Kerbs & Paving

Task / Description

Slow

Ave

Fast

Units

Concrete Slabs, laid on bedding, to slight falls

2.7

4.2 m2/hr

Concrete Slabs, laid on bedding, to steep falls

2.3

2.7 m2/hr

Concrete Slabs, laid in mortar, to slight falls

1.5

2.3 m2/hr

Concrete Slabs, laid in mortar, to steep falls

1.1

1.5 m2/hr

Concrete Slabs, laid on sand, to slight falls

1.7

2.8 m2/hr

Concrete Slabs, laid on sand, to steep falls

1.6

1.9 m2/hr

Cobble Stones, laid in mortar, no patterns

0.3

m2/hr

Cobble Stones, laid in mortar, with patterns

0.2

m2/hr

Artificial Stone, laid on sand, with patterns

2.5

m2/hr

Brick Paviors, in mortar, straight joints

0.9

1.3

1.9 m2/hr

1.0

1.2 m2/hr

10.5

m2/hr

2.5

m2/hr

6.2

m/hr

Concrete Kerbs or Channels, laid to 5m radius

4.5

m/hr

Concrete Kerbs or Channels, laid to 10m radius

5.0

m/hr

Concrete Kerbs or Channels, laid to 20m radius

5.5

m/hr

Brick Paviors, in mortar, herringbone pattern


Gravel Paths, including preparation of sub-base
Concrete Paths, 100mm thick, including preparation of
sub-base
Concrete Kerbs or Channels, laid straight

Stone/Granite Kerbs or Channels, laid straight

3.5

m/hr

Concrete Edging, laid straight

7.7

m/hr

Concrete Edging, laid to 5m radius

5.8

m/hr

Concrete Edging, laid to 10m radius

6.2

m/hr

Concrete Edging, laid to 20m radius

7.1

m/hr

Cutting and Fitting Ends, Concrete Kerbs

6.6

no/hr

Cutting and Fitting Ends, Channels

5.8

no/hr

Cutting and Fitting Ends, Concrete Edging

8.3

no/hr