You are on page 1of 4

POLJOINDUSTRIES

Gandhigram Road,Mullakkad,P.O.Irinjalakuda-680121
Phno:0480-2825064,2826064 Tel Fax-0480-2827004
IND QTN.NO. 294-27-12-2014
To, RIYAZ THIRUUR,CHARATH HOUSE ,NIRAMARUTHOOR ,

Date
MALAPPURAM
Crop
CONTACT NO SHAJI 9995802222
Area(m2)
shajicharath74@gmail.com
Region
QUOTATION FOR NETAFIM IRRIGATION AND FOGGING SYSTEM
S. No.
Particulars
UNIT
QTY
RATE
IRRIGATION SYSTEM
HEAD UNIT
NOS
1
5,189.18
ARKAL 1.5""LEADER FI.+PLUG 120MENOS
1
2,075.68
10M3 SCREEN FILTER 2"
NOS
1
1,757.53
VENTURY NAKED 3/4" W/O ASSLY.NETAFIM
SAFETY DEVICES
PRESSURE GAUGE 250 GLZ 8 ATM. 1/4" BSP
AIR VACUUM VALVE 1" AV-010 BSP
BERMAD 1/2 PLAS. VACUUM BREAKER ARVP-BSP
Subtotal
DRIP MANIFOLD
ARIES 16008 2.0L/H 0.40M 500M-IND
PE IRRIG.PIPE 16/2.5-1.1MM W/O STR.400M
REDUCING COUPLING BARB17-BARB16 MT
RUBBER GROMMET 16*12
END LINE (DOUBLE O) 16/17
PE BUNDLED START CONN. BARB 16 BODY
Subtotal
VALVES

NOS
NOS
NOS

1
1
1

583.79
415.14
214.06

MTR
MTR
NOS
NOS
NOS
NOS

1500
100
100
100
100
100

13.23
11.62
3.13
2.72
2.08
1.80

MULCHING SHEET 1 MTR(400MTR)


PP BALL VALVE 1.5" (50MM)-IND
PVC FLUSH VALVE 50MM-IND
Subtotal
PVC MANIFOLD(as per field condition)

MTR
NOS
NOS

400
3
2

7.60
337.29
80.44

PVC PIPE50MM -06KG/CM2-IND


TOTAL
KVAT 5%

MTR

80

57.14

PVC FITTINGS(local purchase)


INSTALLATION CHARGES
TRANSPORTATION CHARGES
GRAND TOTAL

L/S

TRENCH FOR PIPE LAYING SHOULD BE DONE BY THE CLIENT.


Accomodation for the labours should be given by the client.

27/12/2014
VEG

50 CENT
1.2MTR

STEM
AMOUNT

5,189.18
2,075.68
1,757.53
9,022.39
583.79
415.14
214.06
1,212.99
19,845.00
1,161.60
313.00
272.00
207.60
180.00
21,979.20
3,040.00
1,011.87
160.88
4,212.75

4,571.20
40,998.53
2,049.93
43,048.46
1,500.00
3,000.00
2,000.00
49,548.46

(Rs.)

You might also like