PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Sl.
Name of the
Installed
Estimated Cost
Date of issue of
Date of
No.
Project /
Capacity
including IDC (Rs.
TEC letter
Financial
Organisation
(MW)
Crores)
Package
State (District)
approval
(Date of
Fin.
Closure)
THERMAL SCHEMES
NORTHERN REGION
Uttar Pradesh
1.
Rosa TPP
2x283.5
US$280.7267M
19.9.97
- M/s Indo-Gulf
=567.0
+Rs.1435.5284 Cr.
Fertilizers and
(ER
Chemicals Corpn.
1US$=Rs.35.50)
Ltd. (Shahjahanpur)
= Rs.2432.108 Crs.

Rajasthan
2.
Dholpur CCGT
- M/s RPG Dholpur
Power Co. Ltd.
(Dholpur)

3.

Barsingsar Lignite
TPP
- M/s Hindustan
Vidyut Corpn. Ltd.
(Through
competitive bidding
based on tariff)
( Bikaner)

702.7

2x250
=500

US$364.29M
+Rs.855.133 Cr.
(ER
1US$=Rs.39.50)
= Rs.2294.079 Crs.
US$322.716M
+Rs.1090.08 Cr.
(ER
1US$=Rs.31.50)
= Rs.2106.6354 Crs.

2x535
=1070

2.

Korba (W) TPP


- M/s India Thermal
Power Ltd.
(Bilaspur)

2x210
=420

3.

Bhilai TPP
- M/s Bhilai Power
supply Co.
(Durg)

2x287
=574

4.

Raigarh TPP
- M/s Jindal Power
Ltd.
(Raigarh)

2x275
=550

US$863.95M
+Rs. 1623.04 Cr.
(ER
1US$=Rs.35.50)
= Rs.4690.0625 Crs.
US$164.643M
+DEM169.73 M
+Rs.834.351Cr.
(ER Rs.35.50/US $
& Rs.20.50/DEM)
= Rs.1766.78 Crs.
US$419.699M
+Rs.999.781 Cr.
(ER
1US$=Rs.35.50)
= Rs.2489.7124 Crs.
US$85.176M
+DEM 240.676 M
+Rs.1628.075 Cr.
(ER Rs.35.50/US$,
Rs.20/DEM).
=Rs.2411.8018 Crs.

Project is being
executed by M/s Rosa
Power Supply Co. Ltd.
Main plant order placed
to M/s Shanghai
Electric Corpn. China in
11/2006 for 2x300 MW

12.3.98

Project development
stands closed as per
GOR lr. Dated
12.7.02.

20.4.98

Development of
Project by HVCL is
closed. Project of
2x125 MW is being
developed by NLC.
Main plant order
placed to BHEL on
19.8.05

Sub-total (NR) T-3 Nos.- 1769.7 MW

WESTERN REGION
Chhattisgarh
1.
Korba (East) TPS
- M/s Daewoo
Power (India) Ltd.
(Bilaspur)

Remarks

30.12.96

12.9.97

3.10.97

17.11.97

Status as on 31.10..08

Sl.
No.

5.

6.

7.

8.

9.

10.

11.

12.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the
Installed
Estimated Cost
Date of issue of
Date of
Project /
Capacity
including IDC (Rs.
TEC letter
Financial
Organisation
(MW)
Crores)
Package
State (District)
approval
(Date of
Fin.
Closure)
Gujarat
654.7
2298.14
25.11.93
1/96
Paguthan CCGT
- M/s Gujarat
Torrent Energy
Corpn. Ltd.
(Bharuch)
Hazira CCGT
515
US$284.35M
8.8.05
- M/s Essar Power
+ Rs.770.87 Cr.
(Achieved)
Ltd.
(ER
(Surat)
1US$=Rs.31.50)
= Rs.1666.5725 Crs.
167
368.22
30.10.95
Baroda CCGT
(Achieved)
- M/s GIPCL
(Baroda)
Surat Lignite TPP
2x125
26.8.96
US$44.538M
- M/s GIPCL
=250
+DM4.92M
(Surat)
+Rs.999.99 Crs.
(ER 1US$=Rs.35,
1DM=Rs.23)
= Rs.1167.189 Crs.
Jamnagar Petcoke
2x250
US$434.36M
25.5.99
TPP
=500
+ Rs.726.429 Cr.
- M/s Reliance
(ER 1US$=Rs.42)
Power Ltd.
= Rs.2550.73 Crs.
(Jamnagar)
Madhya Pradesh
17.6.97
2x289
US$175.412M
Bina TPS
=578
+ Rs.1820.627Cr.
- M/s Bina Power
(ER 1US$=Rs.35.50
Supply Co. Ltd.
(Rev.)
(Sagar)
= Rs.2443.3396 Crs.
27.6.97
166
US$77.74M+
Narsingpur CCPP
Rs.253.697Cr.
- M/s GBL power
(ER
India Ltd.
1US$=Rs.35.50)
(Narsinghpur)
= Rs.529.674 Crs.
Pench TPS
2x250
US$284.908M
19.9.97
- M/s Pench Power
=500
+ Rs.1172.155 Cr.
Ltd.
(ER
(Chindwara)
1US$=Rs.35.50)
= Rs.2183.5784 Crs.

Remarks

Commissioned on
13.10.98

Commissioned on
26.5.97

Commissioned on
18.11.97

Commissioned on
16.1.2000

Status as on 31.10..08

Sl.
No.

13.

14.

15.

16.

17.

18.

19.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project /
Installed
Estimated Cost
Date of issue of
Date of
Organisation
Capacity
including IDC
TEC letter
Financial
State (District)
(MW)
(Rs. Crores)
Package
approval
(Date of
Fin.
Closure)
22.7.98
US$160.50M
347.25
Guna CCGT
+ Rs.509.54 Cr.
- M/s STI Power India
(ER
Ltd.
1US$=Rs.35.50)
(Guna)
= Rs.1079.315 Crs.
US $ 152.37 M
+ Rs.484.86 Crs.
330
(ER
(Revised)
1US$=Rs.35.50)
=Rs.1025.7735
Crs.)
Bhander CCGT
5.3.98
342
US$197.622M
- M/s Bhander Power
+ Rs.346.514 Cr.
Ltd. (Gwalior)
(ER
1US$=Rs.35.50)
= Rs.1048.0721
Crs.
Pithampur DGPP
119.7
US$68.729M
10.2.98
- M/s Shapoorji Pallonji
+ Rs.174.053 Cr.
Power Co. Ltd.
(ER 1US$=Rs.39)
(Dhar)
= Rs.442.0961 Crs.
10.2.98
118.63
US$73.88M
Ratlam DGPP
(Achieved)
+ Rs.163.162 Cr.
- M/s GVK Power
(ER 1US$=Rs.39)
(Ratlam) Ltd.
= Rs.451.294 Crs.
( Ratlam)
Khandwa Naphtha
171.17
US$76.0345M
29.5.98
CCGT
+ Rs.250.3315Cr.
- M/s Madhya Bharat
(ER
energy Corp Ltd.
1US$=Rs.39.50)
(East Nimar)
= Rs.550.6677 Crs.
Maharashtra
9051.27
26.1193
(Ph I
2015
Dabhol CCGT
9.12.96)
- M/s Dabhol Power Co. (PhI695+
(Ph.II
PhII1320)
of M/s Enron, USA
6.5.99)
2184
(Ratnagiri)
(revised to
2184
MW)
(PhI740+
PhII 1444)
2x536
5187
29.12.94
Bhadravati TPS
=1072
- M/s Central India
Power Co. Ltd.
Promoted by Nippon
Denro Ispat Ltd.
(Chandrapur)

Remarks

Ph I & Ph.II
commissioned

Status as on 31.10..08

Sl.
No.

20.

1.

2.

3.

4.

5.

6.

7.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project /
Installed
Estimated Cost
Date of issue of
Date of
Organisation
Capacity
including IDC
TEC letter
Financial
State (District)
(MW)
(Rs. Crores)
Package
approval
(Date of
Fin.
Closure)
447.1
US$319.02M
22.1.98
Patalganga CCGT
+ Rs.246.66 Cr.
- M/s Reliance
(ER
Patalganga power Pvt.
1US$=Rs.35.50)
Ltd. (Raigarh) (Through
= Rs.1379.181 Crs.
competitive Bidding
based on cost)
Sub-total (WR) T-20 Nos. 10729.3 MW
SOUTHERN REGION
Andhra Pradesh
Jegurupadu CCGT
216
827.0
25.11.93
9/96
- M/s GVK Industries
(East Godavari)
Godavari CCGT
208
748.43
3.1.94
- M/s SPGL (East
(Achieved)
Godavari)
25.7.96
2x520
US$943.75M+
Vishakhapatnam TPP
=1040
Rs.1324.993 Cr.
(VIZAG)
(ER
- M/s Hinduja Nation
1US$=Rs.35.00)
Power Corpn. Ltd.
= Rs.4628.118 Crs.
(Vishakhapatnam)
26.6.97
23.2.2001
2x260
US$369.30M
Ramagundam TPP
=520
+ Rs.1073.56 Cr.
- M/s BPL Power
(ER
Projects (AP) Ltd.
1US$=Rs.35.50)
(Karimnagar)
= Rs.2384.575 Crs.
350
US$180.616M
22.1.98
12.8.99
Kondapalli CCPP
+ Rs.385.254 Cr.
(9.12.98)
- M/s Kondapalli Power
(ER
Corpn. Ltd. (Through
1US$=Rs.36.00)
Competitive Bidding
= Rs.1035.47 Crs
based on tariff)
( Krishna)
2x260
US$355.131M
16.6.98
Krishnapatnam BTPP
=520
+ Rs.960.614 Cr.
- M/s BBI Power
(ER
Krishnapatnam Co.
1US$=Rs.35.50)
(Through Competitive
= Rs.2221.329 Crs
Bidding based on cost)
(Nellore)
Venagiri CCGT
492
US$248.02M
14.1.99
- M/s Ispat Power Ltd.
+ Rs.638.223 Cr.
(Through Competitive
(ER 1US$=Rs.42)
Bidding based on tariff)
= Rs.1679.907 Crs
(East Godavari)

Remarks

Commissioned on
20.6.97

Commissioned on
31.3.98

Commissioned on
18.10.2000

Status as on 31.10..08

Sl.
No.

8.

9.

10.

11.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project /
Installed
Estimated Cost
Date of issue of
Date of
Organisation
Capacity
including IDC
TEC letter
Financial
State (District)
(MW)
(Rs. Crores)
Package
approval
(Date of
Fin.
Closure)
Karnataka
Torangallu TPS
2x130
US$106.87M
22.3.96
- M/s Jindal Tractebel
=260
+ Rs.725.16 Cr.
(27.3.99)
Power Co. Ltd.
(ER
(Bellari)
1US$=Rs.34.50)
= Rs.1093.86 Crs
10.7.96
US$751.574M
4x250
Mangalore TPS
+ Rs.1580.89 Cr.
- M/s Mangalore Power. =1000
(ER
Co.-Subsidiary of
1US$=Rs.31.50)
4x253.3
Cogentrix Energy Inc.,
16.1.98
= Rs.3948.35 Crs
=1013.3
USA& General Electric
27.4.98
US $ 809.505 M
(Revised)
Capital Corp.
+ Rs.1671.98 Crs.
(South Canara)
(ER Rs.31.50/US
$)
= Rs.4221.92 Crs.
2x507.5
US$273.795M
Nagarjuna TPP
29.4.99
=1015
+ GBP 277.40 M
- M/s Nagarjuna Power
+F.Fr. 907.190 M
Corpn. Ltd.
+Rs. 1792.685 Crs.
(Udupi)
(ER Rs.42/US$,
Rs.68.50/GBP,
Rs.7.20/F.Fr.)
= Rs.5495.991 Crs
20.9.99
107.6
US$56.577M
Kaniminke (Bangalore)
+ Rs.152.969 Cr.
CCPP - M/s Peenya
(ER 1US$=Rs.42)
Power Co.
= Rs.390.59 Crs
(Bangalore)

Remarks

Commissioned on
16.5.99

Counter
guarantee
withdrawn by
MoP vide lr.
No.C-7/93-IPCI
(Vol.XI) dt.
20.10.2003

Under construction

Status as on 31.10..08

Sl.No
.

12.

13.

14.

15.

16.

17.

18.

19.

20.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project /
Installed
Estimated Cost
Date of
Date of
Organisation
Capacity
including IDC (Rs.
issue of
Financial
State (District)
(MW)
Crores)
TEC letter
Package
approval
(Date of
Fin.
Closure)
Kerala
Vypeen CCGT (LNG)
25.9.98
679.2
US$6.9M
- M/s Siasin Energy Ltd.
+ S.Fr.439.84 M
(Eranakulam)
+ Rs.771.475 Crs.
(ER Rs.39.50/US$ &
Rs.26.50/S.Fr.)
= Rs..1964.306 Crs
Kannur CCGT
513
US$210.010M
16.2.2000
- M/s Kannur Power Projects
+ Rs.587.971 Cr.
Ltd.
(ER 1US$=Rs.42)
(Kannur)
= Rs.1470.013 Crs
Tamil Nadu
19.8.94
1x250
US$261.59M
Neyveli TPS Zero Unit
(3.11.99)
=250
+ Rs.501.10 Crs.
- M/s ST-CMS Electric
(ER 1US$=Rs.31.50)
Company
= Rs.1325.11 Crs
(South Arcot)
Pillaiperumalnallur CCGT
330.5
US$206.549M
24.11.95
15.5.98
- M/s PPN Power Co.
+ Rs.429.80 Crs.
(7.12.98)
(Thanjavur)
(ER 1US$=Rs.33.50)
= Rs.1121.739 Crs
3.4.96
2x525
US$585.96M
North Madras TPS Stage-II
=1050
+ Rs.2402.24 Crs.
- M/s Videocon Power Ltd.
(ER 1US$=Rs.34.50)
(M.G.R.)
= Rs.4423.802 Crs
Basin Bridge DGPP
4x50
US$125.82M
10.7.96
completed
- M/s GMR Vasavi Power
=200
+ Rs.328.99 Crs.
cost
Corpn.Ltd.
(ER 1US$=Rs.34)
approved
(Madras)
= Rs.756.778 Crs
on 2.8.2001
(18.6.97)
31.7.97
Tuticorin TPP St.IV
1x525
US$321.779M
- M/s SPIC Electric Power
=525
+ DEM 145.893 M
Corp. Ltd.
+ Rs.875.389 Crs.
(Chidambaranar)
(ER 1US$=Rs.35.50,
1 DEM= Rs.21)
= Rs.2324.08 Crs
Samayanallur DGPP
106
US$59.84M
10.2.98
- M/s Balaji Power Corp.
+ Rs.150.845 Crs.
(4/2000)
Ltd.
(ER 1US$=Rs.39)
( Madurai)
= Rs.384.221 Crs
Samalpatti DGPP
10.2.98
12.8.99
106
US$61.222M
- M/s Samalpatti Power Co.
(24.12.99)
+ Rs.153.098 Crs.
(Dharampur)
(ER 1US$=Rs.39)
= Rs.391.85 Crs

Remarks

Commissioned
on 11.10.02

Commissioned
on 5.4.01

commissioned
on 31.12.98

Commissioned
on 22.9.01

Commissioned
on 3/2001

Status as on 31.10..08

Sl.
No.

21.

22.

23.

1.

2.

3.

4.

*5.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project /
Installed
Estimated Cost
Date of
Date of
Organisation
Capacity
including IDC (Rs.
issue of
Financial
State (District)
(MW)
Crores)
TEC letter
Package
approval
(Date of
Fin.
Closure)
31.7.98
North Madras TPP-III
1x525
US$147.915M
- M/s Tri Sakthi Energy
=525
+ GBP 122.927 M
Pvt. Ltd.
+ F.Fr. 458.023 M
(MGR )
+ Rs.736.56 Crs.
(ER Rs.35.50/US$,
Rs. 57.00/GBP and
Rs.6.21/F.Fr.)
= Rs.2246.774 Crs
Cuddalore TPP
13.8.99
2x660
US$488.193M
- M/s Cuddalore Power Co. =1320
+ GBP 203.922 M
(South Arcot)
+ F.Fr.1258.811 M
+ Rs.2036.501 Crs.
(ER Rs.42.50/US$,
Rs. 68.00/GBP and
Rs.7.00/F.Fr.)
= Rs.6379.159 Crs
24.9.99
1873
US$694.94M
Vembar CCGT (LNG)
+ Rs.2106.67 Crs.
- M/s India Power Projects
(ER 1US$=Rs.42.50)
Ltd.
= Rs.5060.165 Crs
(Ramanathapuram &
Tuticorin)
Sub-total (SR)T-23 Nos.-13219.5 MW
EASTERN REGION
Orissa
Ib Valley TPP Unit 5 & 6
2x250
US$326.02M
26.2.99
- M/s AES Ib Valley
=500
+ Rs.983.90 Crs.
Corpn.
(ER 1US$=Rs.42.50)
(Jharsuguda)
= Rs.2369.485 Crs
29.4.99
2x250
US$313.596M
Duburi TPP
=500
+ Rs.952.83 Crs.
- M/s Kalinga Power
(ER 1US$=Rs.39.50)
Corpn. (Jajpur)
= Rs.2191.5342 Crs
Jharkhand
Jojobera TPS
2x120
1025.19
17.12.97
- M/s Jamshedpur Power
=240
(17.12.98)
Co. Ltd. (Jamshedpur)
West Bengal
16.8.95
2x250
US$227.96M
Balagarh TPS
=500
+ Rs.1517.02 Crs.
- M/s BPCL
(ER 1US$=Rs.31.50)
(Hoogly)
= Rs.2234.69 Crs
23.6.98
2x210
US$23.400M
Bakreshwar TPP
=420
+ J Yen 20544.270 M
- M/s Bakreshwar Power
+ Rs.925.157 Crs.
Gen. Co. Ltd.
(ER Rs.39.50/US$ and
(Through MOU route)
Rs.0.294/J Yen)
(Birbhum)
= Rs.1621.5885 Crs

Remarks

Status as on 31.10..08

Sl.
No.

**6
.

PRIVATE SECTOR THERMAL SCHEMES CLEARED/APPRAISED BY CEA


(UNDER THE PROVISIONS OF REPEALED E(S) ACT 1948)
Name of the Project
Capacity
Estimated Cost
Date of issue
Date of
State (District)
(MW)
including IDC (Rs.
of TEC letter Financial
Crores)
Package
approval
(Date of
Fin.
Closure)
Gouripore TPP
1x150
US$28.07M
19.4.99
- M/s Gouripore Power Co. =150
+ Rs.548.566 Crs.
Ltd.
(ER 1US$=Rs.39.50)
(North 24 Pargana)
= Rs.659.4425 Crs
Sub-total (ER)T-6 Nos.-2310 MW
NORTH-EASTERN
REGION
NIL

Total All India (Thermal) 52 Nos. 28028.5 MW


Grand Total All India (T+H)-61 Nos. 30824.5 MW (Rs.126726.65 Crs.)
Hydro 9 Nos. 2796 MW (Rs.13515.74 Crs.)
Thermal-52 Nos. 28028.5 MW (Rs.113210.91 Crs.)
* M/s WBPDCL requested for transfer of TEC of the project to them as per Govt. of West Bengal
decision. A DPR submitted in State sector by WBPDCL as Bakreshwar TPS Unit 4 & 5 (2x210 MW) had
been accorded TEC by CEA on 31.5.02 at an estimated completed cost of US$ 80.0M+Rs.920.715 Crs.
Including IDC and F.C. at F.E. rate of Rs.49.0/US$.
** State govt. have revoked the authorisation u/s 18 A given to M/s GPC and authorised WBPDCL to
establish, own, operate and maintain the Gouripore TPS. WBPDCL had submitted a project profile for a
capacity of 2x125 MW in 6/01, which was returned on 8.9.01. WBPDCL have however intimated vide lr.
Dt.9.10.01, that the proposal has to be dropped as per the present stringent norms of West Bengal Pollution
Control Board in regard to environmental aspect.

Remarks