AER 817 Systems Engineering

Project Report: Phase III

Due Date:

24 November 2014 5pm

Marks: 10

A project report is required with the following details:


1. Summary of Project Deliverables and Meetings
2. Meetings and Deliverables Master Schedule
3. Project Gantt Chart
4. Work Breakdown Structure
5. Technology Readiness Level (TRL)
6. Project Risk Management: Technical Risk Assessment and Managerial Risk Assessment
7. Components
<Maximum Number of Page: 2>
Pictures of the subsystems/components your groups has dealt with including name and
information and if you have CAD drawings provide the CAD drawings.
8. Design and Testing
<Maximum Number of Pages: 5 >
1.1) Requirements
1.2) Design:
A) Hardware:
Schematics
Block diagram,
B) Software
Algorithm <if available>
1.3) Testing
Testing Procedures
Results <if available>
9. Interfaces
<Maximum Number of Pages: 2 per subsystem>

4.1) System Interface Diagram <data and power>


4.2) System Interface between <Subsystem 1> and <Subsystem 2>
A) Power: Connectors
B) Data: Connectors
Digital Interfaces: Serial (RS232, RS485/422):
4.3) N2 Diagram
10. Mass and Power Budget
11. Estimate the cost of your components using the Bottom-Up Cost Estimation method