You are on page 1of 1

Planning :

Determination of the scope of work


Collection of all relevant documents necessary for the RBI
implementation (. i.e. OMV philosophy and specs, API codes,
ASME codes and other specs and good practices guides)
Extraction of all relevant formulas, guidelines, tables and
charts relevant to the RBI
Categorization of the equipment on site
Collection of design data from engineering department
Collection of inspection data from QA/QC department
Creation of equipment database within the RBI software
Determination of the risk and the frequency of inspection
based on the RBI matrix results

List of documents:
-OMV specs (inspections strategy, HSE policy)
- Local regulations
-Relevant API codes, ASME codes
-Other specs and good practices guides

You might also like