@ GE Zenith Controls cnn
FACTORY TEST REPORT SUMMARY
‘Customer: MANUFACTURAS ELECTR!
Mode! Number: 2101381 CD39XISKXXX ‘Serial Number: 1670905-1-2
Controls Functions as Specified per Order: x
Options Tested and Verited per Order: x
Voltage, Poles, and Amperage Verified per Order: x.
‘Switch Transfer Functions Verified at Low, High, and Nominal Voltages: x
Bypass Interlock System Tested and Verified WA
x
x
x
Lights and Proper Operaion Veriied
‘Auxiliary Switch Operation Verified
Dielectric integrity Verified
‘Mechanical Inspection
Bypass Mechanical Inspection Verified! NA
[ATS Operation in Auto / Test Isolate positions Verified NIA.
Fasteners Torqued and Marked: x
Wire Routings and Securty Verifies x
Covers installed and Secured: x,
Cabinet Type, Operation, and Cleanliness Verified: x
x,
x,
x
Labels installed and Prorerly Located:
‘Schematics and Manuals included:
180 9001 Procedures and Documents Signed and Verified:
Acknatdgeran of hal espocton and Orato f Ya ed wi FnalTet Report:
QAID# 20426 aw
‘Quality Assurance Representative:
Final tests completed by: 20426 Date: 10/08/2013, |
cePnopmierany UNCONTROLLED WE PRINTED OR TRANSMITTED ELECTRONCALLY@ GE Zenith Controls
FACTORY TEST REPORT SUMMARY
‘Customer: MANUFACTURAS ELECTR
Z100351CD39XISXXXX Serial Number:1687657-1-1
’$18020033-390801X
Controls Functions as Srecified per Order
Options Tested and Verited per Order:
Voltage, Poles, and Amperage Verified per Order:
‘Switch Transfer Functions Verified at Low, High, and Nominal Vottages:
Bypass Interlock System Tested and Verified:
Lights and Proper Operation Verified
Auxiliary Switch Operation Veriied:
Dielectric Integnty Verifies
ne
|
Mechanical Inspection
‘Bypass Mechanical Inspection Verified: tk
[ATS Operation in Auto / Test / Isolate positions Verified: NIA.
Fasteners Torqued and Marked
Wire Routings and Securty Verifee:
Covers Installed and Secured:
Cabinet Type, Operation, and Cleanliness Verifed:
Labels Installed and Properly Located
‘Schematics and Manuals Included:
180 9001 Procedures and Documents Signed and Verified:
b|
BI
be pez
x elle
Acknowledgement of hal Inepacton and Operation ef ilLisod par Final Test Repo
ne
gate 20428 | (~~
‘Quality Assurance Representative: —__
Final tests completed by: 20426 Date: 10/09/2013 i
‘oe Propmerany UOONTROLLED MEN PRIVTED OR TRANSMITED ELECTRONICALLY