Checking Gauge

POSITION
The third
party

Annually

11/11/2013

11/11/2014

Mee ng on TB for drillers

Weekly

07/18/2014

Checking winch

The third
party
The third
party
The third
party
The third
party
The third
party
The third
party

every half year

05/09/2014

09/11/2014

Visual inspec on of the winch

Weekly

07/18/2015

5 "Drill pipe G105

12/14/2014

Visual inspec on of the li

Weekly

18/07/2016

4 "Drill Pipe S135

XT39

14

Visual inspec on of the crane

Weekly

18/07/2017

3 1/2 IF

15.5

Weekly

07/18/2018

3 1/2 "Drill pipe


G105
2 3/8 "Drill pipe
G105

2 3/8 IF

6.65

18/07/2019

5 "HWDP

April 1 / 2IF

49.3

4 "HWDP

XT39

28.3

9 1/2 "DC

7 5/8 Reg

220

8 "DC

Inspec on of forkli
Crane Inspec on
H2S detec on system
Hydrocarbon system
Sample test air
Checking ex nguisher
Electro-Magne c Brake Eciency:
............ ...%
POSITION

Annually

12/14/2013

every half year

6/14/2014

Month

06/14/2014

Month

No

Visual inspec on of the fall arrest belts


No

every half year


Month

07/07/2014

Month

10/07/2014

FREQUENCY

LAST

POSITION

Visual inspec on of the lock in the fall

Month

Falling objects

Weekly

07/18/2020

Checking the health of the camp

Weekly

30.06.2014

NEXT

POSITION

FREQUENCY

Fire a drill (Camp)


Fire a drill (BU)

Month
Weekly

Training ACT
Learning how to work with ba eries

Month
Month

A drill H2S

Weekly

Training with tension cable

Weekly

A drill defense
A drill on barns

Month
Weekly

Educa onal work at height


Training accident

Month
Quarterly

POSITION
Smoke Detectors
Fire pump (Camp)
Fire pump (BU)
Checking belay belts
Inspec on BU / Masts
Checks PCM

FREQUENCY

LAST

Weekly
Weekly
Weekly
Weekly
Weekly

No
No
12.07.2014
12.07.2014

NEXT

12/08/2014
12/08/2014

2 mes a week

Mee ng on TB

Month

Crimping defense / choke manifold

30.07.2014

LAST

NEXT

12.07.2014

12/08/2014

ITEM

ITEM
Fire Drill (Camp)

3rd Party
3rd Party
3rd Party
3rd Party
3rd Party
3rd Party
3rd Party

41

4 3/4 "DC

2 7/8 IF

22

4 mes
4 mes
4 mes

NEXT DUE

FREQUENCY
Monthly

LAST DONE

No

07/07/2014
10/07/2014

Ba ery
1 per year

FREQUENCY

Drillers HSE Mee ng


Winches Visual Inspec on
Forkli Visual Inspec on
Crane Visual Inspec on
Harness Visual Inspec on
Fall Arrestor Visual Inspec on
Drops Object
Camp Hygiene Inspec on

ITEM
Trip Drill

Weekly
Weekly
Weekly
Weekly
Weekly
Monthly
Weekly
Weekly

FREQUENCY
Monthly

Accumulator Drill

Monthly

H2S Drill
BOP Drill
Pit Drill

Weekly
Monthly
Weekly

Stretcher Drill
Ver cal Rescue Drill
Disaster Drill

Weekly
Monthly
Quarterly

LAST DONE
absence

NEXT DUE
absence

absence
12.07.2014
12.07.2014

absence
12/08/2014
12/08/2014

12.07.2014

12/08/2014

ON-SITE

REPAIR

LAST

LAST

INSPECTION
NEXT

INSPECTION

In Defense

POSITION

ON-SITE

REPAIR

NEXT

TUBULAR
INVENTORY
SIZE
5 "DP G105
4 "DP S135
3 1/2 "DP G105
2 3/8 "DP G105
5 "HWDP
4 "HWDP
9 1/2 "DC
8 "DC
6 1/2 "DC
4 3/4 "DC

CONN
4 1/5 IF
XT39
3 1/2 IF
2 3/8 IF
4 1/5 IF
XT39
7 5/8 Reg
6 5/8 Reg
3 1/2 IF
2 7/8 IF

WT / FT
19.5
14
15.5
6.65
49.3
28.3
220
160
41
22

ON SITE

REPAIR

REAMERS
INVENTORY
SIZE

NEAR BIT

STRING

ON SITE

REPAIR

LAST DONE

NEXT DUE

IN BOP

POSITION

ONSITE

TOTAL

INSPECTION
LAST DONE

NEXT DUE

Deaf
9 5/8 "
7"
5"

Weekly

FREQUENCY
Weekly
Weekly
Weekly
Weekly
Weekly
Bi-Weekly
Monthly
Bi-Weekly
Quaterly
Quaterly
Quaterly
Half Yearly
Quarterly

STRINGS

NEXT

Shear

ITEM

NEXT DUE

Near Bit

ACCOUNTING DICE Defense


POSITION

4"
3 1/2 "
2 3/8 "

11/11/2014
09/11/2014
12/14/2014

LAST

12 1/4 "
8 1/2 "
6 1/8 "

4 1/2 "

LAST DONE

REPAIR

16 "

H2S
Fire (Camp)
Fire (BU)
Defense
ACT

Fire Drill (Rig)

ITEM
Smoke Detectors
Fire Pump (Camp)
Fire Pump (Rig)
Safety Harness Inspec on
Rig Inspec on / Derrick
PCM Checks
Safety Mee ng
BOP test / Choke Manifold
Mud Pump POP O's
Camp Tank Cleaning
Rig Tank Cleaning
HSE Work Group Audit
QSI Schedules

160

3 1/2 IF

Quarterly

11/11/2013
05/09/2014
12/14/2013
6/14/2014
06/14/2014
No

19.5

6 5/8 Reg

every half year

Yearly
Half Yearly
Yearly
Half Yearly
Monthly
Monthly
Half Yearly
Monthly
Monthly

4 1/2 IF

INSPECTION
ON-SITE

28 "
22 "
17 1/2 "

Obstacles STOP

FREQUENCY

WEIGHT /
FT

6 1/2 "DC

SIZE

Drills on TB incidence in the last month:

Audit, Safety and Environment (STOP)

Quarterly
Quarterly
Quarterly

CONN

ACCOUNTING expander

COLOR CODE HANDLING EQUIPMENT

Guage Calibra on
Li ing Gear Inspec on
Forkli Inspec on
Crane Inspec on
H2S Detec on System
Hydrocarbon System
Breathing Air Quality Sample
Fire ex nguisher Inspec on
Baylor Brake Eciency: ............ ...%

ACCOUNTING FOR PIPE


SIZE

Barn

2 mes a week

Mud Pump POP O's


Cleaning the tank at Camp
Cleaning the tank at BU
Audit Group Health, Safety and
Environment
Graphs QSI Schedules

NEXT

SAFETY DRILL FREQUENCY MONTH OF:


H2S
Fire Drill at Rig site
BOP at Rig site
Trip
Pit
Accumulator
STOP Audit
STOP Obstruc ons

LAST DONE

NEXT DUE

07/18/2014
07/18/2015
18/07/2016
18/07/2017
07/18/2018
18/07/2019
07/18/2020
18/07/2021
LAST DONE

NEXT DUE

INSPECTION
LAST DONE

NEXT DUE

INSPECTION

28 "
22 "
17 1/2 "
16 "
12 1/4 "
4 me
4 me

COLOUR CODE LIFTING EQUIPMENT

10/12/2014 10:48 AM

You might also like