You are on page 1of 10
wainisy of Raitways (Rall Mantralaya (RAILWAY BOARD) No.2007/E&R/400/1 New Delhi, Dt. 29. 6.2007 The General Managers, All Indian Railways & others. Sub: Yardsticks for gazetted staff in Construction Projects. Ref: Board's letter No 2006/E&R/400/1 dated 3.7.2006 The instructions on yardsticks for Gazetted staff in Construction Projects for the year 2006-07 were issued vide letter No.2006/E&R/400/1 dated 3.7.2006. 2. Ministry of Railways (Railway Board) has decided that for year 2007-88, creation/extension of posts of gazetted staff in construction projects will be as per the following guidelines: i) The existing level of workcharged posts may be maintained and the currencies of the posts which are expiring upto 30.6.2007 may be extended with sanction of competent authority. ii) After 30.6.2007, for additional work, only need based creation of workcharged posts should be undertaken in consultation with Finance. 3. It should be kept in view that overall expenditure on work charged establishment should be within the D&G charges as. advised vide Board's. letter no. 2000/E&R/400/2 dated 20.12.2001. All other stipulations/conditions already notified in Board's letter no. 2005/E&R/400/1 dt. 30.6.2005 will continue. 4. This issues with the concurrence of the Finance Directorate of the Ministry of Railways. 5. Hindi version will follow. (S.K.Sharma)- Executive Director, Efficiency & Research Railway Board No. 2007/E&R/400/1 New Delhi, dt. 29 .6.2007 4. The Principal Directors of Audit, All Indian Railways. 2. Dy. Comptroller and Auditor General Of India (Rlys), Room No.224, Rail Bhavan. for Financial Commissioner/Railways Government of India (Bharat Sarkar) Ministry of Railways {Rail Mantralaya) (RAILWAY BOARD) No.2006/E&R/400/1 New Delhi, Dt. 3 7.2008 The General Managers, All Indian Raliways & others. Sub: Yardsticks for gazetted staff in Construction Projects. Ref: Board's lettey’ No 2005/E&R/400/1 dated 30.6.2005 1 The yardsticks for Gazetted staff in Construction Projects 2005-2006 were issued vide letter No.2005/E&R/400/1 dated 30. * Not move than 1/3 posts should be operated in senior scale @ Yarristicks shall be applied on annual gross outlay 2. Minisiry of Railways (Railway poard) hes decided that for yeer 2006-07, creationfextension of posts of g staff in. Col projects perthe following guidelines: will be @s i) The, existing level of workcharged posts may be maintained and the ing upto 30.86.2006 may be currencies of the posts which are expiring extended. ii) “After 30.6.2006, for additional work, only need based creation of tation with Finance. workcharged posts should be undertaken in consul Cond. pi2 u “2. It should be kept in view that overall expenditu as advised vide Board's letter no. should be within the D&G charges 2000/E&R/400/2 dated 20.12.2001. All other in Board's letter no. 2005/E&R/400/1 dt. 30.86.2005 This issues with Railways. Hindi version will follow. No. 2006/E&R/400/1 4. FA & CAOS, All Indian Railways. 2. Dy. Comptrolier and Auditor General Of India (Rlys), Room No.224, Copy to: Addl. Member (W), ‘Addl. Member (Elec.), Addl. Member (Sig.), Addl.Member (Stores), Addl. Member (F), CAOs(Construction), All Indian Railways re on work charged establishment stipulations/conditions already notified will continue. the concurrence of the Finance Directorate of the Ministry of Rail Bhavan. sb for Financial Commissioner/Riys Addl.Member (T ele.) Advisor (AR) ED(Accounts), ED(RE), EDE(GC), EDF(E). E(GC) and F(E) | Branches (with 5 spares each). WY Government of India (Bharat Sarkar) Ministry of Railways (Rail Mantralaya) (RAILWAY BOARD) No.2005/E&R/400/1 New Delhi, Dt. 30. 6.2005 The General Managers, All Indian Railways & others. ‘Sub: Yardsticks for gazetted staff in Construction Projects. Ref: Board's letter No 2004/E&R/400/1 dated 22. 9.2004 ‘The yardsticks for Gazetted staff in Construction Projects for the year 2004-2005 were issued vide letter No.2004/E&R/400/1 dated 22.9.2004. ~@iariisticks for the year 2004-2005 (Fig. In Crore of Rs.) Accounts Post Civil [Electrical Sat including RE 4 2 3 4 5 6 ISAG 56.00 40.67__| 40.67 178.66 762.80 JAG 17.03 14.26 | 11.26 122.72 77.08 Iss 4.63 3.42 3.42 35.94 21.34" JsiGre | 3.53 1.98 1.98 28.22 * Not more than 1/3 posts should be operated in senior scale @ Yardsticks shall be applied on annual gross outlay 2. Ministry of Railways (Railway Board) has decided that the yardsticks for creationfextension of posts of gazetted staff in construction projects for year 2005- 2006 _shall be as follows:- GY ardsticks fo the year 2005-2006 (Fig. in Crore of Rs.) Post Civil [Electrical ‘Sat Accounts lincluding RE 4 2 3 4 5 6 ISAG. 58.80 42.70 42.70 187.80 202.44 JAG 17.88 11.82. 11.62 128.86 80.94 ss. 4.86. 3.59 3.59 37.74 2871 JS/Gr. ‘B’ 3.71 2.08 2.08 29.63 - @ Yardsticks shall be applied on annual gross outlay LX) es contd....pagey2 -2- Yardstick for operating the post of CPM in RE Projects for the year 2005-2006 shall be Rs. 78.75 Crore. 7 3. Yardsticks for creation of HAG posts will be as under : (a) For Civil Engg. Department, An HAG Officer will be provided for an outlay of Rs. 231 Crores for year 2005-06. However, the second and subsequent posts of HAG will not be created in a railway merely on the basis of outlay unless required due to specific administrative requirements of a project or concentration of works in a particular area. (b) For the Accounts department, the yardstick for HAG post for year 2005-06 will be Rs. 577.5 Crores or one of the SAG posts may be operated in HAG provided minimum three SAG posts are admissible. However, for the units where there are three posts of CAOs, provision of 2 HAG posts for Accounts department is permissible irrespective of no. of admissible SAG posts. Similarly, units which are headed by GMs, one of the SAG posts may be operated in HAG, even if, the no. of admissible posts in SAG are two. (c) For HAG posts of other departments, no separate yardsticks are being Prescribed. The existing practice of operation of one post in HAG out of three or more admissible posts of SAG will continue. 4. Incase of BOT/BOLT Projects, for determining SA grade and JA Grade posts, 100% of the likely outlay during the year in the Project may be taken into account. For posts in Jr. Scale and Sr. Scale, 50% of the outlay may be taken into account. Operation of the posts should be strictly need based. All other conditions in Board’s letter no. F(E)V/95/Misc./Yardstick/5 dated 13.10.95 will remain unchanged for BOLT/BOT Schemes. 5. The yardsticks indicated above are in terms of the annual gross Outlay for all the departments except for Stores Department. In case of Stores Department, the yardsticks are in terms of the Weighted Annual Outlay :- Weighted outlay for Stores Deptt. (Con.) of a Railway = (Outlay for M&P - Cost of M&P procured through COFMOW) + (Outlay for S&T, Electrical & RE - Cost of materials procured by S&T, Electrical and RE Deptts.) + 0.6 x (Outlay for Civil Engineering Deptt. - Cost of track materials etc. procured by Civil Engg. Deptt.) 3 io sts: (a) __ In departments other than Accounts , total number of Senior Scale and Junior 3cale posts will be determined by taking these posts together and not separately. (b) (e) 10. 11. 412. 13. 14. 3+ In case of Civil, Electrical & S&T departments, the ratio of posts of SS to JS normally should be 4: 2 which can be relaxed upto maximum limit of 4: 1 depending upon the discretion of the GMs. Hence the formula to calculate these posts shall be as follows:- : No. of SS Posts x Yardstick for SS + No. of JS Posts x Yardstick for JS = Total outlay In case of Stores Department, the ratio of SS to JS posts will be 1:2. For all works, the expenditure likely to be incurred during the year should be considered for working out the required work charged ‘establishment. Mere ” availability of outlay should not be the only basis for ‘such a calculation. As regards the projects where work has to be taken up on the basis of matching contribution from the state government like ROBs, RUBs, MTP etc., outlay on ‘only such works where formal firm commitment of acceptance of the wagsks and the contribution has been confirmed, should be taken into account. Railways should not take into account outlays for the works which stand transferred to MRVC/RVNURail Tel. Only in cases where execution of a work or part thereof vests with the zonal railways, should the commensurate outlay be added for working out the number of admissible posts. In case of Deposit works, outlays are only to be reckoned provided the money has actually been received and only to the ‘extent of the expenditure likely to take place upto 31.03.06. However in some cases where the state Govt. or the agency may have given commitment even if the actual deposit is less, merits of such cases may be considered. In case of ‘turn key’ projects, 25% of the outlay should be taken for determining the admissible workcharged posts. However, ‘as a dispensation for J&K turn key projects in view of special circumstances, 50% of the outlay for SAGIJAG and 25% of outlay for SS/JS posts should be taken, subject to the condition that this provision should not result in ‘additional SAG posts than existing at present ie.on 30.6.2005 in the project. The yardsticks may not be applied separately to individual projects, some of which may be more complex and intensive supervision oriented than others, but if necessary, the same may be made applicable to a basket of projects for a railway or a unit as @ whole. It will be the responsibility of GM/PHOD to post and distribute the work taking such factors into account to ensure quality level of planning and supervision for individual works. All projects would be governed by these yardsticks. Any earlier dispensation stands withdrawn. Overall expenditure on work charged establishment should be within the D&G charges as advised vide Board's letter no. 2000/E&R/400/2 dated 20.12.2001. 2 - Contd. p/4 4 15. Details of number of posts (Department wise/ Grade wise) so created as per above guidelines and outlays for year 2005-06 (Department wise) may be furnished to E&R Directorate of Board by October, 2005. 46. This supercedes all earlier orders in this regard. This issues with the concurrence of the Finance Directorate of the Ministry of Railways. Hindi version will follow. No. 2005/E&R/400/1 New Delhi, dt. 30 .6.2005 1. FA& CAOs, All Indian Railways. 2. Dy. Comptroller and Auditor General Of India (Rlys), Room No.224, Rail Bhavan. ¥ for ft Zopy to: Addl. Member (W), Addl. Member (Elec.), Addl. Member (Sig.), Addl. Member (Tele. ) Addl. Member (Stores), Addl. Member (F), Advisor (F) CAOs(Construction), All Indian Railways “ED(Accounts), ED(RE), EDE(GC), EDF(E). E(GC) and F(E) | Branches (with 5 spares each). GOVERNMENT OF INDIA MINISTRY OF RAILWAYS ~ a RAIEWAY-BOARD No. 2000/E&R/400/2 New Delhi, Dt. 20,12 2001 The General Managers, All Indian Railways including PUs & others Sub:-Break-up of D&G charges for works of various departments i.e, Civil, RE, Elect. & S &T Departments Ref:-1. (i) Board’s letter No. 88/W-i/Genl/0/25 dt. 125.89. Gi) Board’s letter No, 85/W-3/SG/W/1/34 Vol-U dt. 26.4.90, (iii) Board’s letter no: 87/Elec.1/135/0 dt. 7.5.90, 2. Board’s letters No. 2000/E&R/400/2 dt. 12.10.2000 & No, 2000/E&R/400/4 «dt28,6.2001. ‘ . During 1989-90, Board had issued D&G charges for various departnients vide letters mentioned under Teference above. Thereafter above D&G charges were modified vide Board’s letter No: 2000/E&R/400/2 dt. 26.6.2000, which were further tightened by 10% vide letter No. 2000/E&R/400/2 dt. 12.10.2000. Further to this the D&G charges for Traftic Department were: algo issued’ vide Board’s letter dt. 28.6.2001. The break-up of supporting departments could hot be issued at that time, and the Railways were asked that the distribution of revised D&G charges between HQffield/Departments will be in same proportion as being followed ail now. ~——2-The complete break-up of D&G charges for supporting departments is now worked out and enclosed at Annexure-I, Railways are advised that these break-ups of D&G charges should be used for calculation of available D&G charges, ~ 3. The provision for Stores Department should be used by Stores Department only and should not be reallocated to any other Department. 4. While creating work charged posts in Vigilance Department within the stipulated Provision, it should be ensured that the overall strength does not increase by more than 20% of the existing strength in Vigilance department. 5. General Charges for Traffic Department:- ° 5.1 As regards the provision of General Charges for Traffic Department in Civil Engineering Projects the following guidelines may be observed:- ~ 1. The provision for the Traffic Department may be made for both planning and phased working for-such of the ‘Traffic Facility Works’, Gauge. Conversions and Doublings which generally include provision of blocks, Contd... 2/- eo ll. For MTP and New Lines, portion related to junction arranges srangements only to be provided MIP project. Mae the provision of 0.326% should be’made for the ments only ie. 0.326% ‘of the cost of junction and not 0.326% of the total cost of New Line or de for the Traflic Department under plan heads “Workshops and Sheds’ and ‘Machinery & Plant’, IIL No provision should be ma “Staff Quarters’, “Staff Amenities’, IV. For Track Renewals, Bridge Renewals other than ROBs etc, system of providing Traffic De » the present epartment officers/staff on need basis, continue, . case by case, may 5.2 As repards the provision of General Charges for Traflic Department in S&T, Electrical and RE projects involving traffic block it should be restricted to 0.3% keeping it within the overall limit of D&G charges of the concerned main Depatments, 6. It may please be noted that ‘the above General Charges (given in Annexure-1) are the maximum limit; and endeavour should be made to Testrict the actual provision to the barest minimum, * . . “ &.1 It may also be noted that with the issuance of this letter, only break-up of the existing D&G ‘Charges are circulated, and no fresh’ (new) D&G" Charges are envisaged. . . 6.2 This supercedes all Previous instructions in this regar Concurrence of the Finance Dir d; and issues with the ectorate of the Ministry of Railway YS. Hindi version will follow, 4 ' . ih Encl: Annexurer! all , , \\ 1 e Copy to:- ‘ | a 1. FA& CAQs, All Indian Railways and PUs, 2. CEs, .CSTEs, CEEs, COMs, All Indian Railways, 3 FA& CAOs(Con.)/ All Indian Railways, y i 4, FA& CAOs, Metro Calcutta, Delhit& Chennai, 5. EDF(E), Railway Board. CORE/Allahabad, ED(FinanceyRDSO i i 1 nel i . Commissioner/Railways Fol Fi t 4 ia me ANNEXURE-1I (ACCOMPANYING BOARD'S LETTER NO. 2000/E&R/400/2 Dt.20.12.2001 ) Break-Up Of General Charges ‘As Issued Vide Letter No 2000/E&R/400/2 Dt. 12.10.2000 &2000/E&R/400/4 Dt. 286.2001 SSCOOIRER/400/4 Dt. 28.6.2001 Particulars Civil Civil RE *[Electrical|Electicall S&T] S&T nano foes w/o block with block |wio block [with block 1. Establishment ° 1.1 Deptt. | Ct (@) HO. Org. ee eh mesh DL [Field Org. 5.144" | "3.370 [4.773 [5.260 | ~7.664 | 6.668 | 87a | 1.2 Audit & Accounts o.e13 [0.506 | 0.859 | 0.852 | 0848 | ~03ta—} gai 7.3 Store 0.370 | 0.242 | 044] 0892 | 0829] gare 0.415 1.4 Traffic 0.326" 0.214 * 0.300 e 0.300 [0.300 1.5 Personnel 0.109 0.071 0.107 0.107 0.106} 0.105 0.103 1.6 Medical 0.109 [0.071 [0.107 | 0.107_| 0.106 | 0.108 T0405 1.7 Vigilance 0.054 [0.036 [0.054 _| 0.053 | 0.083 | 0.052 | 0.082 (a) Total | I (ig.rounded_upto 3rd place) 7.830 [8.130 [8.370 [8730 _| 42.410 | 9.640] 43880 2.Other than Est | d | t [21Piant Const. 2 0.35 0.35 [055 J 055 [038 | 020] a0 2.2.Tempo. Accom. : 0.30 0.30 [70.20 [0.20 | 0.20 _|—0.20 | 0.20 2.3 Residential 0.40 [0.40 | 035 045 | 045] 048] 045 2.4 Contingency 0.20 ots 0.20 [0.20 | 0.20 | 020 f 0.25 | 0.25 2.5 Instrument 0.04 0.04 9.03 0.03 | 0.03 [0.08 | 0.05 2.6 Loss of CashiStore 0.07 0.04 0.02 | 0.02 | 0.02 C (b)Totai 1.30 1.30 “1.35 1.45 1.45 1.15 41.15 3. G.Total(a)+ (b) 9.13 6.43 | 9.72 10.18 13.56 10.69 14.83 * Please refer to pata 5.1(I) of covering letter. * ' ** Please refer to para 5.1(Il) of covering letter .

You might also like