Professional Documents
Culture Documents
Rencana reparasi
pacemaker
Senin 12/01/2015
Kamar 7/III/B1
Amirullah
15-01-1970 (44th)
689888
S: menurun
O: KU: sedang
WSD + Spooling keruh
produksi (+) Undulasi (+), bu
bble (-)
A: Emphyema Thorax Dextra
POH-3 thoracotomy
S : sesak berkurang
O : KU : Baik
WSD + spooling keruh, Prod
uksi (+), Undulasi (+), buble (
-)
A : Efusi pleura sinistra
S : Kaki kana hitam
O : KU : Baik
A : Diabetic foot wagner IV
Kamar
Sanda
K6 B6
Ny Lawiah
31/12/1940
679866
Kamar 4/ bed 4
4.
Mutmainnah
09/08/1986
692551
Kamar 5 bed 3
5.
St. Jumriah
Kamar 5 bed 1
693651
S : sesak
O : sakit berat, sadar
A/ efusi pleura sinistra
Gv/ 3 hari
Awasi produksi chest tube
Amputasi tarsometatarsal (
menolak)
GV/hari
Lina Nana
RPK
7-2-1983 (31 th)
677929
S : tidak ada
O : KU sedang, sadar
A : End Stage Renal Desease
pro AV shunt
Rencana AV Shunt
Terapi lanjut sesuai TS ginjal
hipertensi
2.
WAHYUDIN
K2B3
684978
26-11-71 (43 th)
Post AV shunt
Rencana parade
4.
Rismawati
K6B3
694030
05/08/1994
Yohana nani
14/3/1974
693146
KAMAR 1 BED 4
Hj. Muliana
10-01-1968
686830
Rencana AV shunt
Tunggu jadwal
7.
Supriani
333150
Post debridement
GV/hari
Diana
17/3/1956 (58 th)
566041
Kamar 2/ bed 2
2.
Lewi Pabida
543485
8-7-1975 (39 th)
K5(II)B1
3.
Halipa
692728
1/7/1958
K4(III)B6
P: post AV shunt
Kunnu Hermawan K.
1-10-1974
693852
Kamar 3 B 1
5.
M.Ridwan M. Qasim
695078
K 3(III) B 4
GV/ hari
Post debridement
6.
Nuraida Djano
K 4 B3
Rencana pemasangan
cimino 8/1/2015
Konsul GH
7.
Hasna
Kamar 4 bed 4
13-04-1955 (59 th)
693761
GV/hari
Post debridement