You are on page 1of 54

Transmission

Prepared by : Khalil Ali Qasem

Connectivity Type
There are three types of connectivity:
1.RNC DDF CWO (SDH) CWO(SDH) - Node B
2.RNC DDF MW A MW B - Node B
3.RNC DDF CWO (SDH) CWO(SDH) -MW A
MW B - Node B

Three level of CWO:


1. E1 - E1.
2. STM E1.
3. STM STM.

Near End

Far E

E1 E1
The Following test must be:
Near End

Far End

1. Huawei will send KLM to ADM.


2. ADM team will do soft loop with RNC.
3. Field Engineer do Test Loop from ADM
DDF location and confirm with RNC.
4. Filed Engineer to connect cable from SDH
DDF to ADM DDF.
5. Filed Engineer to do Loop test from all
CWO points in near end and confirm with
RNC.

1. . Filed Engineer to do Loop test from


CWO points in Far end and confirm with
RNC.
2. Connect Cable from SDH DDF to MW
DDF block.

Format to fill
Near End
Site ID NI

ADM Cross
connecting
(Y/N)

Get ADM
E1 DDF
location
(Y/N)

Loop test
from ADM
DDF to RNC
(Y/N)

ADM DDF
SDH DDF
cable
(Y/N)

Loop test from


tie cable points
(Y/N)

Far End
Loop test from SDH
DDF to RNC
(Y/N)

Connect cable BW
SDH DDF to MW
(Y/N)

If troubleshooting required you must specify from exchange and from which
point can not receive loop.

STM E1

STM E1
The Following test must be:
Near End

Far End

1. Field Engineer to connect fiber from RNC


ODF to SDH ODF.
2. Filed Engineer to only check if all cable in
Tie cables in SDH ODF already connecting.

1. . Filed Engineer to do Loop test from


CWO points in Far end and confirm with
RNC.
2. Connect Cable from SDH DDF to MW
DDF block.

Format to fill
Near End
Site ID NI

RNC ODF SDH ODF cable


(Y/N)

Physical check for all tie cable


points already connect
(Y/N)

Far End
Loop test from SDH
DDF to RNC
(Y/N)

Connect cable BW
SDH DDF to MW
(Y/N)

If troubleshooting required you must specify from exchange and from which
point can not receive loop.

STM -STM

STM STM
The Following test must be:
Near End

Far End

1. Field Engineer to connect fiber from RNC


ODF to SDH ODF.
2. Filed Engineer to only check if all cable in
Tie cables in SDH ODF already connecting.

1. Field Engineer to connect fiber from RNC


ODF to SDH ODF.
2. Filed Engineer to only check if all cable in
Tie cables in SDH ODF already
connecting.
3. Inform Huawei Engineer to escalate to
STC / PID to get E1 drop point .
(If MW is Traffic Node *usually in Dammam
and Hafouf in eastern region *the E1
drop will be in site directly).

Format to fill
Near End
Site ID NI

RNC ODF SDH ODF cable


(Y/N)

Physical check for all tie cable


points already connect
(Y/N)

Far End
Physical check for all tie
cable points already
connect
(Y/N)

Get E1 DDF ( Y / N )

Loop test to
Connect cable BW
RNC when get SDH DDF to MW
E1 DDF ( Y / N ) ( Y / N )

IF MW in Eastern Area( DAMMAM & Hafouf ) E1 drop by STC PID will be in


site directly.
If troubleshooting required you must specify from exchange and from which
point can not receive loop.

Connectivity Type
There are three types of connectivity:
1.BSC DDF CWO (SDH) CWO(SDH) - BTS
2.BSC DDF MW A MW B - BTS
3.BSC DDF CWO (SDH) CWO(SDH) -MW A
MW B - BTS

Tools
1.
2.
3.
4.
5.
6.

Puncher.
Loopback.
Cutter.
Tie cable.
Tape.
Label machine.

Tools

Huawei

Ericsso
n

Siemen
s

Lucent

CWO Equipments
Huawei Optix, Lucent & Siemens.
1.Huawei Optix:
Flr/Bay/Pnl/Blk/Row(Tx-Rx)/Port
01/108.01/03/01/08-07/14

Huawei DDF

2. Lucent :

Flr/Bay/Pnl/Blk/Conn
01/102.03/02/07/26

Lucent DDF
Floor/Cabinet lable/Panel/Block/E1 No.
Floor/Cabinet label

Lucent DDF Ex: 01/109.04/03/02/07

LUCENT DDF
16
Panel Number

Block
1,2,16

E1 Number start from 1,2,364 if use small block each block contain 4 E1
E1 Number start from 1,2,380 if use small block each block contain 10 E1

3. SIEMENS:
Flr/BayLoc/Pnl/Blk/Row/Pin
G/102.01/03.01/09/1-6

Digital Microwave
There are different type of Microwave Equipment:

Huawei
NEC
Ericsson (Mini-Link )
Siemens
Harris
Lucent( P-com)
Nokia (Flexi hopper)
Nera

ERICSSON
Tributary Cables

Ericsson (Mini-link):

ERICSSON MW
There are different capacity (4-8-16-32) E1
- Use Link-Manager Software.
Connect to O&M port in MMU

ERICSSON

1111

ERICSSON
Change the communication port.

As your Computer port

ERICSSON
Local Unit

Choose Scan Local in Network

Remote unit

Double click in first link (Local)

ERICSSON
Local unit must be highlight

ERICSSON
If there is mark that is mean used if not it is free.
To activate, Mark the free one and save

Active

Free

ERICSSON
Physical connection:
-Trace the Tributary cable from MMU
unit( direction to your object site), then check
by led if there is E1 free ( If led give light in
Tx and Rx that mean used but if only give one
light Tx and no light from Rx that is free.
-Connect your cable as cross connection
Tx from your cable to Rx from MW
Rx from your cable to Tx from MW

ERICSSON BLOCK
E1 -1

E1 -2

E1 -3

E1 -4

ERICSSON TN
Traffic node must be defended by STC and
must be Label

TN

HARRIS MW
Harris Mw need to connect to CIT port and using Hyper terminal
Tributary Cable

HARRIS
Start Programs Accessories Hyper
terminal

HARRIS
Configure port setting

As your computer port

HARRIS
Press F1 till you see next
screen

HARRIS
Scroll down by arrow and choose Configuration then press enter the screen no. 2
appear then choose IDU and press enter to go back press F4

F1

(1)

F2

F3

(2)

F4

HARRIS
Scroll down by arrow and choose Tributary then press enter
the screen no. 2 appear then choose which E1 is free ( you can
check physically first) and press enter to go back click F4

F1

F2

F3

F4

F1

F2

F3

F4

HARRIS
To activate E1 press F2 and F3 till you see the value change from Disable to Enable
in actual and new value then press F4 till you reach the first screen after that you
can exit hyper terminal.
Not ready to use
Activated and
ready to use

F1

F2

F3

F4

F1

F2

F3

F4

HARRIS
Physical connection:
-Trace the Tributary cable from MW
unit( direction to your object site), then check
by led if there is E1 free ( If led give light in
Tx and Rx that mean used but if only give one
light Tx and no light from Rx that is free.
-Connect your cable as cross connection
Tx from your cable to Rx from MW
Rx from your cable to Tx from MW

HARRIS BLOCK
E1 -1

E1 -2

E1 -3

E1 -4

P-COM
P-Com MW need to connect to Computer port
and use Link Manger SW.
Tributary cable

P-COM

P-COM
Change the port setting

P-COM

P-COM
To activate E1 mark in enable column then save

Active and
ready to use

P-COM
Physical connection:
-Trace the Tributary cable from MW
unit( direction to your object site), then check
by led if there is E1 free ( If led give light in
Tx and Rx that mean used but if only give one
light Tx and no light from Rx that is free.
-Connect your cable as cross connection
Tx from your cable to Rx from MW
Rx from your cable to Tx from MW

P-COM BLOCK
Always P-com is 4 E1 only ,
You have to trace cable from
MW and check the
connection point from back

E1
E1
E1

SIEMENS
Siemens DDF Ex:
Floor/Cabinet lable/Panel.block/Row/E1
G/102.04/04.01/10/1-6
Row
Each Row contain only 2 E1( 1-6 and 7-12)
1

16

7-12

You might also like