COMMISSIONING REPORT
Manufacturer:
Address:
Telephone:
Telefax:
Customer:
Customer Address:
Contact Person:
Telephone:
Mobile phone:
Fax:
Email:
Commissioning Report - 1
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
1 Transportation
General:
Arrival date of the machine:
Inspection date and location:
Signature of consignee:
Open box inspection:
no
yes, done by
Packing list:
no
Machine:
no
Package:
no
Accessories:
no
no
Photographed:
no
yes, date:
no
yes, to whom:
date:
no
yes, to whom:
date:
no
yes, to whom:
date:
Damages:
Method of Transportation:
Railway
Other:
Airfreight
Truck
Shipped by M/S____________
Comments:
Commissioning Report - 2
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
2 Storage
General:
Storage:
no
no
yes
outdoors
in packing case
Humidity:______%
Damages:
Transportation package is ventilated:
no
yes
no
yes, type:__________________________________________
no
no
no
yes, type:__________________________________________
no
no
yes
no
no
no
yes, location:_______________________________________
Comments:
Commissioning Report - 3
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
3 Mechanical Installation
Foundation is checked according to machine
drawing:
no
no
yes
2_____________
3_____________
4_____________
A
2
4
C
A_____________
B_____________
C_____________
D_____________
Crankshaft deflection is checked:
no
yes
no
Bolt lubrication:
dry
oil,
no
yes
no
yes
MoS2
Commissioning Report - 4
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
4 Lubrication check
Grease:
The grease quality is the same as
recommended on the lubrication plate:
The first greasing has been done:
yes
Date:_______________ Quantity:________ g
Comments:
Commissioning Report - 5
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
5 Electrical installation
Network variation:
Space heater operation:
no
no
manual
automatic, controlled
by:____________________
Space heater:
Temperature detectors:
__________
__________
__________
__________
__________
__________
__________
__________
__________
__________
Space heater:
__________
Commissioning Report - 6
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
_______________A_______________ s
_______________A_______________ s
Overvoltage setting:
no
yes, setting:
no
yes, setting:
no
yes, setting:
no
yes, setting:
Vibration monitoring:
no
- in stator winding
no
- in bearing
no
- in ________________________
no
no
yes, type:
Temperature monitoring:
Commissioning Report - 7
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
7 Test Run
7.1 First start (a few seconds only)
Direction of rotation (viewed from D-end):
CW
no
CCW
yes, from:
no
yes, from:
no
yes, where/how:
Running:
machine run OK
Stator
D-end
N-end
D-end
mm/s
N-end
mm/s
Current
Power
Factor
Excit.
Current
rms
rms
cos
h:min
0:00
0:05
0:10
0:15
0:20
Comments:
Observations:
Commissioning Report - 8
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
h:min
Stator
D-end
N-end
D-end
mm/s
N-end
mm/s
Current
Power
Factor
Excit.
Current
rms
rms
cos
0:00
no
yes, from:
__________ s.
Comments:
Commissioning Report - 9
Synchronous Machine A M G / A M Z
jne.
9 Machine approval
Machine approved for use
Date:
Commissioning Report - 10
Comissioning report
Serial no.
ABB Ref.
June 2009
Project:
From:
Fax number:
Phone number:
Email:
Number of Pages:
1 + 9 + _________
Message:
Commissioning Report - 11