PROJECT /

PROPOSED (...+...+...) FLOORS


... BUILDING.

LOCATION \
... - . - QATAR

OWNER \

CONSULTING \

GCG
GULF CONSULTING GROUP


PLUMPING Calculation Sheet

Estamited Water Requirement


Office building

Total Area of Floors


Gallon Per Day Per Capita
Hour Per Day Usage
Peak Flow Rate

=
=
=
=

37038 m2
Gallon
20
Hours
9
2.5 X Average flow Rate

No. of Person
Daily Consumption
Average Flow Rate
Peak Flow Rate

=
=
=
=

4001
80020
149
372.5

Total Area of Floors


Gallon Per Day Per Capita
Hour Per Day Usage
Peak Flow Rate

=
=
=
=

37038 m2
Gallon
25
Hours
9
2.5 X Average flow Rate

No. of Person
Daily Consumption
Average Flow Rate
Peak Flow Rate

=
=
=
=

Person
Gallon
Gpm
Gpm

Resturant building

4001
100025
186
465

Person
Gallon
Gpm
Gpm

Appartement House

No of Bed Rooms
Gallon Per Day Per Capita
Hour Per Day Usage
Peak Flow Rate

=
=
=
=

No. of Person
Daily Consumption
Average Flow Rate
Peak Flow Rate

=
=
=
=

1750
Room
Gallon
100
Hours
15
3.0 X Average flow Rate
1000
100000
112
336

Person
Gallon
Gpm
Gpm

Hotels

No of Suit
Gallon Per Day Per Capita
Hour Per Day Usage
Peak Flow Rate

=
=
=
=

No. of Person
Daily Consumption
Average Flow Rate
Peak Flow Rate

=
=
=
=

1750
Suit
Gallon
130
Hours
11
3.0 X Average flow Rate
1000
130000
197
591

Person
Gallon
Gpm
Gpm

Hospitals

No. of Bed
Consumption per year
Consumption per month
Peak Hourly Flow
Minimum hourly flow
Peak Installatin flow
Consumption per day
Average Installatin flow

=
500
Bed
= 50000000 Gal/year
= 5000000 Gal/month
= 15000 Gal/hour
=
Gal/hour
1500
=
Gpm
500
= 150000 Gal/day
=
Gpm
250

University

Dormitory Student (Resedential)


Area of Capita
No. of Students
Fixture
Water closet
Shower
Washup
Miscellaneous

=
=
Usage /Day
3
1
2

9650
1043

m2
Student

Gal/ Usage
5
20
10

Total
Kitchen and Resturant
Area of Capita
No. of Students
NO of Meals per Day
Assume Gal/meal / Capita
Total

=
=
=
=
=

9650
1043
3
2
6258

m2
Student
Meal
Gallon
Gallon

=
=

9650
1043

m2
Student

Gal/ Usage
15
20
20
20
78225

Non-Residential Student
Area of Capita
No. of Students
Fixture
Water closet
Washup
Miscellaneous

Usage /Day
2
2

Gal/ Usage
5
5

Total

Gal/ Usage
10
10
5
25

Faculty and Staf


Area of Capita
No. of Staf
Fixture

=
=
Usage /Day

9650
1043

m2
Staf

Gal/ Usage

Gal/ Usage

Water closet
Washup
Miscellaneous

2
2

5
5

10
10
5
26075

Gal/ Usage
10

Gal/ Usage
100

Total
General Laboratory use
No. of Fixture
10

Usage Hour /Day


1

General Kitchen
Area of Capita
No. of Students
NO of Meals per Day
Assume Gal/meal / Capita
Total

=
=
=
=
=

9650
1043
2
2
4172

m2
Student
Meal
Gallon
Gallon

Gym
No. of Showers
10

Usage /Day
8

Gal/ Usage
4

Get All University Water Demand Per Day

Gal/ Usage
1600

123511.3 Gallon

Shopping Centers

Area of Capita
Domestic Water Consumption
Average Flow Rate
Peak Flow Rate

= 46296
= 49999.68
= 83.3328
= 166.6656

m2
Gallon
Gpm
Gpm

Parking and Pouplation Methods


No. of Parking Space
Approximae Customer /day
Water Consumption per Coustmure
Domestic Water Consumption
No. of Empolyee
Water Consumption per Coustmure
Domestic Water Consumption
Total load

=
=
=
=
=
=
=

4000
24000
1.25
30000

Space
Customer
Gallon/day
Gallon

800
20
16000

Empolyee
Gallon/day
Gallon

= Empolyee load + Coustumer Load


1.1*(
30000
+
16000

Average Flow Rate


Peak Flow Rate

=
=

85
170

)=
Gpm
Gpm

50600

Court Houses And Detention Jails

Occupancey

Population
200
2000
1000
1000

No. of Staf
Office Personnel
Short Term Detainess ( prisoners)
Long Term Detainess ( prisoners)
TOTAL
Flow Rate
Staf
Office
Short Term
Long Term

Peak Flow Rate

4000
40000
10000
80000
Average
208.5

/
480
/
480
/
360
/
900
Flow Rate
X

GPDC
20
20
10
80

Total GPD
4000
40000
10000
80000
134000

min
min
min
min

=
=
=
=

417

Gal/ Usage
15
20
20
20
78225

Gal/ Usage
10
10
5
25

Gal/ Usage

10
10
5
26075

Gal/ Usage
100

Gal/ Usage
1600

Gallon

8.4
83.4
27.8
88.9
208.5
Gpm

Building Specification :
Building Lowest point level (Ground Tank Place)
Building Highest point level (Roof Tank Place)
So get total building height (static head)
No. of Basement Floor
Non. Typical Floor Levels
No. of Typical Floor in Building
Last Floor in Building
Befor Last Floor in Building
2 Floor Befor Last in Building
Get Total Building Floor
Roof Area
Site Plan Area
Total Land Area
For residential :
No. of bed room in the building :
No. of person in the room :
No of person
Assume daily water consumption in L/s/person
Then the total water consumption of building

0
116
116

m
m
m

2
15
5
1
1
1
25
250
800
1050

Basement
Floor
Floor
Floor
Floor
Floor
Floor
m2
m2
m2

100
2
200
180
36

Bed room
Person
Person
L/day
m3

For commercial center:daily water consumption = total area of all commercial floors / 10 m2 per person
* daily water consumption per person
Assumption daily consumption per person in liter/day
70
L/Day/Person
Area of total commercial floors
0
m2
Daily water consumption
0
m3
For Office Building 8 Hour Shift :NO. of Person
assume daily water consumption in L/s/person
Daily water consumption

0
60
0

Person
L/day
m3

For Factories 7 Hour Shift :NO. of Person


assume daily water consumption in L/s/person
Daily water consumption

0
60
0

Person
L/day
m3

For Hotels up to 3 Stars :NO. of room


Assume daily water consumption in L/room
Daily water consumption

0
170
0

room
L/room
m3

For Hotels up to 4 Stars With All Services :NO. of rooms


Assume daily water consumption in L/room
Daily water consumption

0
700
0

room
L/room
m3

For Hotels up to 5 Stars With All Services :NO. of rooms

room

Assume daily water consumption in L/room


Daily water consumption

1200
0

L/room
m3

For Car Parking :NO. of cars


Assume daily water consumption in L/car
Daily water consumption

0
30
0

car
L/car
m3

For Restaurant and Cafes Per Meal :NO. of Person


Assumed no. of meal per person
Assume daily water consumption in L/s/meal
Daily water consumption

0
1
30
0

Person
meal
L/meal
m3

For Laundry in Hotels Per Bed :NO. of Bed


Assume daily water consumption in L/bed
Daily water consumption

0
130
0

Bed
L/bed
m3

For Laundry in Hospital Per Bed :NO. of Bed


Assume daily water consumption in L/bed
Daily water consumption

0
600
0

Bed
L/bed
m3

For School :NO. of Student


Assume daily water consumption in L/student
Daily water consumption

0
75
0

Student
L/student/day
m3

For Airport :NO. of Passenger Per Day


Assume daily water consumption in L/passenger
Daily water consumption

0
20
0

Passenger
L/passenger/day
m3

For Meeting Area :NO. of person


Assume daily water consumption in L/person
Daily water consumption

0
10
0

Person
L/person/day
m3

For Public Building :NO. of person


Assume daily water consumption in L/person
Daily water consumption

0
50
0

Person
L/person/day
m3

For Camps :NO. of person


Assume daily water consumption in L/person
Daily water consumption

0
75
0

Person
L/person/day
m3

Person

For Swimming Pools & Shore :NO. of person

Assume daily water consumption in L/person


Daily water consumption

40
0

L/person/day
m3

For Mosque :NO. of person


Assume daily water consumption in L/person
Daily water consumption

0
30
0

Person
L/person/day
m3

For Public Toilet Per Unit :NO. of toilet Unit


Assume daily water consumption in L/toilet
Daily water consumption

0
120
0

Unit
L/toilet
m3

For Public Urinal :NO. of urinal


Assume daily water consumption in L/urinal
Daily water consumption

0
40
0

urinal
L/urinal
m3

For Public Lavatory :NO. of Lavatory


Assume daily water consumption in L/Lavatory
Daily water consumption

0
60
0

Lavatory
L/lavatory
m3

For Public Shower :NO. of showers


Assume daily water consumption in L/shower
Daily water consumption

0
560
0

Lavatory
L/shower
m3

For Public Slaughterhouse :NO. of Caw


Assume daily water consumption in L/caw
Daily water consumption

0
400
0

Caw
L/caw
m3

0
35
0

kg
L/kg
m3

0
0
0
0
0
0
0
0
0

caw
calf
goat & sheep
horses
Chicken
Chicken
duck
Camel
m3

For Commercial Laundry Per Kg of Clothes :NO. of Kg


Assume daily water consumption in L/kg
Daily water consumption
For Farms :No. of Caws
No. of Calf
No. of goats & sheep
No. of horses
No. of egg Chicken
No. of turkey Chicken
No. of ducks
No. of camel
Daily water consumption

Irrigation water consumption calculations


water consumption for irrigation changed according to kind of planters exists
No. of palm trees
1
No. of spreading
1
No of evergreen
1
No. of Shrubs
1
No. of Ordinary Trees
1
Area of grass
1
Area of Gr.Cover
1
get daily water consumption for irrigation
0.33
OR
Insert Total Green Area for The Building
350
2
Assume 1.5 cm of water per 1 m
Daily water consumption
5.25
Total water consumption :water consumption per day for the building

36

Unit
Unit
Unit
Unit
Unit
m2
m2
m3
m2
m3

m3

Daily Domestic Water Consumption :water consumption per day for the building

36

m3

Daily Irrigation Water Consumption:water consumption per day for the building

5.3

m3

41.3
45.5

m3
m3

91

m3

45.5

m3

Total Daily Water Consumption For the Building :total consumption of water per day
muliplay the water consumption in 10% safety factor
Under Ground or Ground Water Tank
the storage capacity for 2 days
Roof Water Tank Capacity
the storage will be for 1 day

We have 2 Possible Way to Calculate Sizing of Septic Tank


Proposed No.1
Assumption total possible drain = daily water consumption
From water consumption get daily water consumption / day
Assumption diversity factor
Get Waste drain flow per day
36
X

=
=
=
=

0.7
1

According to Qatar Public Work Authority Drainage Afairs


Septic tank Type

36

100%
25.2
6702
25200

m3
m3
Gallon
Liters

Type F

Proposed No.2
According to Uniform Plumbing Code Table K-3 Page 337

Dance Halls
Airport
Airport
Factories

Type of Occupancy-01
Type of Occupancy-02
Type of Occupancy-03
Type of Occupancy-04

Occupancy
Type

Gallons /
person

No. OF
OCCUP.

No. OF
OCCUP.

No. OF
OCCUP.

Dance Halls

100

100

Occupancy
Type

GPD/
Employee

No. OF
OCCUP.

GPD/
Passenger

No. OF
OCCUP.

Airport

15

100

100

Occupancy
Type

GPD/
Employee

No. OF
OCCUP.

GPD/
Passenger

No. OF
OCCUP.

Airport

15

100

100

100

Occupancy
Type

No
showers/
employee

No. OF
OCCUP.

With
showers/
employee

No. OF
OCCUP.

Cafeteria,
add /
employee

No. OF
OCCUP.

Factories

25

50

35

100

100

100

No. OF
OCCUP.

Total GPD

100

500

No. OF
OCCUP.

Total GPD

100

2000

No. OF
OCCUP.

Total GPD

100

2000

No. OF
OCCUP.

Total GPD

300

5250

9750

GPD

No. OF
OCCUP.
0

100

No. OF
OCCUP.

Get Total Capacity for Septic Tank From 4 Diferent Occupancy

Recommended Design Criteria. Sewage disposal systems sized using the estimated
waste/sewage flow rates should be calculated as follows:
(1) Waste/sewage flow, up to 1500 gallons/day (5677.5 L/day)
Flow x 1.5 = septic tank size
(2) Waste/sewage flow, over 1500 gallons/day (5677.5 L/day)
Flow x 0.75 + 1125 = septic tank size

Septic Tank Capacity for 1 day

According to Qatar Public Work Authority Drainage Afairs


Septic tank Type

=
8437.5
= 31944.375
= 31.944375

Type F

GPD
Liters
m3

Storm Water Drainage Calculation Sheet


150
1620

Roof Floor Area in m2


Get Roof Area in ft2
Diferent Rainfall Rate per HR (Sq. ft)

1 Inch

Horizontal Pipes Slop

4%

m2
ft2

According to National Plumbing Code


Size of Vertical Conductors and Leaders
Diameter of vertical pipe or leaders
Get Maximum GPM in Conductors

2
23

Inch.
GPM

Diameter of Horizontal pipe


Get Maximum GPM in Conductors

3
68

Inch.
GPM

Diameter of roof Gutters drain


Maximum GPM for Gutters
NO. of Gutters Required

8
83
1

Inch
GPM
GUILTERS

2
41.5
7

GUILTERS
GPM
Inch

6
40
3

Inch
GPM
GUILTERS

250
800
1050
1Inch

m2
m2
m2

In Case of Actual Design


Actual Gutter No.
Actual Gutter Flow
Diameter of Gutter Required
Actual Gutters Diameter
maximum Flow for Actual Gutters
Gutter No.
Storm Water Holding Tank
From Plan we have Roof Area in m2
Site Plan Area in m2
Total Plan Area
Rainfall Rate per HR (Sq. ft)
Get total Volume of Rain Water Holding Tank
For tank volume equal to
2
Get total Volume of Rain Water Holding Tank

=
days
=

26.7

m3/day

53.4

m3

Table of Total Fixtures

ENTER NO. OF UNIT ACCORDING TO FIXTURE TYPE PRIVATE OR PUBLIC


According of our bulding Specification we have
According of our bulding Specification we have
According of our bulding Specification we have

=
=
=

2
15
5

Basement
Non. Typical Floor
Typical Floor

According of our bulding Specification we have


According of our bulding Specification we have
According of our bulding Specification we have
According of our bulding Specification we have

=
=
=
=

1
1
1
25

Last Floor
Before Last Floor
2 Level befor Last Floor
Total Floor

Fixture type :

private

B3

B2

B1

G.F.

F.F

2nd.F

3rd F

4th F.

5th F

6th F

TYP. F

2 level
b.last

1 level
b.last

Last Floor

Total
Fixtures

Water closet (flush valve)


Water closet (flush tank)
Water Bidet
Hose for W.C
Lavatory (& H.B.)
Kitchen sink

1
1
1
1
1
1

2
2
2
2
2
2

3
3
3
3
3
3

4
4
4
4
4
4

5
5
5
5
5
5

6
6
6
6
6
6

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

2
2
2
2
2
2

23
23
23
23
23
23

Service sink office,ect


Shower
Bath tub
Dishwashing machine
Laundry 8 Ib
Laundry 16 Ib
Ablution (Public)
Urinal (1" flush valve)

1
1
1
1
1
1
1
1

2
2
2
2
2
2
2
2

3
3
3
3
3
3
3
3

4
4
4
4
4
4
4
4

5
5
5
5
5
5
5
5

6
6
6
6
6
6
6
6

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

2
2
2
2
2
2
1
1

23
23
23
23
23
23
22
22

Urinal (3/4" flush valve)


Urinal (flush tank)
Drinking fountain 3/8 in
Sum of Total Fixture in All Building Floor

1
1
1

2
2
2

3
3
3

4
4
4

5
5
5

6
6
6

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

0
0
0

1
1
1

22
22
22
386

B3

B2

B1

G.F.

F.F

2nd.F

3rd F

4th F.

5th F

6th F

TYP. F

2 level
b.last

1 level
b.last

Last Floor

Total
Fixtures

Water closet (flush valve)


Water closet (flush tank)
Water Bidet
Hose for W.C
Lavatory (& H.B.)
Kitchen sink

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
0
0
0

Service sink office,ect


Shower
Bath tub
Dishwashing machine
Laundry 8 Ib
Laundry 16 Ib
Ablution (Public)

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

Urinal (1" flush valve)


Urinal (3/4" flush valve)
Urinal (flush tank)
Drinking fountain 3/8 in
Sum of Total Fixture in All Building Floor

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0

0
0
0
0
0

FIXTURES / POINT NO.

Fixture type :

public

FIXTURES / POINT NO.

Pump Calculation Sheet :According to International Plumbing Code

Type of Water Heater

Apartement
Individual

Type Of Flush

Flush Tank

Proposed Location Of Water Filter

After Roof Tank

Type of Occupancy

1- Lift Pump Calculations


Total length of water pipe for lift pump from ground to roof water tanks
Vertical Length from Pump To Filling Point In Roof Water Tank
Pump Head = 1.20*(static head + static/10 + total pipe length from pump to roof tank
*4/100+5 m losses in filter if it`s befor tank + 5 m losses in float valve
Get Pump Head =
1.20 * (
10
+ 10
/10
+
100
*4/100
+
According to Fixture Unit Method From International Plumbing Code
We have Total Building Fixture Unit
No .of Pumps Will Be Used In Lifting
Pump Flow
Pump Head
Pump HP
No. of Pumps

98
35
3.3
2

Duty

Duty
GPM
PSI
HP
1

0 +

=
1

Standby

Standby

2- Boster Pump Calculations


No .of Pumps Will Be Used for Boosting
From National Plumping Code Get Total Fixture Unit load
Pump Flow
Pump Head
Pump HP
No. of Pumps

17
30
0.5
2

Duty

Duty

GPM
PSI
HP
1

Standby
=

Standby

Pressure Vessel
From above we get boster pump flow
& Estimated pressure for booster pump
it is usual to arrange for pumps to have an ON-OFF cycle of 3-4 min
Pump Capacity should be such that peak water demand is not likely to exceed half the average
pump out put
PVO = 0.5 * APO X time of pump run in seconds

=
=
=

Pump run time

240

5 mintes - 300 sec

PVO. ( pressure vessel output)

0.5

P1 . V1 = P2 . V2
from boyles low
where
P1 = Cut in pressure head
P1 = Cut out pressure head
Get
V1
V1 =
For Working Volume Say 20%
V1 =
Volume of Vessel

300

0.66938

300

V1 = V1-V2/(1-(P1/P2)
=
=

14.0136 meter
24.5238 meter

234.281

m3

282

m3

Liters

Notes:-

In Case of Individual Water Heater Pump Will Use To Deliver (Hot & Cold) Water for last
3 floors only and by gravity for the rest of the building
In Case of Centeral Water Heater Pump Will Use To Deliver (Hot & Cold) Water for Last
3 Floors & Hot Water to The Rest of Building

20
35

Standby

100
10

m
m

24

386

Unit

Standby
62.25

17
1.071
21.122449

GPM
L/S
m

sec
100.40625

Psi
Psi

Liters

Pressure Pump Calculation


Pressure pump will used in case on suppling the building from main network directly
or from ground or underground water tank as there is no ablity to make booster pump
and roof elevated tank
The Calculation based on fixture unit load from fixture unit load of the building get

Type of Water Heater


Type Of Flush

Flush Valve

2
No .of Pumps Will Be Used for Boosting
From National Plumping Code Get Total Fixture Unit load

Duty
=

2
823.5

Total Distance Between Pump to Farther Fixture Unit at Last Floor


Vertical Length from Pump To Farther Fixture Unit at Last Floor
Pump Head = 1.20*(static head + static/10 + total pipe length from pump to roof tank
*4/100+5 m losses in filter + 5 m loss in water heater if centeral
+ 14 m residual pressure at last fixture unit
=
=

1.2 X (
57.84

20
+
meter head

Pump Flow
Pump Head
Pump HP
No. of Pumps

20 / 10

186.82

+ 4 /100* 55 + 5 +

94
83
8
DUTY

GPM
PSI
HP
2

STANDBY

Note
It is better to use 3 pumps 1 duty and 2 standby satisfy the full load of system
In Case only for Governement network supply you can reduce pump head for pump
by value of gov. network pressure (about 1.5 bar or 20 psi)

Calculation for Hydropneumatic Tank System


Assuming the maximum no. of pumping cycles be six per hour 5 min an & 5 min of
From Perevious Calculation for Pump Capacity Equal to =
94
1/2 of Pump Capacity
=
47
For 5 min working
=
235
then 235 Gallons
should equal 25 per cent withdrawal.
100 percent then equal to
235
X
4
=
940
From Calculation get pump Head Equal to
Assuming Low working pressure
Then get maximum working pressure

=
=
=

Water Capacity . Percent of Total Tank Capacity


From Calculation Low & high Pressure Between
Water Capacity , Percent Of Total Tank Capacity
Get Tank Capacity
Get Water Capacity in the tank
Get Percent of Water Drawal To Start Pump
Get The Volume of Water Drawal To Start Pump
Pump Flow
183.7
Pump Head
Pump HP
No. of Pumps
2
Hydropneumatic Tank
Water Capacity in the tank
Volume of Water Drawal To Start Pump

83
80
100

40%
Low 60 Psi - High 80 Psi
=
=
=
=
=

40
940
376
16
150

DUTY

94
103
10
2
940
376
150

Note :it is required to increase pump head to high pressure of hydropneumatic Tank

e building get

Standby
Fixture unit
55
20

+ 14

ad of system
mp head for pump

m
m

GPM
GPM
Gallon
Gallon Tank
Psi
Psi
Psi

0%

ow 60 Psi - High 80 Psi

umatic Tank

%
Gallon
Gallon
%
Gallon
GPM
PSI
HP
STANDBY
Gallon
Gallon
Gallon

Submersible Pumps will be designed according to fixture unit method


According to our fixture unit we got :Type Of Flush
The receiving basin will collect sanitary from
The receiving basin will collect sanitary from

Flush Valve
3RD BASEMENT
GROUND FLOOR

The receiving basin will collect sanitary from


The receiving basin will collect sanitary from
The receiving basin will collect sanitary from
The receiving basin will collect sanitary from

Fixture unit
Water closet (flush valve)
Water closet (flush tank)
Water Bidet
Hose for W.C
Lavatory (& H.B.)
Kitchen sink
Service sink office,ect
Shower
Bath tub
Dishwashing machine
Laundry 8 Ib
Laundry 16 Ib
Ablution (Public)
Urinal (1" flush valve)
Urinal (3/4" flush valve)
Urinal (flush tank)
Drinking fountain 3/8 in

3RD BASEMENT
Private Public
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

GROUND FLOOR
Private Public
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0

Private
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Public
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Private
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Public
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Private
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Public
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Private
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

From Fixture Unit Loads get Pump Head

233.4

GPM

The distance between low water line in the receiver up to the highest point pumped
Total distance for lifting line from lowest level to pumped level + static head

5
15

Get required pump head = 1.20*(static head + static/10 + total pipe length *4/100)
=
1.2 X (
5
+
5
/ 10
+
=
Meter
7.4
Pump Flow
Pump Head
Pump HP

4 / 100

233.4
11
2.5

15

Meter
Meter

GPM
PSI
HP

Note
- when the receiving basin collects the discharge sanitary wastes it is called an Ejector Pump
- when the receiving basin collects storm water or other clear water it is called a Sump Pump
Ejector Basin Sizing
Time Required to Empty the Sum pit
Minimum Capacity of Storage
=
Pump Capacity X Time Required to empty sum pit
=
233.4
X
10
= 2334
Gallon
Assumed using of delux system the standard diameter of tank will be 4 ft or 1.20 m
Getting the depth of the basin
= Storage Capacity / ( 0.7854 * D 2 * 7.5 )
0.7854
7.5
)
=
2334
/
(
X
4^2
X
distance between high level & low level
= 24.7929
ft
= 7.55686
m
Adding :Invert level of the entering pipe
0.9
meter ( Below finish floor level )
Low level of water must be a minimium of 0.15 cm take it
=
0.2
meter

10 Minute

Getting receving basin depth


=

= Distance between low & high level + invert level of entering pipe + suction level
7.55686
+
0.9
+
0.2
=
8.65686 meter

Getting Capacity of Storage


Getting Receving Basin Depth =
Receving Basin Diameter
Receiving Basin Area
Diameter of lifting pipe Assumed velocity 1 m/sec

Sump Basin Sizing


Time Required to Empty the Sum pit
Area of Sandy soil
=
200
Assumed 2 gpm for each 100 ft2
Area of clay soil

m2

m2

Area of Paved soil

m2

Equal

2160

177.3
=
=

GPM

21.6

GPM

112.5

GPM

ft2

2700

ft2

Get

43.2

Gallon
Meter
Meter
M2
mm

ft2

Get

=
250
Assumed 1 gpm for each 24 ft2

Minimum Capacity of Storage

Equal

136.909

2334
8.7
1.2
9.8
150

10
Minute
2160

Get

=
200
Assumed 1 gpm for each 100 ft2

Get total Capacity

Equal

=
=
=
=

As 4 in per hour rainfall

GPM
Pump Capacity X Time Required to empty sum pit
177.3
X
10
= 1773
Gallon

Assumed using of delux system the standard diameter of tank will be 4 ft or 1.20 m
Getting the depth of the basin
= Storage Capacity / ( 0.7854 * D 2 * 7.5 )
0.7854
=
1773
/
(
X
4^2

7.5
)
X
= 18.8337
ft
= 5.7405
m

The distance between low water line in the receiver up to the highest point pumped
Total distance for lifting line from lowest level to pumped level + static head
Get required pump head = 1.20*(static head + static/10 + total pipe length *4/100)
=
1.2 X (
10
+
10
/ 10
+
=
Meter
14.4
Pump Flow
Pump Head
Pump HP

177.3
21
3.6

Invert level of the entering pipe


Low level of water must be a minimium of 0.15 cm take it
Getting receving basin depth
=

distance between high level & low level

10
25

4 / 100

25

Meter
Meter

GPM
PSI
HP

0.9
0.2

meter
meter

( Below finish floor level )

= Distance between low & high level + invert level of entering pipe + suction level
5.7405
+
0.9
+
0.2
=
6.8405 meter

Getting Capacity of Storage


Getting Receving Basin Depth =
Receving Basin Diameter
Receiving Basin Area
Diameter of lifting pipe Assumed velocity 1 m/sec

=
=
=
=
119.326

1773
6.9
1.2
7.8
150

Gallon
Meter
Meter
M2
mm

Public
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Private Public
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1
5
1

gh level & low level

gh level & low level

Centeral Hot Water Calculation Sheet


Calculation Will be According to Type of The Building & Fixture Unit Methods:Choose the Type of Your Building

Fixture
private lav.
public lav.
bathtub
dishwasher
foot basin
kitchen sink
laundry
pantry sink
shower
service sink
hydrotherapentic shower
hubbard bath
leg bath
arm bath
sitz bath
continuous flow bath
circular wash sink
semicircular wash sink
DEMAND FACTOR

GYM
QTY

Demand

Total Gallon/Hr

2
2
0
1
2
0
0
0
0
0
0
0
0
0
0
0
0
0

2
8
30
0
12
0
0
0
225
0
0
0
0
0
0
0
0
0

4
16
0
0
24
0
0
0
0
0
0
0
0
0
0
0
0
0
44

0.4
17.6
17.6

Probable Maximum Demand


Heater or coil Capacity
STORAGE CAPACITY Factor

1
17.6
67
1.7673513514
80
1.75

Storage Tank Capacity GALLONS


Storage Tank Capacity Liters
Heater Power
Heater Storage Capacity in Liters
Heater Power in Kw

Water Heater Selection :Heater Storage Capacity in Liters


Heater Power in Kw

=
### 80
=
### 1.75

Liters
Kw

Centeral Hot Water Calculation Sheet


Calculation Will be According to Type of The Building & Fixture Unit Methods:Choose the Type of Your Building

Hospital

Type of Pipes will be used

Non-Insulated Pipe

Type of Pipes will be used

SCH-40 Steel

In Case of insulated pipe u dont need to choise type of pipe used


Fixture

QTY
10
10
30
10
20
2
15
20
30
2
0
0
0
0
0
0
0
0

private lav.
public lav.
bathtub
dishwasher
foot basin
kitchen sink
laundry
pantry sink
shower
service sink
hydrotherapentic shower
hubbard bath
leg bath
arm bath
sitz bath
continuous flow bath
circular wash sink
semicircular wash sink

Total Gallon/Hr

2
6
20
100
3
20
28
10
75
20
400
600
100
35
30
165
20
10

20
60
600
1000
60
40
420
200
2250
40
0
0
0
0
0
0
0
0
4690

0.25

DEMAND FACTOR

1172.5
1172.5

Probable Maximum Demand


Heater or coil Capacity

0.6

STORAGE CAPACITY Factor

703.5

Storage Tank Capacity GALLONS

Heat loss in Hot Water Pipes :Nominal pipe size

Pipe length in
meter

Q loss/Ft

1/2"
3/4"

100
50

35
43

11480
7052

1"
1-1/4"

30
100

53
65

5215.2
21320

1-/2"
2"
2-1/2"

100
50
70

73
91
108

23944
14924
24796.8

3"
4"

0
0

129
163

0
0

5"
6"

0
0

199
233

0
0

8"

299

Total Qloss for Hot Water Network

0
108732

Get Total heat loss in the system =


For each 10,000 BTU/HR Need 1 GPM
Required GPM for heat loss make up

Qloss
BTU/HR

Total

108732

=
=

Btu/hr

Total heat loss in the system / 10,000


GPM
10.9

Total Farther Pipe length Supply & Return


=
m
100
to get pump head the only loss we have in the line friction loss in all pipes and fitting
get pump head = 1.5*(friction loss)
= 1.5 * ( 4/100 * Total pipe length )
=
meter head
4.8
6.8
Psi

Conclusion for Centeral Water System


Heat or coil Capacity
Storage Tank Capacity

1172.5
703.5

Gallon / Hour
Gallon

Circulation Pump Selection : Pump Flow


Pump Head
Pump HP
Note :You do not need to chose type of pipe in case of insulated pipe

10.9
6.8
0.1

GPM
PSI
HP

Calculation for Pressure Reducing Station


The Most Popular Way to Choose The No. of PRV. Station and locations :
Most of fixture unit installed need between 8 Psi to 25 Psi as residual pressure at it is inlet.
Assuming that the last fixture unit need About
=
Maximum pressure to keep the velocity less than 1.2 m/sec, or 10 fps
=
So we have additional pressure in network about
=
=
From Previous Data we have the building height equal to

=
=

Floor Level Height

=
=

Getting No. of PRV. Installed in Riser


So We Will Get That PRV. Sataion Will Fixed Every

=
=

Note :Minimum pressure required for flushing water closet varies from 12 Psi to 25 Psi
so we can assume 20 Psi as residual pressure is most suitable.

e at it is inlet.
20
70
50
115.5

Psi.
Psi.
Psi.
Feet

116
380.5

Meter
Feet

3.65
12

Meter
Feet

3
10

PRV. Unit
Story

12 Psi to 25 Psi

Chilled Drinking Water System :Type of Building


Water Inlet Temperature
Room Temperature
Assumed Circulation Pump HP

Office - Corridor & Lobbies


65 F
80 F
3/4 HP

No. of Outlet
Gallon per Outlet per Hour
BTU Per HR. Per Gallon

60
5
167

Outlet
Gal./Outlet/HR
BTU/GAL.

Get from Above Usage load

50100

BTU/HR

=
=
=
=
=
=
=
=

0
0
2940
1100
610
0
0
0

BTU/HR
BTU/HR
BTU/HR
BTU/HR
BTU/HR
BTU/HR
BTU/HR
BTU/HR

Circulation Pump Heat Input

1908

BTU/HR

Total BTU/HR
Adding 15% as Factor of Safety

=
=

56658
65157

BTU/HR
BTU/HR

=
=
=
=
=

0
0
77
29
16

GPH
GPH
GPH
GPH
GPH

Total GPH
Adding 20% as Factor of Safety

=
=
=

122
146
2.4

GPH
GPH
GPM

No of. Circuit
Assume 3 gpm per Circuit
Get total GPM

Circuit

15

GPM

So get Circulation Pump Capacity

15

GPM

Length of Pipe According to Pipe Size


Length
Length
Length
Length
Length
Length
Length
Length

of
of
of
of
of
of
of
of

1/2" Pipe Size in Meter


3/4" Pipe Size in Meter
1" Pipe Size in Meter
1.25" Pipe Size in Meter
1.5" Pipe Size in Meter
2" Pipe Size in Meter
2.5" Pipe Size in Meter
3" Pipe Size in Meter

=
0
m
=
0
m
= 182.9 m
= 60.98 m
= 30.49 m
=
0
m
=
0
m
=
0
m

0
0
600
200
100
0
0
0

ft
ft
ft
ft
ft
ft
ft
ft

Circulation Losses in Pipes


1/2" Pipe Size in Meter
3/4" Pipe Size in Meter
1" Pipe Size in Meter
1.25" Pipe Size in Meter
1.5" Pipe Size in Meter
2" Pipe Size in Meter
2.5" Pipe Size in Meter
3" Pipe Size in Meter

=
=
=
=
=
=
=
=

0
0
600
200
100
0
0
0

X
X
X
X
X
X
X
X

390
420
490
550
610
700
800
940

Circulation Pump Calculation:1/2" Pipe Size in Meter


3/4" Pipe Size in Meter
1" Pipe Size in Meter
1.25" Pipe Size in Meter
1.5" Pipe Size in Meter

=
=
=
=
=

0
0
600
200
100

X
X
X
X
X

11.1
11.8
12.8
14.6
15.7

Circulation Pump Head


Total Farther Pipe length Supply & Return
=
100
M
to get pump head the only loss we have in the line friction loss in all pipes and fitting
get pump head = 1.2*(friction loss)
= 1.5 * ( 4/100 * Total pipe length )
=
4.8 meter head
6.8 Psi
BTU
= GALLON TO BE COOLED
65157
= GALLON TO BE COOLED
GALLON TO BE COOLED
=

X
TEMPERATURE DIFFERENCE
X
(
65
45
392.5 Gallon

) X

Assume 50% of Water Will Return Back to Chiller And 50% Will Come From Make up Water
Make Up Connection Should Be Between Pump and Cooling Unit
Storage Capacity Will be

Chiller Cooling load 183.7


Storage Capacity
No. of Pumps
Circulation Pump Capacity
Circulation Pump Head
Circulation Pump HP

196.3 Gallon

65157
196
1
Duty
15
6.8
0.1

Btu/hr
Gallon
Standby
Gpm
Psi
HP

8.3
8.3

Irrigation Pump Selection


Calculation of manual System
Insert No. of Irrigation Pump Will be Used
Enter Total Time to Finish Manual Irrigation
Pump Capacity
Enter Diference in Head Between Pump & Irrigation Line
Enter Total Lengh Of Irrigation Pipe

1
2
2.65
0.3
150

Duty
Hours
m3/hr
m
m

Pump Head = 1.20*(static head + static/10 + total pipe length from pump to farther
irrigation point *4/100+3 bar residual pressure at farther point
= 64 psi
Irrigation Pump Selection :Pump Capacity
Pump Head
Pump HP
Pumps

11.7
GPM
64
Psi
0.73
HP
1 Duty 1 StandBy

Pressure Vessel
From above we get pump flow

=
=
=

& Estimated pressure for boster pump

11.7
GPM
0.7361112 L/Sec
64
PSI

it is usual to arrange for pumps to have an ON-OFF cycle of 3-4 min


Pump Capacity should be such that peak water demand is not likely to exceed half the average
pump out put
PVO = 0.5 * APO X time of pump run in seconds
Pump run time
5 mintes - 300 sec
PVO. ( pressure vessel output)

0.5

* 0.4600694813
X
=
69
Liters

P1 . V1 = P2 . V2
from boyles low
where
P1 = Cut in pressure head
P1 = Cut out pressure head
Get
V1
V1 =
For Working Volume Say 20%
V1 =
Volume of Vessel

300
V1 = V1-V2/(1-(P1/P2)

=
=
312

Liters

375

Liters

35.1
45.1

400

m
m

Liters

StandBy

lf the average

1-V2/(1-(P1/P2)

Liters

Automatic Irrigation System Calculation


Irrigation Water Demand Requirement
Plant Description
Shrubs
Turf or Grass
Ground Cover
Trees
Palms

Area / Quantity
Watering Rate
431.47
m2
16 liters/ day/m2
1872
m2
12 liters/ day/m2
1160
m2
12 liters/ day/m2
115
No.
120 liters/ day/m2
8
No.
150 liters/ day/m2
Total Watering Rate
Adding 2% as Factor Of Safety

From Perivious Data Get


Storage tank for 1 day
Storage tank for 2 days

=
=

59.5
119

m3
m3

LPD
6903.52
22464
13920
13800
1200
58287.52
59453.27

Over Flow Swimming Pool Calculation Sheet


Surface Area of Swimming Pool
Pool average depth
Got Pool Volume

=
=
=

38
1.7
64.6

m2
m
m3

According To Egyptian Swimming Pool Code for every 25 m2 surface area need 1 inlet
NO. Water Inlets
=
1.52
inlets
So Get the No. Of inlets
=
2
inlets
According to Type of Swimming Pool Turn Over Period Will be Selected
Swimming Pool Type

SPA.

Enter No. of Turn Over Period

Get Swimming Pool Pump Capacity

= Pool Volume / ( Turn Over Period * 60 )


=
4.31
m3/min

No. Of pump will used


no. Of standby pumps

=
=

1
1

Get pump flow rate

4.31

Balance tank volume

Balance tank volume

0.25

Time / Day

Pump
Pump
m3/min

40 L/m2 X Pool Surface area + 10 min X pump flow rate +


0.01 X pool surface area
=
45
m3
=
45
m3

To calculate pipe sizing


All Folwing Equation According to SPATA Swimming Pool Manule Design
Supply pipe maximum velocity will be 2 m/s
No. Of inlet
Pump flow rate

=
=

2
258.6

Each inlet give flow rate

129

Inlet
m3/hr
m3/hr

=
=
=
=
=
=
=
=
=
=
=
=

150
150
150
150
150
150
150
150
150
150
150
150

mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.

Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia

1
2
3
4
5
6
7
8
9
10
11
12

= 151.23451
= 213.8779
= 261.94586
= 302.46902
= 338.17064
= 370.44738
= 400.1289
= 427.75579
= 453.70353
= 478.24551
= 501.58812
= 523.89171

Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking

it
it
it
it
it
it
it
it
it
it
it
it

NOTE :No. of pipe will be taken according to No. of inlet for 4 inlet in series take to Dia 4

Suction pipe maximum velocity will be 1.2 m/s


Pump flow rate
No. Of outlet
Each outlet give flow rate

=
=
=

258.6
4
64.65

m3/hr
Outlet
m3/hr

Dia
Dia
Dia
Dia

=
=
=
=

150
150
150
150

mm.
mm.
mm.
mm.

1
2
3
4

= 136.68888
= 193.30727
= 236.75209
= 273.37776

Taking
Taking
Taking
Taking

it
it
it
it

NOTE :-

No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia
Over flow pipe Grille velocity will be 0.3m/s
No. Of Grille
Pump Flow Rate

=
=

10
258.6

Grilles
m3/hr

Each outlet give flow rate

25.86

m3/hr

=
=
=
=
=
=
=
=
=
=
=
=

100
150
150
150
150
150
150
150
150
150
150
150

mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.

Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia

1
2
3
4
5
6
7
8
9
10
11
12

= 94.077548
= 133.04574
= 162.94709
= 188.1551
= 210.36379
= 230.44199
= 248.9058
= 266.09149
= 282.23264
= 297.49933
= 312.01993
= 325.89419

Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking

it
it
it
it
it
it
it
it
it
it
it
it

NOTE :-

No. of pipe will be taken according to No. of over flow unit for 4 unit take to Dia 4
Getting the filter area to be used
Pump flow rate

=
Filter area
Assume we have to use a filter with diameter
=
No.of filter required
7.2513474

258.6

m3/hr

7.4
130
7

m2
cm
Filter

at 15 gpm / ft2

Heating Calculation for swimming pools


Heater is required for heating purposes at winter seasons if required take inconsideration that
it's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:The recommended Pool water temperature is around 28 C deg.
Outdoor air condition
: 46 / 30 deg C DB/WB summer condition, max 122deg F (50 C)
: 6/ 10 deg C BD/WB -winter condition
From SPATA p5, Sec3, the Average Daily heat loss (DH) in KWhr / m2 of pool surface area

Correction Value Will be Changed According to type of Swimming Pool And it`s Location
Swimming Pool Type and Location

Outdoor / Exposed Pool Location

correction value to be used i


hours per day available for heating
No. of hours per day available for heating
=

Heater required

1.25

96 hours
=

96

hours

Pool Volume * 1000 * ( Tc2 - Tc1) / ( 860 * Avaliable Heating Hour)


= 64.6* 1000 ( 28 - 10 ) / 860 * 96
Kw
=
17.7

Cooling Calculation for Swimming Pools


For cooling purpose in summer seasons chilled water is required to cooling the water temperature
in summer to recommended temperatures
The recommended Pool water temperature is around 28 deg C
Outdoor air condition : 46 / 30 deg C DB/ WB - summer condition , Max 122 deg F
: 10 / 06 deg C DB/ WB - winter condition
During summer time the outdoor air temperature will be around 45 deg C and hence the water
temperature will be the same
So to estimate the cooling load required for the chiller to reduce water temperature to 28 deg C
will be two part as following

72 hours

hours per day available for cooling


No. of hours per day available

72

hours

The first part is the cooling load required to reduce the water temperature
to 28 deg C as following
Q1

V * Cp * P * (d T ) / Time Required for cooling

where :V= volume of pool


Cp = specific heat of water 4.18 (KJ/Kg.C)
P = specific heat of water = 1 Kg/L
d T = temperature diference
Q1

=
64.6 * 4.186 * 1 * ( 40 - 28 ) / ( 3600 * 72 )
Kw
=
12.5
The second part is the cooling load required to over come the heat lose from the water
surfaces of swimming pool
Q2

CF *DH * Pool surface area / Time Required for cooling

where :CF= Correction Factor


DH = average daily loss from swimming pool surface
from SPATA tables there is no information about heat loss from pool areas the gulf area condition
the avaliable data only at 15deg C out door temp which is = 3.48 Kwh/m 2
Assuming linearity condition the excepeted heat loss at 45deg C = (45/15)x3.48 = 10.44 Kwh/m

Q2

=
1.25 * 38 * 10.44 / 72
=

So the Total Ciller Capacity will be

Kw

6.9

Q1

= 12.5
+
=
19.4
=
66251
=
5.5

Q2

6.9
Kw
Btu/hr
TR

Pump head calculation for swimming pools


Heater pressure drop
Filter pressure drop
Chlorination auto pilot unit
Pipes and fittings losses
Static head heat pump

=
=
=
=
=

10
5
2
7
5

ft
ft
ft
ft
ft

Pump head
Pump HP

=
=

34.8
20

ft
HP

Swimming Pool Lighting :


For lighting we need about 5.4 watt to 16.30 watt for each 1m2
Take the watt required for each 1m2
=
10
Total watt required
=
380
for lamp have capacity of
=
300
No. of lamp required
=
1

Watt
Watt
Watt
Lamp

Swimming Pool Conglusion


Pump Capacity
Pump Head
Pump HP
Balance tank V.
Filter
Heater Capacity
Cooling Capacity
Lighting

1139
15
20
45
7
17.7
5.5
1

GPM
PSI
HP
m3
Filter with Diameter 130 cm
Kw
TR
Lamp, Each one 300 Watt

er Period * 60 )

flow rate +

series take to Dia 4

in series take to Dia 2

4 unit take to Dia 4

at 15 gpm / ft2

eration that

eg F (50 C)

l Location

er temperature

ence the water

e to 28 deg C

om the water

d for cooling

area condition

= 10.44 Kwh/m 2

Skimmer Swimming Pool Calculation Sheet


Surface Area of Swimming Pool
Pool average depth
Got Pool Volume

=
=
=

130
1.7
221

m2
m
m3

According To Egyptian Swimming Pool Code for every 25 m2 surface area need 1 inlet
NO. Water Inlets
=
5.2
inlets
So Get the No. Of inlets
=
5
inlets
According to Type of Swimming Pool Turn Over Period Will be Selected
Swimming Pool Type

Diving Pools

Enter No. of Turn Over Period

Time / Day

Get Swimming Pool Pump Capacity

= Pool Volume / ( Turn Over Period * 60 )


=
0.61
m3/min

No. Of pump will used


no. Of standby pumps

=
=

1
1

Get pump flow rate

0.61

Pump
Pump
m3/min

Acoording to egyptian code for swimming pool 1 skimmer for each 46.5 m 2 from
surface water for swimming pool
No. of Skimmer

Skimmer Unit

To calculate pipe sizing


All Folwing Equation According to SPATA Swimming Pool Manule Design
Supply pipe maximum velocity will be 2 m/s
No. Of inlet
Pump flow rate

=
=

5
36.6

Each inlet give flow rate

Inlet
m3/hr
m3/hr

=
=
=
=
=
=
=
=
=
=
=
=

50
50
65
75
75
100
100
100
100
100
100
100

mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.

Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia

1
2
3
4
5
6
7
8
9
10
11
12

= 35.983813
= 50.888796
= 62.325792
= 71.967626
= 80.462252
= 88.141981
= 95.20422
= 101.77759
= 107.95144
= 113.79081
= 119.34481
= 124.65158

Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking

it
it
it
it
it
it
it
it
it
it
it
it

NOTE :No. of pipe will be taken according to No. of inlet for 4 inlet in series take to Dia 4

Suction pipe maximum velocity will be 1.2 m/s


Pump flow rate
No. Of outlet
Each outlet give flow rate
Dia
Dia
Dia
Dia

1
2
3
4

= 51.423244
= 72.723449
= 89.067671
= 102.84649

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=

36.6
4

m3/hr
Outlet

9.15

m3/hr

=
=
=
=

50
75
100
100

mm.
mm.
mm.
mm.

NOTE :-

No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia
Getting the filter area to be used
Pump flow rate

=
Filter area
Assume we have to use a filter with diameter
=
No.of filter required
2.5477707

36.6

m3/hr

1
50
3

m2
cm
Filter

at 15 gpm / ft2

Heating Calculation for swimming pools


Heater is required for heating purposes at winter seasons if required take inconsideration that
it's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:The recommended Pool water temperature is around 28 C deg.
Outdoor air condition
: 46 / 30 deg C DB/WB summer condition, max 122deg F (50 C)
: 6/ 10 deg C BD/WB -winter condition
From SPATA p5, Sec3, the Average Daily heat loss (DH) in KWhr / m2 of pool surface area
Correction Value Will be Changed According to type of Swimming Pool And it`s Location
Swimming Pool Type and Location
correction value to be used i
hours per day available for heating
No. of hours per day available for heating
=

Heater required

No Cover
=

1.4

24 hours
=

24

hours

Pool Volume * 1000 * ( Tc2 - Tc1) / ( 860 * Avaliable Heating Hour)


= 221* 1000 ( 28 - 10 ) / 860 * 24
Kw
=
269.9

Cooling Calculation for Swimming Pools


For cooling purpose in summer seasons chilled water is required to cooling the water temperature
in summer to recommended temperatures
The recommended Pool water temperature is around 28 deg C
Outdoor air condition : 46 / 30 deg C DB/ WB - summer condition , Max 122 deg F
: 10 / 06 deg C DB/ WB - winter condition
During summer time the outdoor air temperature will be around 45 deg C and hence the water
temperature will be the same
So to estimate the cooling load required for the chiller to reduce water temperature to 28 deg C

will be two part as following

72 hours

hours per day available for cooling


No. of hours per day available

hours

72

The first part is the cooling load required to reduce the water temperature
to 28 deg C as following
Q1

V * Cp * P * (d T ) / Time Required for cooling

where :V= volume of pool


Cp = specific heat of water 4.18 (KJ/Kg.C)
P = specific heat of water = 1 Kg/L
d T = temperature diference
Q1

=
221 * 4.186 * 1 * ( 40 - 28 ) / ( 3600 * 72 )
Kw
=
42.8
The second part is the cooling load required to over come the heat lose from the water
surfaces of swimming pool
Q2

CF *DH * Pool surface area / Time Required for cooling

where :CF= Correction Factor


DH = average daily loss from swimming pool surface
from SPATA tables there is no information about heat loss from pool areas the gulf area condition
the avaliable data only at 15deg C out door temp which is = 3.48 Kwh/m 2
Assuming linearity condition the excepeted heat loss at 45deg C = (45/15)x3.48 = 10.44 Kwh/m
Q2

=
1.4 * 130 * 10.44 / 72
=
26.4

So the Total Ciller Capacity will be

Q1

= 42.8
+
=
69.2
= 236318
=
19.7
Pump head calculation for swimming pools
Heater pressure drop
Filter pressure drop
Chlorination auto pilot unit
Pipes and fittings losses
Static head heat pump
Pump head
Pump HP

=
=
=
=
=
=
=

10
5
2
7
5
34.8
2.8

Swimming Pool Lighting :


For lighting we need about 5.4 watt to 16.30 watt for each 1m2
Take the watt required for each 1m2
=
10
Total watt required
=
1300

Kw
+
26.4
Kw
Btu/hr
TR

ft
ft
ft
ft
ft
ft
HP

Watt
Watt

Q2

for lamp have capacity of


No. of lamp required

=
=

50
26

Watt
Lamp

Swimming Pool Conglusion


Pump Capacity
Pump Head
Pump HP
No. of Skimmer
Filter
Heater Capacity
Cooling Capacity
Lighting

161
15
2.8
3
3
269.9
19.7
26

GPM
PSI
HP
Unit
Filter with Diameter 50 cm
Kw
TR
Lamp, Each one 50 Watt

er Period * 60 )

series take to Dia 4

in series take to Dia 2

at 15 gpm / ft2

eration that

eg F (50 C)

er temperature

ence the water

e to 28 deg C

om the water

d for cooling

area condition

= 10.44 Kwh/m 2

Jacuzzi Calculation Sheet


The design of Jacuzzi is same as the design of swimming pool but with small change
in it there is Air Blower, Domestic Booster Pump , Skimmer, Jet Nozzle

Surface Area of Jacuzzi


Jacuzzi Average Depth
Got Jacuzzi Volume

=
=
=

11
0.9
9.9

m2
m
m3

1- Calculation for Drain outlet, Skimmer, Wall inlets, Pipes , Filter,


& Filtration or Circulation pumps
Turn Over Period
Jacuzzi Filtration Pump Capacity

=
0.3
Time / Day
= Pool Volume / ( Turn Over Period * 60 )
=
0.55
m3/min

No. Of pump will used


No. Of standby pumps

=
=

1
1

Get pump flow rate

0.55

Pump
Pump
m3/min

According to Egyptian code for Swimming Pool 1 Skimmer for each 46.5 m 2 from
Surface Water for Swimming Pool
Got No. of Skimmer
=
1
Unit
Assuming 50% of water suck from skimmer & 50% will suck from floor drains outlet
Got Flow Rate will discharge in pipes
=
0.275
m3/min
Suction pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate
=
16.5
m3/hr
No. Of outlet
=
2
Outlet
=
Each outlet give flow rate
8.25
m3/hr
Dia
Dia
Dia
Dia

1
2
3
4

= 48.828782
= 69.054326
= 84.573932
= 97.657565

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=
=

50
65
75
100

mm.
mm.
mm.
mm.

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Supply pipe maximum velocity will be 2 m/s


Pump flow rate
No. Of inlets
Each Inlet give flow rate

=
=
=

16.5
1
16.5

m3/hr
Inlets
m3/hr

Dia
Dia
Dia
Dia
Dia
Dia

=
=
=
=
=
=

50
75
100
100
100
150

mm.
mm.
mm.
mm.
mm.
mm.

1
2
3
4
5
6

=
=
=
=
=
=

54
76.4
93.6
108
120.8
132.3

Taking
Taking
Taking
Taking
Taking
Taking

it
it
it
it
it
it

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Getting the filter area to be used


Pump flow rate

33

m3/hr

Filter area
Assume we have to use a filter with diameter
No. of filter required

=
=
=

0.9
50
2

m2
cm
Filter

at 15 Gpm / ft2

Heating Calculation for Swimming Pools


Heater is required for heating purposes at winter seasons if required take inconsideration that
it's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:The recommended Pool water temperature is around 28 C deg.
Outdoor air condition
: 46 / 30 deg C DB/WB summer condition, max 122deg F (50 C)
: 6/ 10 deg C BD/WB -winter condition
From SPATA p5, Sec3, the Average Daily heat loss (DH) in KWhr / m2 of pool surface area
Correction Value Will be Changed According to type of Swimming Pool And it`s Location
Jacuzzi Type and Location
correction value to be used in
Hours per day available for heating
No. of hours per day available for heating
=

Heater required

High Water Table


=

24 hours
=

1.25
24

hours

Pool Volume * 1000 * ( Tc2 - Tc1) / ( 860 * Available Heating Hour)


= 9.9 * 1000 * ( 28 - 10 ) / 860 * 24
Kw
=
10.8

Cooling Calculation for Swimming Pools


For cooling purpose in summer seasons chilled water is required to cooling the water
temperature in summer to recommended temperatures
The recommended Pool water temperature is around 28 deg C
Outdoor air condition : 46 / 30 deg C DB/ WB - summer condition , Max 122 deg F
: 10 / 06 deg C DB/ WB - winter condition

During summer time the outdoor air temperature will be around 45 deg C and hence the
water temperature will be the same
So to estimate the cooling load required for the chiller to reduce water temperature to
28 deg C will be two part as following
hours per day available for cooling
No. of hours per day available

72 hours
=

hours

72

The first part is the cooling load required to reduce the water temperature
to 28 deg C as following
Q1

V * Cp * P * (d T ) / Time Required for cooling

where :V= volume of pool


Cp = specific heat of water 4.18 (KJ/Kg.C)
P = specific heat of water = 1 Kg/L
d T = temperature diference
Q1

=
9.9 * 4.186 * 1000 * ( 40 - 28 ) / ( 3600 * 72 )
Kw
=
1.9
The second part is the cooling load required to over come the heat lose from the water
surfaces of swimming pool
Q2

CF *DH * Pool surface area / Time Required for cooling

where :CF= Correction Factor


DH = average daily loss from swimming pool surface
from SPATA tables there is no information about heat loss from pool areas the gulf area
condition the available data only at 15deg C out door temp which is = 3.48 KWhr/m 2
Assuming linearity condition the excepted heat loss at 45deg C =
(45/15) x 3.48 = 10.44 KWhr/m2
Q2

=
1.25 * 11 * 10.44 / 72
=

So the Total Ciller Capacity will be

Kw

Q1

= 1.9
+
=
3.9
= 13318.5
=
1.1
Pump head calculation for swimming pools
Heater pressure drop
Filter pressure drop
Chlorination auto pilot unit
Pipes and fittings losses
Static head heat pump
Pump head
Pump HP

=
=
=
=
=
=
=

10
5
2
7
5
34.8
2.6

+
2
Kw
Btu/hr
TR

ft
ft
ft
ft
ft
ft
HP

Q2

2- Calculation for Air Blower, Jet Nozzle, Air Nozzle , Pipes , & Booster Pump,
Assuming Booster pump Capacity equal to 80% from Filtration pump Capacity
Filtration Pump Capacity
=
0.55
m3/min
No. Of pump will used
no. Of standby pumps

=
=

1
1

Booster Pump Capacity

0.44

Pump
Pump
m3/min

Suction pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate
=
26.4
m3/hr
No. Of outlet Floor Drains
=
3
Outlet
=
Each outlet give flow rate
8.8
m3/hr
Dia
Dia
Dia
Dia

1
2
3
4

= 50.43015
= 71.319002
= 87.347582
= 100.8603

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=
=

50
75
75
100

mm.
mm.
mm.
mm.

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Jet pipe maximum velocity will be 2 m/s


Pump flow rate
No. Of Jet Fitting
Each Jet give flow rate

=
=
=

26.4
12
2.2

m3/hr
Inlets
m3/hr

Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

40
40
40
40
40
50
50
50
65
65
65
65
75
75
75
75

mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.
mm.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

=
=
=
=
=
=
=
=
=

19.7
27.9
34.2
39.5
44.1
48.3
52.2
55.8
59.2
62.4
65.4
68.3
71.1
73.8
76.4
78.9

Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking
Taking

it
it
it
it
it
it
it
it
it
it
it
it
it
it
it
it

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Booster Pump head calculation


Pipes and fittings losses
Static head heat pump
Pump head

=
=
=

7
5
15.6

ft
ft
ft

Pump HP

0.9

HP

Air Blower & Air Jet Nozzle Calculation


No. of get nozzels fixed in Ground
Assuming each Jet nozzel give flow equal to

=
=

Air Nozzel

0.3

m3/min

No. Of duty air blower


No. Of standby air blower

=
=

1
1

Blower
Blower

Get Air Blower Capacity

1.8

m3/min

=
=
=
=
=
=
=
=
=
=

1/2
3/4
1 1/4
1 1/4
1 1/4
1 1/4
1 1/4
1 1/4
1 1/4
1 1/2

Inch
Inch
Inch
Inch
Inch
Inch
Inch
Inch
Inch
Inch

Air nozzel pipe sizing


Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia
Dia

1
2
3
4
5
6
7
8
9
10

=
=
=
=
=
=
=
=
=
=

10.6
21.2
31.8
42.4
53
63.6
74.2
84.8
95.3
105.9

NOTE :No. of pipe will be taken according to No. of jet nozzel for 2 nozzel in series take to Dia 2

Swimming Pool Lighting :


For lighting we need about 5.4 watt to 16.30 watt for each 1m2
Take the watt required for each 1m2
=
10
Total watt required
=
110
for lamp have capacity of
=
50
No. of lamp required
=
2

Watt
Watt
Watt
Lamp

Jaccuzi Pump Room Equipemet


Filteration Pump
No. of Pumps
No. of Skimmers
No. Of Filter
Heater Capacity
Cooling Capacity
Booster Pump
No. of Pumps
Air Blower
No. of Blower
Lighting

145 GPM & 15 PSI & 2.6 HP


1 Duty & 1 Standby
1 Skimmer with minimum flow rate 73 GPM
2 Filter with Diameter 50 cm
10.8 Kw
1.1
TR
116 GPM & 7 PSI & 0.9 HP
1 Duty & 1 Standby
64 CFM
1 Duty & 1 Standby
2 Lamp, Each one 50 Watt

mall change

er Period * 60 )

ies take to Dia 2

ies take to Dia 2

at 15 Gpm / ft2

eration that

eg F (50 C)

) / 860 * 24

rom the water

ed for cooling

ies take to Dia 2

ies take to Dia 2

series take to Dia 2

e 73 GPM

Fountain Design
The basic point in design of fountain from catalogue according to the shape of fountain
and water height and water through and degree of water
One of Companies working in this field is Fontana , made in Greece
Check catalogue in following site

Catalogue

From Catalogue chose the type of Nozzle you want


Insert Following Data
Nozzel Model
Nozzel Flow Rate
Nozzel Tip Pressure
Maximum Flow Height
Size of Inlet Pipe
Quantity

=
=
=
=
=
=

No. Of pump will used


No. Of standby pumps

=
=

1
1

Get pump flow rate

4.32

Assuming flow from drain outlet to vacum point =

MC-125
72
L/min
9.8
m
1
m
1.25
Inch
1
Unit

50

Pump
Pump
m3/hr
%

Suction pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate
=
2.16
m3/hr
No. Of outlet
=
2
Outlet
Each outlet give flow rate
1.08
=
m3/hr
Dia
Dia
Dia
Dia

1
2
3
4

= 17.666918
= 24.984795
=
30.6
= 35.333836

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=
=

50
50
50
50

mm.
mm.
mm.
mm.

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Vacum pipe maximum velocity will be 1.2 m/s from skimmer & drain outlet
Pump flow rate
=
2.16
m3/hr
No. Of Vacum Point
=
1
Outlet
=
Each outlet give flow rate
2.16
m3/hr
Dia
Dia
Dia
Dia

1
2
3
4

= 24.984795
= 35.333836
= 43.274935
= 49.969591

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=
=

40
40
40
50

mm.
mm.
mm.
mm.

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Supply pipe maximum velocity will be 2 m/s


Dia
Dia
Dia
Dia

1
2
3
4

=
=
=
=

27.6
39.1
47.9
55.3

Taking
Taking
Taking
Taking

it
it
it
it

=
=
=
=

40
40
50
50

mm.
mm.
mm.
mm.

NOTE :No. of pipe will be taken according to No. of outlet for 2 outlet in series take to Dia 2

Getting the filter area to be used


Pump flow rate

4.32

m3/hr

Filter area
Assume we have to use a filter with diameter
No. of filter required

=
=
=

0.1
60
1

m2
cm
Filter

Fountain Lighting :
For lighting we need about 5.4 watt to 16.30 watt for each 1m1
Surface Area of Fountain Pool
Take the watt required for each 1m2
Total watt required
for lamp have capacity of
No. of lamp required
Pump head calculation for swimming pools
Filter pressure drop
Chlorination auto pilot unit
Maximum distance from farest way to pump
Static head heat pump
Pump head
Pump HP
Filteration Pump
No. of Pumps
No. Of Filter

=
=
=
=
=

4
15
60
50
2

m2
Watt
Watt
Watt
Lamp

=
=
=

2
2
3
1

ft
ft
ft
ft

=
=

44.7
6

ft
HP

108 GPM & 19 PSI & 6 HP


1 Duty & 1 Standby
1 Filter with Diameter 60 cm

NOTE :you can use Submersible or filteration pump

hape of fountain

drain outlet

utlet in series take to Dia 2

drain outlet

utlet in series take to Dia 2

utlet in series take to Dia 2

at 15 Gpm / ft2

Grease Interceptor Design


There is two method to Calculate the Required Grease Interceptor
Method No.1 :To determine the correct size grease trap use the dimensions of the waste sinks.
Grease traps are diferentiated by their pounds and gallons per minute.
Grease Traps may be placed under the sink or they may be buried
Grease No.
1
2
3
4
5
6
7
8

Dimension in Inch
Length Width

Depth

Calculated
GPM

12
10
5
1.95
10
10
5
1.625
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
GPM OF ALL OTHER SOURCES
Grease GPM Required

Required Grease Interceptor


For one -minute sink drain
For two -minute sink drain
For Selection From Zurn Calalogue
For one -minute sink drain
For two -minute sink drain

9
9
5

=
=
=

Percentage
%
100
50
25
25
25
25
25
25

9
9
5

= GT2700-10, GT2702-10
= GT2700-07, GT2702-07

Method No.2 :This method depends on the no.of fixture unit will be connected to grease interceptor
No. of Fixture unit
For 3 GPM For 1 Fixture Unit
Required GPM
For one -minute sink drain
For two -minute sink drain
For Selection From Zurn Calalogue
For one -minute sink drain
For two -minute sink drain

=
=
=

24
24
12

= GT2700-25, GT2702-25
= GT2700-15, GT2702-15

Note:After Cetting GPM & Gallon Required go to Catalouge to Select Model


Must be connected to internet connection

Watts

Zurn

waste sinks.

Selected
GPM
1.95
0.8125
0
0
0
0
0
0
6
9
GPM
Gallon
Gallon

00-10, GT2702-10
00-07, GT2702-07

rease interceptor
Unit
GPM
Gallon
Gallon

00-25, GT2702-25
00-15, GT2702-15

elect Model

Zurn

You might also like