University of Illinois

Polaroid Stories

Department of Theatre
1/23/15

Kat Korak, Technical Director

Bridge Structure
Description/Notes

NUMBER OF

BUILD
1
2
3
4
5
6
7
8
9
10
11
12

CREW

Pull Legs
Cut Custom Legs
Adjust Ramp
Pull Platforms
Cut Masonite
Glue together foam

1
1
2
3
2
2

1
2
3
4
5
6
7
8
9
10
11
12

1
1
4
4.5
8
8

TOTAL Build

26.5

CREW

Transport (ALL ELEMENTS BUT CAR)


Placement
Bolting
Facing

MATERIAL
4x8 Platform
Homosote (Much Ado)
Hardware
2" 4x8 Foam
4' Tunnel
3/4" Ply
2x4

TASK

1
1
2
1.5
4
4

HOURS PER

NUMBER OF

LOAD IN
1
2
3
4
5
6
7
8
9
10

HOURS PER

HOURS

4
2
2
4

COMPONENT

Platform
Facing
Fasteners
Facing
Tunnel
Angled Facing
Angled Facing

UNIT

All
Bridge
Bridge
Tunnel/LD
Tunnel
Bridge
Facing

TASK

HOURS

1
1.5
0.5
2

4
3
1
8

TOTAL Load in

16

QUANTITY

UNIT PRICE

COST

ESTIMATE

ESTIMATE

ESTIMATE

3
6
1
2
1
2
1

$20.00

$20.00

$31.56
$8.83

$63.12
$8.83

TOTAL Materials

$91.95