wainisy of Raitways (Rall Mantralaya
(RAILWAY BOARD)
No.2007/E&R/400/1 New Delhi, Dt. 29. 6.2007
The General Managers,
All Indian Railways & others.
Sub: Yardsticks for gazetted staff in Construction Projects.
Ref: Board's letter No 2006/E&R/400/1 dated 3.7.2006
The instructions on yardsticks for Gazetted staff in Construction Projects
for the year 2006-07 were issued vide letter No.2006/E&R/400/1 dated 3.7.2006.
2. Ministry of Railways (Railway Board) has decided that for year 2007-88,
creation/extension of posts of gazetted staff in construction projects will be as per
the following guidelines:
i) The existing level of workcharged posts may be maintained and the
currencies of the posts which are expiring upto 30.6.2007 may be extended
with sanction of competent authority.
ii) After 30.6.2007, for additional work, only need based creation of workcharged
posts should be undertaken in consultation with Finance.
3. It should be kept in view that overall expenditure on work charged establishment
should be within the D&G charges as. advised vide Board's. letter no.
2000/E&R/400/2 dated 20.12.2001. All other stipulations/conditions already notified
in Board's letter no. 2005/E&R/400/1 dt. 30.6.2005 will continue.
4. This issues with the concurrence of the Finance Directorate of the Ministry of
Railways.
5. Hindi version will follow.
(S.K.Sharma)-
Executive Director, Efficiency & Research
Railway Board
No. 2007/E&R/400/1 New Delhi, dt. 29 .6.2007
4. The Principal Directors of Audit, All Indian Railways.
2. Dy. Comptroller and Auditor General Of India (Rlys), Room No.224, Rail Bhavan.
for Financial Commissioner/RailwaysGovernment of India (Bharat Sarkar)
Ministry of Railways {Rail Mantralaya)
(RAILWAY BOARD)
No.2006/E&R/400/1 New Delhi, Dt. 3 7.2008
The General Managers,
All Indian Raliways & others.
Sub: Yardsticks for gazetted staff in Construction Projects.
Ref: Board's lettey’ No 2005/E&R/400/1 dated 30.6.2005 1
The yardsticks for Gazetted staff in Construction Projects
2005-2006 were issued vide letter No.2005/E&R/400/1 dated 30.
* Not move than 1/3 posts should be operated in senior scale
@ Yarristicks shall be applied on annual gross outlay
2. Minisiry of Railways (Railway poard) hes decided that for yeer 2006-07,
creationfextension of posts of g staff in. Col projects
perthe following guidelines:
will be @s
i) The, existing level of workcharged posts may be maintained and the
ing upto 30.86.2006 may be
currencies of the posts which are expiring
extended.
ii) “After 30.6.2006, for additional work, only need based creation of
tation with Finance.
workcharged posts should be undertaken in consul
Cond. pi2
u“2.
It should be kept in view that overall expenditu
as advised vide Board's letter no.
should be within the D&G charges
2000/E&R/400/2 dated 20.12.2001. All other
in Board's letter no. 2005/E&R/400/1 dt. 30.86.2005
This issues with
Railways.
Hindi version will follow.
No. 2006/E&R/400/1
4. FA & CAOS, All Indian Railways.
2. Dy. Comptrolier and Auditor General Of India (Rlys), Room No.224,
Copy to:
Addl. Member (W), ‘Addl. Member (Elec.), Addl. Member (Sig.),
Addl.Member (Stores), Addl. Member (F),
CAOs(Construction), All Indian Railways
re on work charged establishment
stipulations/conditions already notified
will continue.
the concurrence of the Finance Directorate of the Ministry of
Rail Bhavan.
sb
for Financial Commissioner/Riys
Addl.Member (T ele.)
Advisor (AR)
ED(Accounts), ED(RE), EDE(GC), EDF(E).
E(GC) and F(E) | Branches (with 5 spares each).
WYGovernment of India (Bharat Sarkar)
Ministry of Railways (Rail Mantralaya)
(RAILWAY BOARD)
No.2005/E&R/400/1 New Delhi, Dt. 30. 6.2005
The General Managers,
All Indian Railways & others.
‘Sub: Yardsticks for gazetted staff in Construction Projects.
Ref: Board's letter No 2004/E&R/400/1 dated 22. 9.2004
‘The yardsticks for Gazetted staff in Construction Projects for the year
2004-2005 were issued vide letter No.2004/E&R/400/1 dated 22.9.2004.
~@iariisticks for the year 2004-2005 (Fig. In Crore of Rs.)
Accounts
Post Civil [Electrical Sat
including RE
4 2 3 4 5 6
ISAG 56.00 40.67__| 40.67 178.66 762.80
JAG 17.03 14.26 | 11.26 122.72 77.08
Iss 4.63 3.42 3.42 35.94 21.34"
JsiGre | 3.53 1.98 1.98 28.22
* Not more than 1/3 posts should be operated in senior scale
@ Yardsticks shall be applied on annual gross outlay
2. Ministry of Railways (Railway Board) has decided that the yardsticks for
creationfextension of posts of gazetted staff in construction projects for year 2005-
2006 _shall be as follows:-
GY ardsticks fo the year 2005-2006 (Fig. in Crore of Rs.)
Post Civil [Electrical ‘Sat Accounts
lincluding RE
4 2 3 4 5 6
ISAG. 58.80 42.70 42.70 187.80 202.44
JAG 17.88 11.82. 11.62 128.86 80.94
ss. 4.86. 3.59 3.59 37.74 2871
JS/Gr. ‘B’ 3.71 2.08 2.08 29.63 -
@ Yardsticks shall be applied on annual gross outlay
LX) es contd....pagey2-2-
Yardstick for operating the post of CPM in RE Projects for the year 2005-2006 shall
be Rs. 78.75 Crore. 7
3. Yardsticks for creation of HAG posts will be as under :
(a) For Civil Engg. Department, An HAG Officer will be provided for an outlay of Rs.
231 Crores for year 2005-06. However, the second and subsequent posts of HAG
will not be created in a railway merely on the basis of outlay unless required due to
specific administrative requirements of a project or concentration of works in a
particular area.
(b) For the Accounts department, the yardstick for HAG post for year 2005-06 will
be Rs. 577.5 Crores or one of the SAG posts may be operated in HAG provided
minimum three SAG posts are admissible. However, for the units where there are
three posts of CAOs, provision of 2 HAG posts for Accounts department is
permissible irrespective of no. of admissible SAG posts. Similarly, units which are
headed by GMs, one of the SAG posts may be operated in HAG, even if, the no. of
admissible posts in SAG are two.
(c) For HAG posts of other departments, no separate yardsticks are being
Prescribed. The existing practice of operation of one post in HAG out of three or
more admissible posts of SAG will continue.
4. Incase of BOT/BOLT Projects, for determining SA grade and JA Grade posts,
100% of the likely outlay during the year in the Project may be taken into account.
For posts in Jr. Scale and Sr. Scale, 50% of the outlay may be taken into account.
Operation of the posts should be strictly need based. All other conditions in Board’s
letter no. F(E)V/95/Misc./Yardstick/5 dated 13.10.95 will remain unchanged for
BOLT/BOT Schemes.
5. The yardsticks indicated above are in terms of the annual gross Outlay for all
the departments except for Stores Department. In case of Stores Department, the
yardsticks are in terms of the Weighted Annual Outlay :-
Weighted outlay for Stores Deptt. (Con.) of a Railway
= (Outlay for M&P - Cost of M&P procured through COFMOW)
+ (Outlay for S&T, Electrical & RE - Cost of materials procured by S&T,
Electrical and RE Deptts.)
+ 0.6 x (Outlay for Civil Engineering Deptt. - Cost of track materials etc.
procured by Civil Engg. Deptt.)
3 io sts:
(a) __ In departments other than Accounts , total number of Senior Scale and Junior
3cale posts will be determined by taking these posts together and not separately.(b)
(e)
10.
11.
412.
13.
14.
3+
In case of Civil, Electrical & S&T departments, the ratio of posts of SS to JS
normally should be 4: 2 which can be relaxed upto maximum limit of 4: 1
depending upon the discretion of the GMs. Hence the formula to calculate these
posts shall be as follows:- :
No. of SS Posts x Yardstick for SS + No. of JS Posts x Yardstick for JS
= Total outlay
In case of Stores Department, the ratio of SS to JS posts will be 1:2.
For all works, the expenditure likely to be incurred during the year should be
considered for working out the required work charged ‘establishment. Mere
” availability of outlay should not be the only basis for ‘such a calculation.
As regards the projects where work has to be taken up on the basis of matching
contribution from the state government like ROBs, RUBs, MTP etc., outlay on
‘only such works where formal firm commitment of acceptance of the wagsks and
the contribution has been confirmed, should be taken into account.
Railways should not take into account outlays for the works which stand
transferred to MRVC/RVNURail Tel. Only in cases where execution of a work or
part thereof vests with the zonal railways, should the commensurate outlay be
added for working out the number of admissible posts.
In case of Deposit works, outlays are only to be reckoned provided the money
has actually been received and only to the ‘extent of the expenditure likely to take
place upto 31.03.06. However in some cases where the state Govt. or the
agency may have given commitment even if the actual deposit is less, merits of
such cases may be considered.
In case of ‘turn key’ projects, 25% of the outlay should be taken for determining
the admissible workcharged posts. However, ‘as a dispensation for J&K turn key
projects in view of special circumstances, 50% of the outlay for SAGIJAG and
25% of outlay for SS/JS posts should be taken, subject to the condition that this
provision should not result in ‘additional SAG posts than existing at present ie.on
30.6.2005 in the project.
The yardsticks may not be applied separately to individual projects, some of
which may be more complex and intensive supervision oriented than others, but
if necessary, the same may be made applicable to a basket of projects for a
railway or a unit as @ whole. It will be the responsibility of GM/PHOD to post and
distribute the work taking such factors into account to ensure quality level of
planning and supervision for individual works.
All projects would be governed by these yardsticks. Any earlier dispensation
stands withdrawn.
Overall expenditure on work charged establishment should be within the D&G
charges as advised vide Board's letter no. 2000/E&R/400/2 dated 20.12.2001.
2 - Contd. p/44
15. Details of number of posts (Department wise/ Grade wise) so created as per
above guidelines and outlays for year 2005-06 (Department wise) may be
furnished to E&R Directorate of Board by October, 2005.
46. This supercedes all earlier orders in this regard.
This issues with the concurrence of the Finance Directorate of the Ministry of
Railways.
Hindi version will follow.
No. 2005/E&R/400/1 New Delhi, dt. 30 .6.2005
1. FA& CAOs, All Indian Railways.
2. Dy. Comptroller and Auditor General Of India (Rlys), Room No.224, Rail Bhavan.
¥ for ft
Zopy to:
Addl. Member (W), Addl. Member (Elec.), Addl. Member (Sig.), Addl. Member (Tele. )
Addl. Member (Stores), Addl. Member (F), Advisor (F)
CAOs(Construction), All Indian Railways
“ED(Accounts), ED(RE), EDE(GC), EDF(E).
E(GC) and F(E) | Branches (with 5 spares each).GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
~ a RAIEWAY-BOARD
No. 2000/E&R/400/2 New Delhi, Dt. 20,12 2001
The General Managers,
All Indian Railways including
PUs & others
Sub:-Break-up of D&G charges for works of various departments i.e, Civil, RE,
Elect. & S &T Departments
Ref:-1. (i) Board’s letter No. 88/W-i/Genl/0/25 dt. 125.89.
Gi) Board’s letter No, 85/W-3/SG/W/1/34 Vol-U dt. 26.4.90,
(iii) Board’s letter no: 87/Elec.1/135/0 dt. 7.5.90,
2. Board’s letters No. 2000/E&R/400/2 dt. 12.10.2000 & No,
2000/E&R/400/4 «dt28,6.2001. ‘ .
During 1989-90, Board had issued D&G charges for various departnients vide
letters mentioned under Teference above. Thereafter above D&G charges were
modified vide Board’s letter No: 2000/E&R/400/2 dt. 26.6.2000, which were further
tightened by 10% vide letter No. 2000/E&R/400/2 dt. 12.10.2000. Further to this the
D&G charges for Traftic Department were: algo issued’ vide Board’s letter dt.
28.6.2001. The break-up of supporting departments could hot be issued at that time,
and the Railways were asked that the distribution of revised D&G charges between
HQffield/Departments will be in same proportion as being followed ail now.
~——2-The complete break-up of D&G charges for supporting departments is now
worked out and enclosed at Annexure-I, Railways are advised that these break-ups
of D&G charges should be used for calculation of available D&G charges, ~
3. The provision for Stores Department should be used by Stores Department
only and should not be reallocated to any other Department.
4. While creating work charged posts in Vigilance Department within the
stipulated Provision, it should be ensured that the overall strength does not increase by
more than 20% of the existing strength in Vigilance department.
5. General Charges for Traffic Department:-
°
5.1 As regards the provision of General Charges for Traffic Department in Civil
Engineering Projects the following guidelines may be observed:-
~
1. The provision for the Traffic Department may be made for both planning and
phased working for-such of the ‘Traffic Facility Works’, Gauge. Conversions and
Doublings which generally include provision of blocks,
Contd... 2/-eo ll. For MTP and New Lines,
portion related to junction arranges
srangements only to be provided
MIP project. Mae
the provision of 0.326% should be’made for the
ments only ie. 0.326% ‘of the cost of junction
and not 0.326% of the total cost of New Line or
de for the Traflic Department under plan heads
“Workshops and Sheds’ and ‘Machinery & Plant’,
IIL No provision should be ma
“Staff Quarters’, “Staff Amenities’,
IV. For Track Renewals, Bridge Renewals other than ROBs etc,
system of providing Traffic De
» the present
epartment officers/staff on need basis,
continue, .
case by case, may
5.2 As repards the provision of General Charges for Traflic Department in
S&T, Electrical and RE projects involving traffic block it should be restricted to 0.3%
keeping it within the overall limit of D&G charges of the concerned main Depatments,
6. It may please be noted that ‘the above General Charges (given in Annexure-1)
are the maximum limit; and endeavour should be made to Testrict the actual provision
to the barest minimum, * . .
“
&.1 It may also be noted that with the issuance of this letter, only break-up of
the existing D&G ‘Charges are circulated, and no fresh’ (new) D&G" Charges are
envisaged. . .
6.2 This supercedes all
Previous instructions in this regar
Concurrence of the Finance Dir
d; and issues with the
ectorate of the Ministry of Railway
YS.
Hindi version will follow, 4
'
. ih
Encl: Annexurer! all
, , \\ 1
e Copy to:- ‘ |
a 1. FA& CAQs, All Indian Railways and PUs,
2. CEs, .CSTEs, CEEs, COMs, All Indian Railways,
3 FA& CAOs(Con.)/ All Indian Railways, y i
4, FA& CAOs, Metro Calcutta, Delhit& Chennai,
5. EDF(E), Railway Board.
CORE/Allahabad, ED(FinanceyRDSO
i
i 1
nel
i . Commissioner/Railways
Fol Fi
t 4 iame
ANNEXURE-1I
(ACCOMPANYING BOARD'S LETTER NO. 2000/E&R/400/2 Dt.20.12.2001 )
Break-Up Of General Charges ‘As Issued Vide Letter No 2000/E&R/400/2 Dt. 12.10.2000
&2000/E&R/400/4 Dt. 286.2001
SSCOOIRER/400/4 Dt. 28.6.2001
Particulars Civil Civil RE *[Electrical|Electicall S&T] S&T
nano foes w/o block with block |wio block [with block
1. Establishment °
1.1 Deptt. | Ct
(@) HO. Org. ee eh mesh DL
[Field Org. 5.144" | "3.370 [4.773 [5.260 | ~7.664 | 6.668 | 87a |
1.2 Audit & Accounts o.e13 [0.506 | 0.859 | 0.852 | 0848 | ~03ta—} gai
7.3 Store 0.370 | 0.242 | 044] 0892 | 0829] gare 0.415
1.4 Traffic 0.326" 0.214 * 0.300 e 0.300 [0.300
1.5 Personnel 0.109 0.071 0.107 0.107 0.106} 0.105 0.103
1.6 Medical 0.109 [0.071 [0.107 | 0.107_| 0.106 | 0.108 T0405
1.7 Vigilance 0.054 [0.036 [0.054 _| 0.053 | 0.083 | 0.052 | 0.082
(a) Total | I
(ig.rounded_upto 3rd place) 7.830 [8.130 [8.370 [8730 _| 42.410 | 9.640] 43880
2.Other than Est | d | t
[21Piant Const. 2 0.35 0.35 [055 J 055 [038 | 020] a0
2.2.Tempo. Accom. : 0.30 0.30 [70.20 [0.20 | 0.20 _|—0.20 | 0.20
2.3 Residential 0.40 [0.40 | 035 045 | 045] 048] 045
2.4 Contingency 0.20 ots 0.20 [0.20 | 0.20 | 020 f 0.25 | 0.25
2.5 Instrument 0.04 0.04 9.03 0.03 | 0.03 [0.08 | 0.05
2.6 Loss of CashiStore 0.07 0.04 0.02 | 0.02 | 0.02 C
(b)Totai 1.30 1.30 “1.35 1.45 1.45 1.15 41.15
3. G.Total(a)+ (b) 9.13 6.43 | 9.72 10.18 13.56 10.69 14.83
* Please refer to pata 5.1(I) of covering letter. *
'
** Please refer to para 5.1(Il) of covering letter .