGGAL
KIRIM

28-Jan-14

PENGIRIMAN KE III

STS REV.

KEMBALI

1-Feb-14

TANGGAL
KIRIM

19-Feb-14

PENGIRIMAN KE IV

3-Mar-14

TANGGAL

STS REV.

KEMBALI

KIRIM

14-Mar-14

DI BUAT OLEH :

STS REV.

KEMBALI

18-Mar-14

TOTAL

TAMRIN
TAMRIN

2
2

lbr
lbr

TAMRIN
ADI
FAQI
ADI
FAQI

2
8
2
2
2

lbr
lbr
lbr
lbr
lbr

20

lbr

Jakarta, 21 April 2014

Mengetahui,
PT. SAKATA UTAMA

Mengetahui,
PT. METAKOM PRANATA

Di buat oleh :
PT. SAKATA UTAMA

SUSILO UTOMO

DARMANTO

DEYNA. R

Project Manager

Konsultan Engineering

Engineer

Prepared by User 12/11/2014

Page 21

TANGGAL

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN MARET )

GAMBAR

SCHEDULE

VAC-SD-102

10-Mar-14

NO

STATUS

KETERANGAN

KIRIM (SKP)

VENTILASI
1

SISTEM PRESSURISASI TANGGA KEBAKARAN TOWER D, E, F & G ( lembar-02 )

SD

TANGGAL

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN APRIL )

GAMBAR

SCHEDULE

INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI GF TOWER - E


INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - E
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 2 TOWER - E
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 3 TOWER - E
DIAGRAM SYSTEM STP TOWER D ( KAP 350 M3/HARI )
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI GF TOWER - D
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 1 TOWER - D
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 15 ( TYPIKAL )TOWER D
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 16 S/D 33 ( TYPIKAL )TOWER D
INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - D
INSTALASI PEMIPAAN AIR BERSIH KE RUANG POMPA LANTAI LOWER GROUND
INSTALASI STP TOWER D ( KAP 350 M3/HARI )
INSTALASI STP TOWER F ( KAP 750 M3/HARI )
INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - E
INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - F
INSTALASI PLUMBING AH & ROOF DRAIN LANTAI ATAP TOWER - G

PL-E-FC-318
PL-E-FC-319
PL-E-FC-320
PL-E-FC-321
PL - FC - 108
PL-D-FC-311
PL-D-FC-312
PL-D-FC-315
PL-D-FC-316
PL-D-FC-317
PL - SD - 204
PL - FC - 218
PL - FC - 219
PL-E-FC-325
PL-F-FC-332
PL-G-FC-338

DETAIL PRINSIP POTONGAN PIPA AIR HUJAN SISI DALAM & SISI LUAR JALAN ( TOWER A,C,D,F & G )
DETAIL PRINSIP POTONGAN PIPA AIR HUJAN SISI DALAM & SISI LUAR JALAN ( TOWER E )
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 7 S/D 8 ( TYPIKAL ) TOWER - E
INSTALASI PLUMBING AK, ABK, KD, AH & VENT LANTAI 9 S/D 33 ( TYPIKAL ) TOWER - E
DIAGRAM SYSTEM STP TOWER F ( KAP 750 M3/HARI )
INSTALASI AIR BERSIH ROOF TANK TOWER - G
INSTALASI AIR BERSIH ROOF TANK TOWER - F

PL-SD-705
PL-SD-705.A
PL-E-SD-323
PL-E-SD-324
PL-SD-110
PL-G-FC-390
PL-F-FC-381

1-Apr-14
1-Apr-14
1-Apr-14
1-Apr-14
7-Apr-14
8-Apr-14
8-Apr-14
8-Apr-14
8-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14
15-Apr-14
15-Apr-14
21-Apr-14
21-Apr-14
28-Apr-14
28-Apr-14

STATUS

NO

KETERANGAN

KIRIM (SKP)

PLUMBING
1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

INSTALASI TITIK SUMPIT LANTAI BASEMENT

PL-SD-710

12-Apr-14
12-Apr-14

FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
SD
FC
FC
FC
FC
FC
SD
SD
SD
SD
SD
FC
FC
SD

Sudah kirim ke SKP


Sudah kirim ke SKP

TANGGAL

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN APRIL )

GAMBAR

SCHEDULE

PK-D-SD-310
PK-D-SD-311
PK-E-SD-315
PK-D-SD-309
PK-G-FC-334
PK-F-FC-329
PK-E-FC-323

8-Apr-14
8-Apr-14
10-Apr-14
21-Apr-14
11-Apr-14
17-Apr-14
25-Apr-14

SD
SD
SD
SD
FC
FC
FC

VAC-SD-203
VAC-SD-204
VAC-F-FC-324
VAC-G-SD-323
VAC-FC-104
VAC-D-FC-308
VAC-E-FC-319

7-Apr-14
7-Apr-14
12-Apr-14
14-Apr-14
24-Apr-14
28-Apr-14
29-Apr-14

SD
SD
FC
SD
FC
FC
FC

EC-D-SD-354
EC-D-SD-335
EC-E-SD-420
EC-G-SD-374
EC-D-SD-310
EC-D-SD-311
EC-SD-112
EC-SD-113
EC-F-SD-373
EC-D-FC-501

3-Apr-14
7-Apr-14
7-Apr-14
10-Apr-14
12-Apr-14
12-Apr-14
15-Apr-14
15-Apr-14
17-Apr-14
21-Apr-14

SD
SD
SD
SD
SD
SD
SD
SD
SD
FC

EL-FC-102.A
EL-FC-102.B
EL-SD-201
EL-SD-202

7-Apr-14
7-Apr-14
10-Apr-14
10-Apr-14

EL-SD-203
EL-SD-206
EL-SD-209
EL-SD-119
EL-SD-122
EL-SD-123

10-Apr-14
10-Apr-14
10-Apr-14
14-Apr-14
14-Apr-14
14-Apr-14

STATUS

NO

KETERANGAN

KIRIM (SKP)

PEMADAM KEBAKARAN
1
2
3
4
5
6
7

INSTALASI PEMADAM KEBAKARAN LANTAI 1 TOWER - D


INSTALASI PEMADAM KEBAKARAN LANTAI 2 TOWER - D
INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - E
INSTALASI PEMADAM KEBAKARAN LANTAI DASAR TOWER - D
INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - G
INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - F
INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER -E

1
2
3
4
5
6
7

INSTALASI TATA UDARA LANTAI LG TOWER D (lembar 1)


INSTALASI TATA UDARA LANTAI LG TOWER E, F, & G (lembar 2)
INSTALASI TATA UDARA LANTAI ATAP TOWER - F
INSTALASI TATA UDARA LANTAI ATAP TOWER - G
SISTEM EXHAUST FAN TOWER D,E,F & G
INSTALASI TATA UDARA LANTAI 1 TOWER - D
INSTALASI TATA UDARA LANTAI ATAP TOWER - E

1
2
3
4
5
6
7
8
9
10

INSTALASI TELEPHONE LANTAI GF TOWER - D


INSTALASI TATA SUARA LANTAI GF TOWER.D
INSTALASI ACCESS CONTROL LANTAI GF TOWER E
INSTALASI MATV LANTAI 1 s/d 33 (TYPIKAL) TOWER - G
INSTALASI FIRE ALARM LANTAI 1 TOWER - D
INSTALASI FIRE ALARM LANTAI 2 TOWER - D
DIAGRAM SISTEM MATV TOWER-D & E
DIAGRAM SISTEM MATV TOWER-F & G
INSTALASI MATV LANTAI 1 s/d 33 (TYPIKAL) TOWER - F
DETAIL RUANG KONTROL ELEKTRONIK LANTAI LG TOWER - D

VENTILASI

ELEKTRONIK

ELEKTRIKAL
1
2
3
4
5

SINGLE LINE DIAGRAM SISTEM PUTM APARTEMENT & PKG APARTEMENT


SINGLE LINE DIAGRAM SISTEM PUTM TOWER F & PUTM TOWER G
INSTALASI JALUR CABLE & CABLE LADDER LANTAI LG
INSTALASI JALUR CABLE TEGANGAN MENENGAH LANTAI BASEMENT
INSTALASI JALUR CABLE TEGANGAN MENENGAH ,STOP KONTAK DAN PANEL
LANTAI BASEMENT TOWER D & E
6 INSTALASI PENERANGAN LANTAI BASEMENT (TOWER D & E)
7 INSTALASI PENERANGAN LANTAI LG (TOWER D & E)
8 DIAGRAM PANEL SDP-ATAP TOWER D, E & PP LIFT ( TYPIKAL )
9 DIAGRAM PANEL SDP-HYDRANT
10 DIAGRAM PANEL SDP-UTILITAS

12-Apr-14
12-Apr-14

FC
FC
SD
SD
SD
SD
SD
SD
SD
SD

Sudah kirim ke SKP


Sudah kirim ke SKP

TANGGAL

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN APRIL )

GAMBAR

SCHEDULE

EL-D-FC-379
EL-D-FC-380
EL-D-FC-381
EL-E-FC-382
EL-E-FC-383
EL-E-FC-384
EL-F-FC-385
EL-F-FC-386
EL-F-FC-387
EL-G-FC-390
EL-E-FC-370
EL-D-FC-369
EL-G-SD-381
EL-G-SD-382

15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
15-Apr-14
21-Apr-14
29-Apr-14
29-Apr-14
29-Apr-14

STATUS

NO

11
12
13
14
15
16
17
18
19
20
21
22
23
24

DETAIL RUANG PANEL LANTAI 2 - 28 (TYPIKAL) TOWER - D


DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - D
DETAIL RUANG PANEL LANTAI ATAP TOWER - D
DETAIL RUANG PANEL LANTAI 2 - 33 (TYPIKAL) TOWER - E
DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - E
DETAIL RUANG PANEL LANTAI ATAP TOWER - E
DETAIL RUANG PANEL LANTAI 1 - 33 (TYPIKAL) TOWER - F
DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - F
DETAIL RUANG PANEL LANTAI ATAP TOWER - F
DETAIL RUANG PANEL LANTAI ATAP TOWER - G
DETAIL RUANG POWER HOUSE LANTAI GF TOWER - E
DETAIL RUANG POWER HOUSE LANTAI GF TOWER - D
DETAIL RUANG PANEL LANTAI 2 - 33 (TYPIKAL) TOWER - G
DETAIL RUANG PANEL LANTAI GF, 7, 15, 21 & 28 TOWER - G

12-Apr-14
12-Apr-14

FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
SD
SD

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN MEI )

GAMBAR

SCHEDULE

PL-E-FC-371
PL-D-FC-359.A

5-May-14
12-May-14

FC
FC

PK-D-FC-314

2-May-14

FC

VAC-D-FC-311

21-May-14

FC

EL-G-FC-343
EL-G-FC-344
EL-G-FC-345
EL-G-FC-346
EL-F-FC-336
EL-F-FC-337
EL-F-FC-338

5-May-14
5-May-14
5-May-14
5-May-14
12-May-14
12-May-14
12-May-14

FC
FC
FC
FC
FC
FC
FC

STATUS
KIRIM (SKP)

PLUMBING
INSTALASI AIR BERSIH ROOF TANK TOWER - E
INSTALASI AIR BERSIH ROOF TANK TOWER - D

INSTALASI PEMADAM KEBAKARAN LANTAI ATAP TOWER - D

INSTALASI TATA UDARA LANTAI ATAP TOWER - D

1
2
3
4
5
6
7

INSTALASI PENERANGAN, STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - G
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI-22 TOWER - G
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - G
INSTALASI PENERANGAN LUAR TOWER - G
INSTALASI PENERANGAN, STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - F
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - F
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - F

Sudah kirim ke SKP


Sudah kirim ke SKP

TANGGAL

NO

1
2

KETERANGAN

KIRIM (SKP)

PEMADAM KEBAKARAN

VENTILASI

ELEKTRIKAL

KETERANGAN

TANGGAL

SCHEDULE DRAWING FOR CONT & SHOP DRAWING

NO

( BULAN APRIL )

GAMBAR

SCHEDULE

EL-F-FC-339
EL-E-FC-328
EL-E-FC-329
EL-E-FC-330
EL-E-FC-331
EL-E-SD-321
EL-E-SD-322
EL-E-SD-323
EL-E-SD-324
EL-E-SD-325
EL-D-FC-313
EL-D-FC-314
EL-D-FC-317
EL-D-FC-318
EL-D-FC-319
EL-D-FC-320

12-May-14
17-May-14
17-May-14
17-May-14
17-May-14
24-May-14
24-May-14
24-May-14
24-May-14
24-May-14
25-May-14
25-May-14
30-May-14
30-May-14
30-May-14
30-May-14

FC
FC
FC
FC
FC
SD
SD
SD
SD
SD
FC
FC
FC
FC
FC
FC

EC-D-FC-314
EC-E-FC-322
EC-F-FC-328
EC-G-FC-333
EC-E-FC-375
EC-E-FC-376
EC-E-FC-377
EC-E-FC-378
EC-E-FC-379
EC-D-FC-343
EC-E-FC-351
EC-F-FC-356
EC-G-FC-360
EC-D-FC-371
EC-D-FC-372
EC-D-FC-373

5-May-14
5-May-14
5-May-14
5-May-14
5-May-14
5-May-14
5-May-14
5-May-14
5-May-14
10-May-14
10-May-14
10-May-14
10-May-14
12-May-14
12-May-14
12-May-14

FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC

STATUS

NO

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

INSTALASI PENERANGAN LUAR TOWER - F


INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - E
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER - E
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - E
INSTALASI PENERANGAN LUAR TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI GF TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 2 TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 3 TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 5 s/d 33 (TYPIKAL) TOWER - E
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI GF TOWER - D
INSTALASI PENERANGAN DAN STOP KONTAK LANTAI 1 TOWER - D
INSTALASI PENERANGAN,STOP KONTAK & JALUR KABEL LANTAI ATAP TOWER - D
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI 22 TOWER.D
INSTALASI LAMPU OBSTRUCTION LIGHT LANTAI ATAP TOWER - D
INSTALASI PENERANGAN LUAR TOWER - D

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

INSTALASI FIRE ALARM LANTAI ATAP TOWER - D


INSTALASI FIRE ALARM LANTAI ATAP TOWER.E
INSTALASI FIRE ALARM LANTAI ATAP TOWER.F
INSTALASI FIRE ALARM LANTAI ATAP TOWER.G
INSTALASI MATV LANTAI 1 TOWER - E
INSTALASI MATV LANTAI 2 TOWER - E
INSTALASI MATV LANTAI 3 TOWER - E
INSTALASI MATV LANTAI 5 TOWER - E
INSTALASI MATV LANTAI 6 TOWER - E
INSTALASI TATA SUARA LANTAI ATAP TOWER.D
INSTALASI TATA SUARA LANTAI ATAP TOWER - E
INSTALASI TATA SUARA LANTAI ATAP TOWER - F
INSTALASI TATA SUARA LANTAI ATAP TOWER - G
INSTALASI MATV LANTAI GF TOWER -D
INSTALASI MATV LANTAI 1 TOWER - D
INSTALASI MATV LANTAI 2 TOWER - D

KIRIM (SKP)

ELEKTRIKAL

KETERANGAN

MONITORING SHOP DRAWING BASURA CITY

ELEKTRONIK
NO.

JUDUL DRAWING

1
2
3
4

DIAGRAM SISTEM TATA SUARA TOWER-A,C,D,E,F & G


DETAIL PEMASANGAN HORN SPEAKER LANTAI BASEMENT
INSTALASI FIRE ALARM LANTAI GF TOWER.F
INSTALASI FIRE ALARM LANTAI-1 s/d 12 (TYPIKAL) TOWER.F

INSTALASI FIRE ALARM LANTAI BASEMENT TOWER D & E

NO. GAMBAR

STATUS

REVISI

EC-SD-105
EC-SD-217
EC-F-SD-321
EC-F-SD-322

B
B
B
B

0
0
0
0

EC-SD-202

KETERANGAN

MONITORING SHOP DRAWING BASURA CITY

ELEKTRIKAL
NO.

1
2
3

JUDUL DRAWING

DIAGRAM PANEL SDP - 2,3,4,5.E (TYPICAL) & PL-5.E ~ PL - 33.E (TYPICAL)


INSTALASI JALUR CABLE TEGANGAN MENENGAH ,STOP KONTAK
DAN PANEL CONTROL LANTAI LOWER GROUND TOWER F & G
DETAIL RUANG POWER HOUSE LANTAI GF TOWER - G

NO. GAMBAR

STATUS

REVISI

EL-SD-111.B

EL-SD-201.A
EL-G-SD-367

B
B

0
0

KETERANGAN

MONITORING GAMBAR KOORDINASI BASURA CITY

KOORDINASI
NO.

1
2
3
4

JUDUL DRAWING

GAMBAR KOORDINASI M/E LANTAI BASEMENT TOWER D & E, (Lembar 2)


GAMBAR KOORDINASI M/E LANTAI BASEMENT TOWER F & G (Lembar 3)
GAMBAR KOORDINASI M/E LANTAI LG TOWER D & E, (Lembar 2)
GAMBAR KOORDINASI M/E LANTAI LG TOWER F & G (Lembar 3)

NO. GAMBAR

STATUS

REVISI

ME-COORD-002
ME-COORD-003
ME-COORD-005
ME-COORD-006

B
B
B
B

0
0
0
0

KETERANGAN

You might also like