December 8, 2014
‘Mr. Brian Giltner
253U Industry & Technology
Murray, 42071, Kentucky, United States
RE: Final Submittal CET481-02
Dear Mr. Giltner,
The Team W visited the Central Plant because an additional steam line will be
added, and it is responsibility of the group to analyze and find the conflicts that exist in
the area.
First of all, the Team W found some conflicts on site, one of them is that the pipe
should goes down at the column W10x60 (B3) because the first project show it, but at the
cross section draw shows that the pipe goes down at the interspace of columns A3 and
B3.
In conclusion, there is a discrepancy among those draws. Moreover, as the
building was created in 1976, they used only 2 bolts to construct, but nowadays it is used
4 anchor bolts at the base.
‘There are some attachments: bill of materials and the final sketch.
Sincerely,
Team W
: ce fora Bruno
GABRIELA LARA PEREIRA