LATHE JOB
Sr.
No.
Operation
Job diagram
Time
2.
a) Clamp side B
(Keep the job
80mm outside)
b) Set the tool
Machining of side A
(Facing)
a) Rough facing
( L=R=36/2=18)
[ N=433 rpm,
l=20 mm,
F=0.5 mm/rev
D= 1 mm]
b) Finish facing
[ N=433 rpm,
l=20 mm,
F=0.25 mm/rev
D= 0.5 mm]
3.
1 min
2 min
0.1848 min
0.1848 min
2 min
4.
5.
6.
0.554 min
1.109 min
0.4157 min
0.8314 min
2 min
7.
8.
Face side C
(L=32-28/2=2)
[ N=433 rpm,
l=4 mm,
F=0.25 mm/rev,
D= 0.5 mm]
9.
Clamp side A
10.
0.03695 min
2.0 min
0.0462 min
2.0 min
2 min
0.1848 min
b) Finish facing
[ N=433 rpm,
l=20 mm,
F=0.25 mm/rev
D= 0.5 mm]
11.
12.
13.
14.
0.1848 min
2 min
2 min
2.3095 min
1.848 min
0.5 min
Face D,
( L=R=(32-25)/2=3.5 )
[ N=433 rpm,
l=5 mm,
F=0.25 mm/rev]
0.04619 min
15.
16.
17.
0.406 min
0.813 min
0.0462 min
0.5 min
0.5 min
Chamfer side B
Chamfer side D
Chamfer side C
0.0196 min
0.0196 min
0.0196 min
18.
19.
20.
2 min
1.0 min
0.65 min
5 min
0.666 min
1.0 min
21.
0.555 min
38.63 min
40 min
FORMULAE USED:
Cutting Speed: CS = (* d * N)/ 60,
Time taken to machine: t = l/ (F*N),
Where, l: Length of cut,
F: feed,
N: Speed
Total time taken=T =t* no. of cuts performed.