During week 13, we started to film our main production. This was the most stressful and tensed week as we had to complete everything on time without anything avoiding us from filming. However, we came across many weather issues. Due to this, we couldnt film as firstly, we had to follow our script and storyboard which had nothing to do with rain, secondly the ramps and location was completely wet which prevented us from filming. As we done a risk assessment, we had to make sure of the different hazards and cautions during our filming. Taking this in account, we decided to stay safe and not film on rainy days as this could be extremely dangerous for the character if he skated on wet ramps. We also had problems of group member coming in late, not turning up and being ill. In addition to this, the character also never turned up which was very stressful as he was the main character in the production. This went on for a day and two, but then we decided to talk everything out and try and get everything done so that we didnt waste our time unnecessarily. Due to this, we all worked as a group and supported one another with problems that we came across. I helped out with filming the behind scenes as the group was setting up and discussing the different camera shots and angles. This showed the progress for our work and production.