Water Resources Engineering BFW40103

There are lists of possible topics for group project.


1- One of the novel approach in solving the water shortage problem through a rainwater
harvesting system. Prepare a complete design system for rainwater harvesting for
a. FKAAS (1)
b. Convocation Hall (2)
c. ORICC (3)
2- Estimate surface runoff using rational method for
a. FKAAS area (4)
b. PKU area (5)
c. G3 area (6)
3- Estimate and predict the volume of water for
a. Semberong dam (7)
b. Machap dam (8)
c. Bekok dam (9)
4- Recently, our country experiencing a serious drought problem, as an engineer in water
resources, provide and propose a suitable solution to enlighten this problem. (10)
**Please prepare a complete report for each task given. Every report should contain several
important items as stated in the attachment file. Failure to include all the items could reduce the
marks. Please submit the report no later than 11 December 2014

Prepared by Dr Mohd Shalahuddin Adnan

Report content for BFW 40103/BFW 4013 project

Tajuk
1.

:
Pengenalan
-

2.

Kajian Literatur
-

3.

Pemerhatian
Pengumpulan data di lapangan/survey/temubual
Pengumpulan data dari pihak2 tertentu eg: JPS etc

Analisis Data
-

5.

menyatakan kajian lepas yang pernah dilakukan oleh penyelidik terdahulu yang
berkaitan samada daripada buku, jurnal etc.

Methodologi
-

4.

Mengandungi kepentingan kajian yang ingin dilakukan.


Biasanya ada Pengenalan, Permasalahan, Objektif, Skop dan lokasi

Analisa data yang diperolehi dengan kaedah yang sesuai dan bincangkan hasil
keputusan yang diperolehi.

Kesimpulan
-

Berdasarkan pemerhatian dan informasi yang diperolehi, nyatakan cadangan anda


dalam menyelesaikan permasalahan yang berlaku di kawasan tersebut.

Notes:
1. Sumber : at least 5
2. Permarkahan: 20%