You are on page 1of 1

Henali Ramji

Production Log Storyboard,


Script, Recce
During week 9, we had started to make the storyboard, script and recce.
As there were lots to do, we decided to divide the work between the four
of us so we all got an equal chance to take part in everything. During our
discussion, we decided that I and Farzin will work on the script as we were
good at writing and Anbish and Evelina worked on the storyboard as they
had good drawing skills and creative minds. We sat down together and
decided what we wanted each picture on the storyboard to look like as
well as the information that will be included in the script.
I and Farzin divided our work into half, which meant that she did the top
part of the script whereas I did the bottom of the script and then I proof
read and checked it again to make sure that everything made sensed and
followed the conventions of a script.
Whoever finished their part of the task first worked on the Recce however,
during our discussion we all decided the places we were going to choose
for our production. As me and Anbish were still working on the storyboard
and script, Evelina and Farzin went to the different locations and took
pictures of them. This way we used our time wisely as we had enough
time to complete all work on time.
While doing the script, I did get confused as I wasnt clear about the
conventions in the script therefore I asked my colleague Farzin to help me
solve my problem. With the help of group members, we worked as a team
and became a support for one another.

You might also like