REKAP VOLUME BETON

paket pekerjaan Upper structure


NO
1

LANTAI

Mutu Beton

VOLUME
BQ

Upper street Level


plat lantai
kolom
balok

K-350
K-450
K-350

753
311
1001

Main Level
plat lantai
kolom
balok

K-350
K-450
K-350

694
298
569

Lower Ground
plat lantai
kolom
balok

K-350
K-450
K-350

759
250
629

Upper Ground
plat lantai
kolom
balok

K-350
K-450
K-350

759
272
632

1st
plat lantai
kolom
balok

K-350
K-450
K-350

757
244
632

2nd
plat lantai
kolom
balok

K-350
K-450
K-350

745
231
622

3rd
plat lantai

K-350

745

kolom
balok

K-450
K-350

216
621

3A-rd
plat lantai
kolom
balok

K-350
K-450
K-350

744
212
617

Lantai 5
plat lantai
kolom
balok

K-350
K-450
K-350

731
255
758

K-350
K-450
K-350

300
53
229

Mutu beton

BQ

10 Lantai atap
plat lantai
kolom
balok

Rekap Total
-

Plat lantai

K-350

6987

Kolom dan shearwall

K-450

2342

Balok

K-350

6310

Mutu beton

BQ

K-350

13297

K-450

2342

VOLUME BETON

jaan Upper structure


VOLUME
sat

gambar

sat

m
m
m

670.05
251.79
950

m
m
m

m
m
m

619.7
250.79
489

m
m
m

m
m
m

662.9
233.38
550

m
m
m

m
m
m

661.7
255.5
550

m
m
m

m
m
m

669.7
235.79
550

m
m
m

m
m
m

651.23
226.01
550

m
m
m

651.11

Keterangan

m
m

207.36
550

m
m

m
m
m

650.15
202.92
550

m
m
m

m
m
m

640.5
246.41
690

m
m
m

m
m
m

240.7
56.46
170

m
m
m

Gambar + waste 5%

selisih

6424

563

2275

67

5879

431

Gambar + waste 5%

selisih

12303

994

2275

67

PRODUK
Pekerjaan

Core lift 1 dan 2

vol (m)

13.68

Pioner K-450
Total
Har sat/m
845,000

11,559,600

1 zak=40 kg
1 zak = 0.0192

MU-800
kebutuhan (zak)

Har sat

Total

1 Zak = 50 kg

713

107,000

76,237,500

1 ZAK = 0.024 m

selisih

64,677,900

Drymix Beton K-500


kebutuhan (zak) Har sat
570

70,000

selisih

Total

1 Zak = 25 kg

39,900,000

1 ZAK = 0.012 m

28,340,400

Sikacrete-08 SCC
kebutuhan (zak) Har sat
1140

50,000

selisih

Total
57,000,000

45,440,400

RAP
Material MasterEmaco S 322 M ex BASF
1 m
waste 4%
0.04 m
Upah
1 m
Bekesting (termasuk treatment
5.04 m
kebocoran sisi bawah)

PENGAJUAN
12,000,000.00
12,000,000.00
8,800,000.0
236,000.0

12,000,000
480,000
8,800,000
1,189,440

Total

22,469,440
per m

selisih

8,306,880

Material MasterEmaco S 322 M ex BASF


waste 4%
Upah manual
Alat bantu cor
Bekesting (termasuk treatment
kebocoran sisi bawah)

1
0.04
1
1
5.04

m
m
m
ls
m

25,200,000.00
25,200,000.00
375,000.0
625,000.0
708,000.0

25,200,000
1,008,000
375,000
625,000
3,568,320

total

30,776,320
per m