Professional Documents
Culture Documents
Bts Site As-Built Documentation: List of Headings
Bts Site As-Built Documentation: List of Headings
Document No.
18PLK028_FMR_AS BUILT
DOCUMENTATION
Date : 26 Sept 2014
Rev. A
18PLK028
SITE
NAME
PANARUNG
UJUNG
DOCUMENT LIST
Site
: 18PLK028
Site Name : PANARUNG UJUNG
Sect
Document Name
1
2
DOCUMEN LIST
SITE DOCUMENT
Site Location
Configuration Data
Floor Drawing
Antenna Placement Information
CABLING
Cable Distribution Diagram BTS Cabling
Cable Distribution Diagram Power and Grounding
Cable Distribution Diagram- RF and Optical
Allocation Diagram, Rack Layout
: 18PLK028
: PANARUNG UJUNG
1. TECHNICAL DATA
G900
1.1.
BTS TYPE
: FMR
1.2.
1.3.
1.4.
U900
1.5.
1.6.
1.7.
1.8.
RRU TYPE
No. Of Sectors
No. Of Radio Cabinets
: 1 FXDB
:3
:1
BTS TYPE
RRU TYPE
No. Of Sectors
No. Of Radio Cabinets
: FMR
: 1 FXDB
:3
:1
1.9.
1.10.
1.11.
1.12.
BTS TYPE
RRU TYPE
No. Of Sectors
No. Of Radio Cabinets
: N/A
: N/A
: N/A
1.1.
1.2.
1.3.
1.4.
BTS TYPE
RRU TYPE
No. Of Sectors
No. Of Radio Cabinets
: N/A
: N/A
: N/A
G1800
U2100
: N/A
: N/A
2. ANTENNA
2.1.
Cell A
Type Antenna
Cell B
Type Antenna
Cell C
Type Antenna
2.2.
No. Of Hybrid ( Total )
2.3.
Total Hybrid Length/ Sector
: Antenna Tripleband
: RVVPX310R-BTQ
: Antenna Tripleband
: RVVPX310R-BTQ
: Antenna Tripleband
: RVVPX310R-BTQ
:1
(m)
: 50
3. BTS BUILDING
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
Type of Building
Height Of Bulding (M.A.G.L)
BTS Housing
Celling Material
Wall Material
Floor Material
: Greenfield
: : Outdoor Service Cabinet
: N/A
: N/A
: N/A
4. TOWER (SST)
4.1.
4.2.
Type Of Tower
Tower Height
: 42m
: SST
5. ELECTRICAL DATA
5.1. No. of 16 A DC
5.2. No. of 16 A DC
Connection
5.3. No. of 16 A DC
Connection
5.4. No. of 25 A DC
Connection
5.7. No. of 16 A DC
5.8. No. of 16 A DC
5.15. Rectifier Type
5.16. rectifier Load
SITE LOCATION
Region
CENTRAL
KALIMANTAN
City/Town/Village/A PALANGKARAYA
rea
Site Latitude -2.23456
General Description
Site ID 18PLK028
Site Name
Project
PANARUNG UJUNG
MBS
Site Longtitude
113.934838888889
Scoop
Outdoorization+No Program+No
Prorgam+New U900
Site Address
EMUa Port
1
2
3
4
5
6
7
8
9
10
11
12
DDF Port
1
2
3
4
5
6
7
8
9
10
11
12
Optical Cable From BBU System Unit to DDF should follow standardization (see
picture)
1
RF
U
90
0#
1
RF
G
90
0#
1
RFD
180
0#
1
5
RFU
210
0#
1
6 7 8
10
11
RF
U
90
0#
2
RF
G
90
0#
2
RFD
180
0#
2
1
2
13
RFU
210
0#
2
Sector 1, 2, 3
1 1
4 5
1
6
17
18
19
20
RF
U
90
0#
3
RF
G
90
0#
3
RFD
180
0#
3
RFU
210
0#
1
2
1
2
2
2
3
2
4
Service Cabinet
Allocation
IDU (Transmision)
Diagram, Rack
IDU (Transmision)
Layout
DCS 1800
Site
: 18PLK028
GSM 900
Site Name
: PANARUNG
UJUNGUMTS 900
NSN
Ran
Transmission
Fiber patch panel
Power system + dc
list
Ac distribution
2 string battery
UMTS 2100
ODF
Space
DC Power System
Battery Bank 1
Battery Bank 2
DC
TYPE
DC
POWE
R
SUPLY
SYSTE
M
EQUIPMENT
CIRCUIT
MEMBER
SPECIFICATI
ON
EMUE
BBU Main
16 A
16 A
BBU Spare
16 A
RF Module 1
25 A
RF Module 2
25 A
RF Module 3
25 A
DESCRIPTION
RF Module
ALL Sector
6U
3U
1U
5U
3U
16U
Antenna Sector 1
Antenna Sector 2
Antenna Sector 3
RFM FXEA1800
ODF