ANALYSIS OF RATES

Providing & laying cement concrete work 1:6:12 (1 cement: 6sand:12 graded stone agg. 40
mm nominal size) and curing complete excluding cost of form work in
foundation and plinth.
Sr. No.

Description
Material
40 mm stone agg.
20 mm stone agg.

Qty

Rate

Unit

Amount

0.65
0.24

300
350

Cum
Cum

195.00
84.00

Sand
Cement

0.47
0.11

110
3500

Cum
Tonne
TOTAL

51.70
385.00
715.70

1 Km by Mech. Transport
100 Mtrs by Head Load

0.65
0.65

106.04
74.31

Carriage of Sand & Stone Agg.


20 mm Size
1 Km by Mech. Transport
100 Mtrs by Head Load

0.71
0.71

97.98
68.74

Cum
Cum

69.57
48.81

Carriage of Cement
1 Km by Mech. Transport
100 Mtrs by Head Load

0.11
0.11

65.32
33.77

Tonne
Tonne
TOTAL

7.19
3.71
246.50

Labour
Beldar
Bhisti
Mason 1st Class
Mason 2nd Class
Beldar for extra romming
Mate
Sunderies

2.09
0.27
0.05
0.05
0.25
0.04
LS

128.33
128.33
205.33
163.33
128.33
128.33

Each
Each
Each
Each
Each
Each

TOTAL

268.21
34.65
10.27
8.17
32.08
5.13
10.00
368.51
1330.71
19.96
1350.67

TOTAL

165.63
1516.29

Carriage of Stone Agg. 40 mm Size


68.93
48.30

TOTAL
G.T.
Add 1.5% for water charges
Add 10% CP & 5% OH charges
Except on Carriage Rs.= 1104.17
Or Say Rs. 1516.30 per Cum