Contractor's ‘wsoure ‘egies
Submission Form ranean coe
Our Ret 2saicsrENVRST4- ROO CSERR
12.86p.2014
Contact: HY/2009110~ Contral.tan Chal Bypass ~Cotral Interchange
Tox Einar s Representative, The Chie Resident ngioer Mr, David Kan
ie of Submission: von Management Pn Re. 47-Sptmbr 2018)
Spuccaon: CC. Cae 4, PS. Claes 1160) 1.1204), 11208).
ie ar pleased o sbi th fllonng for our vie and comment
Desert
‘Twohard cpa oe pane fh Eonar Maregemert Pan fr Sela 204 ar Wo seas
cos Wer ms
£ Forest Tot Quan of CAD sero be Generated oth Conrac. ant
{Summary Tal or eof Teter Taperay We ust 2016,
rT
Ditton DS.
Prepare by: PonyContractor's
Submission Form
ur Ref H2SICSFENVIORSTA ROD
ate: 12Sep-2014
Contract: HY/2009148~ Centra Wan Chal Bypaes -Conral Interchange
To gina Representative, The Chief Reient Engineer Mr David Kan
ite of Submission: Envronrclal Manage Pn (Rv 47 - Sete 20)
Soncteaton: SCC.Clmse M.S, Chane 1114), 11204, 11208), 1121
Were pleased sbi the folloning for your review and comment
‘Deserts
1rd ois he ude pa ft Even Management Pan x Salambe 2014 an cones in
22 ern Sunmary Wala Pl Tate fr 204
4 Saenry Tabfr Un of Taner in Toporn Weis inst 20)
Purpose ot Submission: For Poser
Dat: 125892016
Prepared by: PonyTete
Feed eran cat MN EAE}
Cerne ny eee MCU
NT MUCUTe Enea aa oy
Cr eee)
Reviewed by:
Approved by:
International experien45 | os,uyta | Penny via | Lighting Chan | Desmond Szo_ | Appendons 12,15, 16
46 | o7Augta | Penny Yiu | Lighting Chan | Desmond Sze. | Appendions 12,18, 18
at | orseors | romani) | uiohinacnan | exonasas | MH¥ereers)
Th plan tho roar of Laghton Conacars (a) Utes and aya be oni,
sited or ned wit he ron conor Ligh Cntr (AS) inoContract No. HY/2009/18
ro Cee en nd
Eaten eee
Contents
‘About this Document.
Contents,
Part A - Environmental Management System
Introduction.
Environmental Poicy and Objectives.
Organisational Structure for Environmental Management
Environmental Management System Documentation.
Environmental Training and Awareness:
Legal and Other Requirements, Environmental Licences and Permits,
General Communications and Promotion.
Performance Monitoring
Environmental Reporting
40. Performance Review
11 General Requirements for Nuisance Abatement and Pollution Control
42. Environmental Emergency Procedures
Part B — Nuisance Abatement and Pollution Control.
13. Air Pollution Abatement
414 Alr- Borne Noise Pollution Abatement.
15 Water Pollution Abatement.
16 Protection of Ecological Resources.
17 Landscape Preservation and Visual impacts
18 Archaeological and Historical Resources.
49. Land Contamination.
20. Chemicals Management.
21. Energy Use.
Part C - Waste Management
22. Waste Management.
Part D - Environmental Records.
23 Environmental Records
Part E ~ Glossary of Terms.
24 Glossary of Terms.
Part F ~ Appendices,
‘Appendix 1 Project Environmental Management Organigram.
‘Appendix 2 ECP 1 Air Pollution Abatement.
‘Appendix 3 ECP 2 Airborne Noise Pollution Abatement
‘Appendix 4 ECP 3 Water Pollution Abatement
‘Appendix § ECP 4 Protection of Nearby Environment and Use of Resources.
‘Appendix 6 EGP 5 Landscape Preservation and Visual Impacts
‘Appendix 7 EGP 6 Land Contamination.
‘Appendix 8 EGP 7 Waste Management.
‘Appendix 9 In-house Environmental Rules.
‘Appendix 10 Programme and Topics for Environmental Tool Box Tall
fonts oud zo onaarn ls Chath Srna TaeContract No. HY/2009/18
Leighton Caer
‘Appendix 17 Sample Proforma for Recording : 108
Lict of Tabloe.
‘Table 2-1 Leighton Environmental Objectives and Targets. 6
‘Table 3+ Leighton Contractors (Asia) Limited - Key Environmental Personnel 8
‘Table 3-2 Subcontractor Details and Environmental Representative. 8
Table 4-1 Environmental Management System Documentation 18
Table 4-2 Applicable Good Practice Guidelines. 19
‘Table 4-3 Environmental Management System — Company Forms. 19
‘Table 6-1 Training and Awareness Programme. 23
Table 6-1 Project Specific Constraints 26
‘Table 6-2 Applicable Licences and Permits 27
Table 11-1 Summary of Activities with Potential to Cause Pollution “1
Table 12-1 Storage of Hazardous Material 45
Table 13-1 Alr Sensitive Receivers 55
‘Table 13-2 Air Pollution Corrective Actions. 60
‘Table 13-3 Air Pollution Preventive Actions 60
Table 14-1 Airborne Noise Sensitive Receivers 63
Table 14-2 Air-bome Noise Corrective Actions 67
Table 14-3 Airborne Noise Preventive Actions. 68
Table 15-1 Weter Sensitive Receivers. n
Table 15-2 Weter Pollution Corrective Actions. %
Table 15-3 Water Pollution Preventive Actions 75
Table 17-1 Landscape and Visual Impacts Corrective Action 78
Table 17-2 Landscape- and Visualmpacts Preventive Action 5 79
Table 22-1 Waste Generation: Proposed Mitigation . 88
Table 22-2 Summary of Activities Producing Surplus Material 89
Table 22-3 Estimated Waste Generation 90
Table 22-4 Segregation and Sorting of Waste 97
Table 22-5 Designated Disposal/Re-uselRecycling Outlets. - 99
Table 22-6 Waste Management Corrective Actions - 402
Table 22-7 Waste Management Preventive Action - 103
Table 23-1 Environmental Filing System, 105
Table 23-2 Training Records Maintenance 408
List of Figures
Figure 2.1: Environmental Policy (English). - 4
Figure 2.2: Environmental Policy (Chinese) 5
Figure 13.1: Dus’Smoke Screen 56ontract No. HY/2000/18
eI Me eter Tc)
Petia ees
Focused on
siete
ronEine Merve,
7 supers amare | mga | nce | ag
H “due, pepuedsns
ane Ses a=o=ae
GYOoaY ONIMOLINOW ALI¥ND Waly,atu) | onsen? | Bupeers| runos{S2unoe
suewoy teget | (coment
IIA
Tron yeeus [SOT ROIS SOWBUTITTURSAS -qog 61242810
G@YOoTY ONMOLINOW ALT¥ND waLyM
‘SBS TERURD = BO
euieo0z AH wounedeg skenbiH
Poo)ood 1
(eampuoung9000)
anoPO.
(su) | (onsen)
SuEWEX | goo | 110 sIaI8IA fal
Toon yous
G¥OOSY ONTHOLINOW ALITVND YALYM
‘TeV TENE = BNO.
‘ie002/AH wounsedeg sAemy6iHaz YN, 3 Ei wean z
a a 5 Toe Gennes wz
Tr WH § the et
¥ YN ze $.0e BOUSGH
ro)
BuIpeEL | jenn di semiouncjeey)
ewe cous Soy | “roe sp11os awa
ues | ve ‘duo. PO | pepuedsns
Ton weus TERS TER TERT OURENS 04 o6:ey>910
GYOo3Y ONIYOLINOW ALTWND waLWM
"SBR AUS = GMD
s1/e002/AH woursedeq sAembiH
arse senue9- GALINIT (¥is¥) $YO19¥UANOD NOLHOLSTElue Menuer 62
se Nl z 3.02 0000 87
Bupeoy o i ‘wun
suewe UIPERR | (einen a pantern) | OORRHRMC) | SpHIOS awa
aa Hd ‘dive. 3nePO | pepuadsng
Ton woous T9BTS HNO TEM qwlod 261249810
G@YOoTY ONRIOLINOW ALM¥ND ¥aLvM.
SETI EAU = BMD
eu/e00z/AH wouredeg sAeny6iH
‘ore2n wenue9 - BLINN (vIS¥) S401 9VXNOD NOLHOFSrE
Cee re eer ee ry
Pate eeeLeightonPor
Pere Cee Ne reece cc
Patient escentzertvsa
Tee vysa er 6002" AH
Woo3y
oo
‘ooo [00 =
ea0 0000 co 0000 | areca | wore OE ro
729680.
aus
‘ieded
muon
“aguow pawsousp eoiwem C¥D10 soaRUEND ENEY |
‘PERE SHEA 19) ae] mo aise Kang MH
Pon ol"ee vse Wr" o02" AH
noosy
(oro oe)
wy
pesodeg
5
esw30,err
Leighton ene nen na
Environmental Management Plan
Local knowledge Focused onovepnoe Biggs pa maya} mE YA BNR A FaOW NEHA SoNUEUS ow LPC SRS ORE Cea sa)
en ooo
nj 210 pedo feu ee Yom oun ema HH VoRTIRIED Kd Aen] oqu ub Sux YOK FERN MIRAI ou) MN
= es soquu so guenp paewines OL
spose aut, Bup.ouco poe vopee WoRIO) mA o
ay (Gupeen | (uu) pesn au, | sp0q uosannste5 Raerodwoy
2 -seugueno femay| so sennuen ve3 | ul zoquny Burs 30) suoneoURETE
rrr = ese SIRT
zr asnv19 sa)
yer xIONSdd¥