SUB-SEA EXERCISE NO 6

Name:

Date:

Well data

Complete a kick sheet

Hole size

121/4

Hole depth

9,330 ft MD (9,130 ft TVD)

Mud weight in hole

12 ppg

Casing shoe depth

133/8 6,210 ft MD (6,120 ft TVD)

Water depth

750 ft density 8.56 ppg

Drill string
Drill pipe

0.0178 bbl/ft

Heavy weight drill pipe

0.0088 bbl/ft

475 ft

Drill collars

0.0078 bbl/ft

650 ft

Annular capacities
Drill pipe in marine riser

0.3636 bbl/ft

Drill pipe and HWDP/Casing

0.1242 bbl/ft

Drill pipe and HWDP/Open hole

0.1202 bbl/ft

Drill collar/Open hole

0.0836 bbl/ft

Choke line and riser data


Choke line capacity

0.0086 bbl/ft

Choke line length

840 ft

Marine riser length

820 ft

Mud pump data


Surface line volume

12 bbl

Pump output at 97 % efficiency

0.119 bbl/stroke

PSCR at 40 SPM through Riser

820 psi

PSCR at 40 SPM through choke line

910 psi

Leak of test data


Surface leak off pressure with 11 ppg mud
Kick data

Ak 2008 rev 1

Pit gain

30 bbl

Shut in drill pipe pressure

800 psi

Shut in casing pressure

920 psi

1,560 psi

1.

Calculate the casing shoe pressure safety margin, at shut in,


prior to killing the well.

2.

Calculate the gradient of the influx.

3.

Calculate the required kill mud weight.

4.

Calculate the required strokes from pump to bit.

5.

Calculate the required stokes from bit to shoe.

6.

Calculate the initial dynamic casing pressure at kill rate.

7.

Calculate the time required to circulate on complete circulation


at 40 strokes per minute.

8.

Calculate the initial circulating pressure.

9.

Calculate the final circulating pressure.

Ak 2008 rev 1

10.

Calculate the MAASP prior to killing the well.

11.

Calculate the MAASP after circulating of kill mud.

12.

Calculate the pressure reduction per 100 strokes of kill mud.


Pumped down the drill string at 40 SPM.

13.

Calculate the strokes required to displace the marine riser to


kill mud before opening the BOP.

14.

Calculate the mud weight including the riser margin.

15.

Calculate the MAASP with the riser margin mud weight.

Ak 2008 rev 1

SUB SEA Ex 6 ANSWERS

1.

321 psi
1,241 MAASP - 920 SICP

2.

0.289 (oil)
0.624 psi/ft - ((920 SICP -800 SIDDP) 359 ft)

3.

13.7 ppg

4.

1,406 strokes
(Including surface lines, 100 strokes)

5.

2,952 strokes

6.

830 psi
920 SICP - 90 C/L friction

7.

249 minutes
9,943 strokes 40 SPM

8.

1,620 psi

9.

937 psi

10.

1,241 psi

11.

700 psi

12.

52 psi/100 strokes

13.

2,505 strokes

14.

14.3 ppg

15.

515 psi