PREPLANNING OF ALL ACTIVITES

PLANNING

: It is the process of thinking about and organizing the activities


required to achieve a desired goal

PRE PLANNING: It is an attempt to consolidate a set of preparatory activities


into a special stage that goes prior to the project planning phase
pre-planning actions:
the following activites will set the stage for the planning process
-Determine who (individual or team) will convene the strategic planning process
-Establish a scope of work what will be the result of the strategic planning
process
-Determine who (internal or external)will conduct the strategic planning process
-Identifiy a methodology ,activities ,and schedule for the planning process
Formal preplanning involves five steps or phases, which are
1. Planning the planning process
2. Gathering information
3. Preparing the preplan
4. Disseminating the pertinent information in the to all affected parties
5. Evaluating the results of the planning efforts and its consequences
Preplanning contains mainly two activities:
1. Some off-site activities
2. Some on-site activities
Preplanning On-site construction activity:

SCOPE
The plan of superstructure wall of a single room building, and the cross section of the walls with
foundation
ENGINEERING PLANNING

CONSTRUCTION INPUTS
RESOURCES

Skilled& Unskilled
Labors

Tools
Digging Bar
Shovels
Plumb Bob
Fram square

Materials:
Lime concrete, cement
concrete
Bricks, stone blocks,..
etc
Cement
Aggregates ,ballast
,grit, sand

Equipments
concrete mixers
excavactors
cranes

METHOD OF BULDING ESTIMATE


DETAILTS OF MEASUREMENTS AND CALCULATION OF QUANTITIES
Item
no
1

Particulars of Items

Concrete in
foundationLong walls
Short walls
Brick work in
foundation and plinthLong walls

Earthwork in
excavation in
foundationLong walls
Short walls

1st
footing
2nd footing
Plinth walls
Short walls-

N
o

Lengt
h

Breadt
h

Height or
Depth

Quantit
y

Explanatory
note

1st footing
2nd footing
Plinth walls

Brick work in
superstructure
Long walls
Short walls

Bar - chart Scheduling


Description

1
2

3
4
5
6

Days
J F

Earth work in excavation In


foundation
Concrete in foundation
Brick work in foundation in
plinth
1st footing
2nd footing
Plinth walls
Brick work super structure

PRODUCTIVITY IMPROVEMENT FACTORS


1.
OUT PUT
On time completion of the project
Less usage of materials
Causes less accidents at on site constructions
Budget allocations to the required project