JHA For Lamp Installation Around Palleting Workshop
JHA For Lamp Installation Around Palleting Workshop
Hazards Identification
Risk Assessment
Consequence
FREQ1
POO1
SOC1
Risk
Value
(Score)
EXISTING CONTROL
MEASURES
Risk
Group2
RECOMMENDED
CONTROL MEASURES
line alignment
trip by line
worker injured
tool-box meeting,
excavation
fall
worker injured
method satatement
fall
worker injured
use sling to fix road lamp column. one spotter assign to conduct\
barricade with warning tape while
installing.
laying cable
trip
worker injured
method statement.
backfilling
fall
worker injured
housekeeping
trip/sharp object
worker injured
PPE
Note:
FREQ1 : Frequency, POO1 : Probability Of Occurrence, SOC1 : Severity Of Consequence. (To calculate risk value - refer E&OP 002).
Rev:04
Prepared by:
Initial
Risk Group2
Name
Date
Approved by:
Initial
Name
Date
zhouhao
11/20/2014