Bes enenering Construction
Document Subject
Doe. No. 7795-P-7110N8-VPO017
Rev.No.: A
Date: 28.MAR.2011
Page: 1/3
PROPYLENE PLANT PROJECT
BARA conporarion
___ ISSUED
Mar.28,2011 | MOTOR TERMINAL BOX DRAWING
Global Sourcing Dept.
FOR APPROVAL
OWNER's Project No. :
CONTRACTOR's Project No. :
Project Title
Location
OWNER
Vendor
9 _& Construction Corp.|
VED With COMMENTS.
DOW TO AMEN AND. SUBMIT
‘CAP-04-10-07-088-141000
7795
Propylene Plant Project
Rayong in Thailand
IRPC Public Company Limited
EBARA CORPORATION
28.Mar. 2011
100577105 150X100VPCS5M
For ApprovalY-KYTKENTA
D-KYTKENTA,
D-connection
LIETINALUSTA . able Be
ui Or 1. Terminal baa shall be sucte!
7 —— fonnecding cable, XLPE/AVC, 3C MBAMM
PECiggmm >, Opsabmm -
2. Preliminary Metric Hub Stae >
tox len Cfo be firoled pier J
Dimension Print _ | M3KP 200250 362*500720-40
teKe 20020
Seino | Terminal Box 14
=O
rs eatical Machines, LV Motors | wanaty a Salakea rane
owe 01.08.2001 mesty LJ feet
Taso Foe Ab
ABB Oy ABB[imaggorrnmecwes [sczrszrt001 |
Note:
\When the moins supply ie connected to the stator terminals marked U, V and W, of three phase |
‘motor, and the main phase sequence is L1, L2, 13 oF RS, T, the motor wil rotate clockwise, as
‘Viewed fom the Dend. The drection of rotation can be reversed by interchanging any two of fe
{twee conductors comnacted tothe sate Sten or motor.
Please see connection type, Y (Star) or D (Delta) on motor data sheet
Connection Diagram
sazFa211004 €
Omron 3: PHASE SQUIRREL-CAGE MOTOR
®
une Electrical Machines, LV Motors | tmaoy
ouw ___30,03,2004 popes
MPrsi Reve
Jar Rate apa by
ABB Oy