Professional Documents
Culture Documents
Tank Inspection After Discharge 2
Tank Inspection After Discharge 2
CORPORATION
M/T KANDILOUSA
PIRAEUS
Date :
Port :
Voy :
Time :
08/06/95
New Orleans
5
18:00
TANK INSPECTION
BEFORE LOADING / AFTER DISCHARGING
x
Product.................................................................................................
Tanks under Inert Gas or not.........................................................
yes
Hand dips or auto gauge or visual inspection........................... Hand Dips
This is to certify that the undersigned inspector Mr................. John Circello
did inspect vessel's cargo tanks and main cargo lines were drained and found
them empty. All cargo has been discharged except where specified to the
contrary , as below :
TANK
No
1-C
2-C
3-C
4-C
5-C
6-C
7-C
SL.(P)
SL.(S)
TOTAL
DIP
cm
NIL
NIL
NIL
1
NIL
NIL
1
13
NIL
0
QUANTITY
cubic meters
0
0
0
1.50
0
0
0.30
3.90
0
5.70
530
cm Aft :
cm Trim
880
Remarks :
CHIEF OFFICER
INPECTOR
NAME :
GALIASSOS KONSTANTINOS
SIGNATURE :
350 cm