You are on page 1of 10
eBtSEFN GE-ELACPEYGUPPORT TEANY eto rie vamoz avg Sees = es 21012373 WuNG LOW Somers LY == on I 96 52 FERM CE-EUROPEFSLERCRT TEE Pea DisoFnaTiMax vision O ms 12.20.08 FR Berray 11, Heat Balance Data, Tamb=60F, Distillate, 1GT/HRSG Mex Fired to 1400F WST, GT at Besetoad, LP Economizer bypessed Eatimated conditions for a STAG 209FA untat ho stete polrts Indicated on the heat balarice diagram. Poremeter Units Mass Flow Rate 10S Iofhr Pres.re psa ‘Temperature F Enthaloy Bury Heat Coneumption 10°6 Bute Relative Humicity % 11.3.1 Alrand Gas Turbine Exhaust Gas Relative Flow Pressure Temp Humidity G1 Ambient Air 49009 14.53 0 0 2 Compressor iniet 49669 14,39 a G3 Gas Tune Exhaust 52069 14931090 G —HASG Inet 6206.9 = 4,088 GS HRSG Stack 5393 1453 (ary 41.82 Fuel Heat Heat Input input Flow = LHV HHV FI Plant Fuel Supply 1686 31284 aise F2 Gas Turbine Ful Supply 1953 25105 26607 Fa HRSG Fuel Supply 3 8178 as WARD: 156 OS: 36H GE-EURCRESSLEPORT TEAM 11.83 Stoam HPSH GE/Bechta inte'sce" ‘Steam Turbine Throtte HP Turbine Exhaust (PSH GE/Bechtal interlace" Reheater inlet (GE/echtal) Rheatar Eset (GE/Bacrie) JP Turbine inlet LPSH GE/Bechtal tniertaga’ Steam Turbine LP Admission $10 Steam Ture Exraust S11 Seals & Misc 10 Corcenser S12 ‘Condenser Sparging S13 LP Drum Pegging * Includes Flow Element BRABREBRD 11.0.4 Water Condenser Hotwall Feoowater Maks-up Condensate Pump Suction ‘Condensats Pump Discharge LP Econ Bypasa Valve Init Transfer Purp Suction ‘Transter Pump IP Bleed ‘Transfer Pump HP Discharge Main Steam Attemperation WI0 Reheat Steam Atorperation W11 HP Drum Blowdown Wi2_ (P Drum Blowdown W13 Condenser Cooling Water In W14 Cordenser Cootng Wats’ Out W18 Gas Turbine Water Ir W16_ HP Economizer inte WI7 IP Economizer iniet”* ‘Wi8 LP Flow entering LP Drum SSSSHERS 1,070.04 00 1,079.04 1,070.04 4,079.04 1,184.95 3.84 1,000.51 ata 24.78 200 0.00 5886 85,506 199.03 102837 69.07 107904 ** Downstream of Feedwater Contiol Valve Pana ose ose a5 DSIEOTMAX Reviion Doe: 2.20 96 FC Boney Temp Enthalpy 1005 4,097 1001 1,607 665 14,9503 87 13018 67 1.468 jooe 1,884 1000 1,827.4 D 1046.0 - 7186 659 1,947.4 Temp Enthalpy 488 © 485 231 a7 28 B30 aa 6 308 7% 433 7 987 28 2a92 ao 98 6B 53 96 SESEPN GE-EUROPEHSLPPORRT. EH Ps DIBENGTIMAK eviond Oa 0020008 PK Berney 12, Heat Balance Data, Tamtsx86F, Distilate, 1GT/HRSG Max Fired 10 1400F wIST, GT at Baseload, LP Economizer bypassed Eciimaled concitons fora STAG Z08FA unt at the state points Ircdloated cn the heat balance ciagrern, Parereter Units (ass Fow Rate 1076 Inne Pressure pela Temperature F Entalpy Btu Heat Consumption 106 Bt elative Hurnicity % 123.1 alt ang Ges Turbine Exnaust Gas Relative Flow Pressure Temp Humidity G1 Ambignt Air 44851 14.858 % 8 2 Compresso Inet 44851 1438 & G3 Gos Turbire Exhaust 47863 1485 1497 G4 HASG inet 47553 21886 GS HRSG Stack 4747 1453275 128.2 Fuel Heat Hest Ingut Input Flow LHV HHV Fi Rant Fuel Supply 4489 27508 29184 F2 Gas Tursine Fuel Surply 1188 22058 2807.8 3 HRSG Fuel Supply 24 45ST rar a "96 (E:99PH GE-CLRORE-SUPPORT TERY 12.9.3 Stam SQV ZBS4GALBe? HPSH GE/Bechtel Intertace’ Steam Turbine Theotle HP Tube Exhaust IPSH GE/Bechie! Interfaca” Reeheato Inlet (GE/Bocrtel) Reheat Ext (@E/Bectie IP Turbine iniet LPSH GE/Bechtol Interface" ‘Stearn Turbine LP Admission Steam Tutine Exhaust ‘Seais & Misc to Condenser Condenser Sparging LP Drum Pegging * Includes Flow Elernent 1234 Water wi we wW3. wa Ws Condenser Hotwell Feedwater Make-Up ‘Condensate Pump Suction Condensate Pump Diecharge LP Econ Bypass VaNe Inlet ‘Transfer Pump Suction Traneor Pump IP Blood ‘Tranter Pump HP Discharge Main Steam Atemparaion Heheat Steam Attemperation HP Drum Blowdown: (P Drum Blowdown Condenser Ceoling Water In Condensat Cooling Water Out Gas Turbine Water Injecton HP Economizer Inlet** IP Economizer Inlet" LP Flow entering LP Drum Flow Pressure, 1,008.11 1,008.11 901.99 0.63 970.08 101213 401248 000 0.00 1,025.65 260 90 814 Flow 1,028.26 100 1,023.26 1,02826 1,028.26 110.79 101.68 4,008.11 9413, 4145, 0,00 0.90 85,888 65,996 10026 913.98 60. 1,028.26 ++ Downstraem af Feadwatar Control Vaive Pan? 4,068 1,024 208 234 aa uw cd 1,285 ee aBbBes, Temp 4,006 1,001 873 568 se 1,002 +000 105, 688 Temp 105 105 BB 388 2B DMSENGTAMAX asiaion 0 Date: 2.256 FKBamey Enthelpy 16083 1,605 41,9853 1,2077 41,9515 4,287 18277 4,062.7 7194 41,9820 Enthalpy 2333 PRR 21°96 aSiS5M GE-ELROPE-SUPRORT TERN Diagram 2: Load Rejection Scenario HP Feed, wig rR a: 86 GB: SEPN GE-CUROF 3 Indicated on the heat balance diagram LPPORT TEAM Heat Balance Data, Temb=S0F, Distilate, ST Down, 2.GT's at Baseioad, LP Economizer Bypassed Estimated conditions for a STAG 209FA unit at the state points Parameter Mass Fiow ete Preaaure Temperature Ertnaipy Heat Conumplion Relative Humility Units 103 tyr pea F Brwib 10°6 Btuhr % 33.1 Alrand Gas Turbine Exhaust Gao eeeRe asz Ambient Air ‘Compressor init Gas Tubine Exhaust HASG init HRSG Stax Foal Plant Fuel Supply Gas Turbine Fuel Supply HASG Fue Supply 4,086.9 4,966.8 5208.0 5298.8 6200.9 Frow 2707 1853 ° 14.63 14.39 14.98 16.53 Heat Input LHV 8021.0 25105 ° OSCFLDAY fevaien¢ ‘Dete: 0301-06 FkEoray Relative Temp Humidity a co) Ey 1,080 1,088 285 ‘Heat Input HAY 5821.4 28807 ner 03 196 GEGEN GE-CUROPESLEPCRT TEA 333 Steen Flow. Pressure St HPSHGE/Bechtel interface’ 617.09 1,985 2 Steem Turbine Throtto coo 3 HP Turbine Exhaust 0000 4 IPSH.GE/Bachtel Intortaco® 10283385 $5 Reheater inlet (GE/Bectiel) 7091873 $8 Reneatar Ex (GE/Bechte)) me 369 §7 IP Turbine iniat 0000 &B LPGHGEDechtel Interface” 000 2 Steam Turbine LP Admission 0.00 $10 Steen Tutbine Exhaust 2.00 S11 Seals & Misc to Condenser ooo S12 Condenser Sparging 0.00 ts S18 (P Dnum Paging R70 373 S14 HP Dump Aller Atlemperation 7284 878 S16 Reheat Cump to Condenser 1,088.18 B * Inoludes Flow Element 394 Water Flow Pressure Wt Condenser Hetwell 200832 1.95 W2 Feedwater Make-up 09 W3_ Condensate Pump Suction 206832 1.85 W4 Condensate Purrp Discharge 2,066.32 WS LP Econ Bypass Vave Inlet 790.91 We Transfer Purp Sucton 50588 59 W? Transtar Purp IP Bleed 10283 WS Trarefer Pump HP Discharge 7284 WS Main Steam Aitenperation 0.00 WI. Reheat Steam Atomperation 0.00 W11_ HP Drum Blowdown ao Wi2_ IP Drum Blowdown a0 0 W13_ Conderser Cooling Water In 25886 2 Wi4 Condenser Cocting Water Out 25.886 # W15_ Gas Turbine Water injection 198.93 250 WIG HP Excromizer Iniet™* 617.09 1,435 W17_ IP Economizar Inlot”* 10283383 Wi LP Flowr entering LP Drum 5.86 % W183 HP Dump Attamperation 8675 2253 W20 Reheat Dump Atemporation 23325334 ** Downstream of Faeawater Control Valve Panes Temp Enthelpy 998 14042 5631 286.8 ea 13333 9218149 a 1403 655 10402 a3 s02 Temp Enthalpy 12 799 "200 79 251 98 m4 aoe tor a7 7 a7 7 NR 2632380 2-799 268 OA Wt 79 ra a 99 USEAZEN GE-CUROPESSLPPORT TEAM 4 Heat Batance Data, Tamb=S5F, Distilate, ST Down, 2GTTs at Baseload, LP Economizer Bypassed Estimated condtione for a STAG 209FA unit atthe stale points indicated on the heat balance dagram. Parameter Units Mass Fow Rate 503 hr Pressure pela Temperature i Enthaloy Bulb Heat Consumption 108 Btwhr Relative Humicity % 481 dirandGae Turbine Exhauet Gee BLRRe aaz ‘Ambient Air Compreseor Inlet Gas Turine Exhaust HASG Inet HRSG Stack Fuel Pant Fuel Supply Gas Turbine Fust Supply HRSG Fuel Supply Flow Pressure 44981 1459 485.1 1489 47553 14.85 47559 : 47553 1489 Heat Input Flow Li ware 4dis.0 1188 22055 0 Peat 0 DosFLORL Revacno ete: 03.01.08 FxBoaney Relative ‘Temp Humidity 95 8 1137 1,135 Hoot Input HAV 46749 23975 WER G1 ’9E OS! 49PM GE-ELROPEYSLEFCRT TER 438 Steam HPSH GE/Bechtel Intertace* Steam Turbine Throtle HP Turbine Exhaust IPSH GE/Bechtel Itertace* Rioheater niet (GE/Bactta!) Reheatar Ext (GEBectel) (P Turaine Inet LPSH Ge/Becrte! inortacot ‘Sleam Turbine LP Admission Steam Turbine Exraust ‘Seals & Misc to Condenser Condenser Sparging ‘LP Drum Pegging HP Oump afer Atlemperation Rsheat Dump to Condenser Includes Flow Element Water Condeneer Hotwel Feodwater Make-up Condensate Pump Suction ‘Condensate Pump Dscherge LE Econ Bypass Valve inet Transter Pump Sucton Traneler Pump IP Blood “Traneter Pump HP Diecharge Main Steam Attemperatton W10 Reheat Siam Attermperation Wit HP Drum Blowdown Wi2. IP Drum Blowdown 13. Condenser Cooing Water In Wi4 Condensar Cooing Water Out W158. Gas Turbine Water injection W16 HP Economizer inlet” WIT IP Economizer inlet W18 LP Flow entering LP Drum Wig HP Dump Attemporation 20. Refiea! Dump Atlerperation BREEBRLLBA QQRQag RSBRS e SS555E552 OREFLORY Feviion 0 Dats 30-66 Flow Pressure Temp Enthalpy 608.48 0.90 9.09 0.41 TANS TH4A3 0,00 0,00 0.00 000 1.00 Cea 1,011.63, 2023.26 0.00 2,028.26 2023.26 TAS 776.13 0041 634.71 9086 0.00 000 0.00 85,886 85.888 10028 56762 9041 775.53 9825 237.50 ** Downstream of Feeawater Control Valve Pap 1,287 “aay 2289 4,005 Sga-: B8g°0° °° Temp 190 190 met "8 SBRase' Be 11900 enthalpy 984 984 2330

You might also like