Tsi = Processing time at station Tr = Repositioning or Transfer time = + Tp = Actual average production time F = Downtime frequency Td = Average down time per line per stop
=1
Pi = Probability or frequency of failure at station i
n = number of work stations on production line F = Expected frequency of line stops per cycle 1
Production rate
Ideal production rate
pc/min pc/min
Line efficiency (E) =
=
Proportion of downtime on line
= + + Cpc = Cost per piece Cm = Cost of steering material Co = Cost per minute to operate line Tp = Average production time per piece Ct = Cost of tooling per piece