BINH SON REFINERING & PETROCHEMICAL LIMITED COMPANY
HEAT EXCHANGER CLEANING CENTER PROJECT
REQUEST FOR INSPECTION
PHIEU YEU CAU KIEM TRA TONG THE
Cost code | Activity [Package
SYSTEM NO: HEAT EXCHANGER CLEANING CENTER RFI
BsR | 1101
INSPECTION DATE / LOCATION Date___ 9/6/2011 Time: BH30 Unit: 122
Precise Location: Heat exchanger cleaning center- Unit 122
Time Received 1S 307g ay Teer
CONTRACTOR [OWNER(ESR)
REVIEW SURV WITNESS. _HOLD han vik lk
BSR/Client L Name: (Hera bar Gd ame:
Contractor Signature {4 |Signature
tem No DESCRIPTION OF INSPECTION / TEST ACTIVITIES
}. Kiém tra hang muc: Phin xay dung & két cu thep
2. Kiém tra hang mye: xay lép duéng éng: (LP steam, fre water, oily water)
3, Kim tra hang myc: xy Ip hé théng dien (lighting system, power system)
REMARKS
ACKNOWLEDGEMENT (See remarks if any) RESULTS.
CONTRACTOR OWNER(BSR) Acceptable
Name: Phan van Can Name: Nguyén Quéc V7
Acceptable with
Yelm, comments.
Signature: Li = Signature:
Not acceptable (see
Date: B-Jun-11 Date: B-Jun-11 FIR, NCR or CRF)
Page 1 of 1