You are on page 1of 2

Juan Valle

HW #1
CENG 118
Quantity
Work Item
Flooring (sf)
Base (sf)
Wall Finish (sf)
Ceiling (sf)
Light Fixtures
Fan (each)
Switches (each)
Plugs (each)
Doors (each)
Closet (each)
Window
Coverings (each)
Trim (each)
paint (sf)
Control Panel

Unit Cost

COST OF
AMOUNT UNIT HRS
LABOR
250
1
4
18
250
1
2
18
1000
1
8
18
250
1
8
18
2
1
2
30
1
1
1
30
2
2
1
30
4
1
2
25
3
1
1
22
1
1
1
25

# OF
WORKERS
2
2
4
2
1
1
1
1
1
1

Total Cost

MATERIAL EQUIPMENT SUB OTHER LABOR MATERIAL EQUIPMENT SUB OTHER


100
50
50
50
20
200
40
20
50
20

100
20
30
100
50
10
10
20
10
10

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

144
72
576
288
60
30
30
50
22
25

100
50
50
50
20
200
80
20
50
20

100
20
30
100
50
10
20
20
10
10

0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

30

100

40

240

100

40

1
1500
1

4
1
1

4
12
2

20
25
50

3
3
1

100
50
100

40
10
20

0
0
0

0
0
20

240
900
100

400
50
100

160
10
20

0
0
0

0
0
20

TOTAL COST

TOTAL
344
142
656
438
130
240
130
90
82
55
380
800
960
240
4687