PUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITED
PUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITED
PUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITEDPUNJABSTATE POWER CORPORATION LIMITED
wesdt Tan 3:
lira on wes aralans fenfes
@asAs wa
993 /
Ut g.nrs-3208w-2
ufenrar)
waged 3: 21/2011
fish 13/9/2011
udte fefsonr 1981 (ifife-2005) fee do fet mera Au atst
wet 3:
PUR
AMENDMENT
SE REGULATIONS-1:
RINT-;
PENALTY/ DAMAGES FOR DELAY IN DELIVERY
REGULATION-9 ( SCHEDULE-E) (PAGE-48)
Reg. No.
Existing Clause
Proposed Clause
9
(Schedale-
>)
PENALTY/ DAMAGES
FOR DELAY IN
DELIVERY €orall
purchase orders other than
turnkey projects/ packages
PENALTY/ DAMAGES FOR
DELAY IN DELIVERY ( For
all purchase orders other
than turnkey _projects/
packages
TF the supplier fails to deliver the
material/equipment within the
stipulated delivery period of the
purchase order/contract, the same
is liable to be rejected and if
accepted, the supplier shall be
liable to pay as penalty charges, a
sum of 0.5% (half of one percent)
of the cost of undelivered supply/
incomplete equipment per month
of delay or part thereof, not
exceeding maximum limit of 5% of
the cost of complete unit of
undelivered equipment so delayed.
There will be a slack of one month
that will not entail any penalty and
will not envolved any additional
financial implication Delay
beyond slack period will attract
penalty for the period of delay
including slack period. However
therewil] be no penalty/ liquidated
damages in respect of purchase of
Proprietary items
If the supplier fails to deliver the
materiaVequipment within the
stipulated delivery period of the
purchase order/contract, the same is
liable to be rejected and if accepted,
the supplier shall be liable to pay
penalty @ 14% (half of one percent)
of the cost of undelivered supply/
incomplete equipment per week of
delay or part thereof, not exceeding,
maximum limit of 10% of the cost of
complete unit of undelivered
equipmentimaterial so delayed
‘There will be a slack of one month
that will not entail any penalty and
will not involve any additional
financial implication. Delay beyond
slack period will attract penalty for
the period of delay including slack
period. However therewill be no
penalty in respect of purchase of
Proprietary items
Yaris, ufenrerfils nia S: ge2e2/ea3e2 uty nra-s2nte-2 fic: 13/9/2011
Gudas or Gero o foflont Beer md nerd arawet (Us Sime wer B-
We fin: fes—dte/ Ulan Renta Seve’ et eae At,
Fas Tews
We we fishy uit eniaR ey stat oe A As
TEBE)
Ste ypiatt otras ufenrsr
fas wes Haze ata. oe. ot dataz!
at et Ub. ferfi8e ufenrer
im. tA) 2 Aa, UPR A es a A eaten |
We He der mrenane megics URAL piace ufenrer|
ah dete a aR SAA AA Reems
Side mrfse nieRS ufenrer
Ue wre deded md deans UR Ae Uae ufone
WREA Z wieeacen UAL Rata. SARs fenrs |
Ihe wdte niere URLS Ae, ufenre |
fiz reser me we ar were & Reh ALAAAaA de
AeA an RE A Ae
we Gu Be der mene’ Gu ye onfscs | Gu es Roars RAS dur aoe
Wa afar ni afore ydes URaz)
We Hist: Ser mens / Ser mers Ue AR Ae! AAT
Foe A. os TS!
fran tiers febadtes oat: Edtarg!
Re or or Ray Bde fem Hanah aT RAIA A Rev nese oer
fez Raaos 3 fe ur mien fimen Uae seest fmt
Qu fes Rercere 3 ifr Ber rene Sheth at Sas fru
We ganic rela Qu relsamidis Rass ULAR RE/ Ut ARAL ATR
Gu rise ¢ Ast Ulan MOL Ase ST
afttacer ufemrs
We feat & ahi Os orien a Aen SLs ufenrer
uafea fo8HS mene/ay neHa/AoTs, URUL Ate fener
aust Fase UT AAA, ufenrer |
Qu afr ferret St. ufemreri
elsa/Greaarie,66 aa. afer Hm, wee & 8-2, Bandons odor 31
Poet
Am = Bh —
maa oa