CEMENTING
71
Squeeze Cementing:
A common method for repairing faulty primary casing jobs or performing
remedial operations on the hole is squeeze cementing. Major applications:
-supplement a faulty primary casing cement job,
-reduce water-oil, water-gas and gas-oil ratio
-repair casing leaks,
-stop lost circulation in an open hole while drilling
-bring a well under control.
Placement techniques and slurry design are important considerations
squeeze operations. Supplementing a faulty or ineffective primary casing cement
job is the most prominent application for squeeze cementing.
Cement Characteristics
The cement slurry pumped into oil and gas wells includes cement, special
additives and water. Portland cement is most commonly used. The additives are
used to control characteristics such as thickening time, density and compressive
strength. Water is an important agent in the cementing.
Portland Cement:
Portland cement is manufactured by calcining limestone, clay, shale, and
slag together at 2000-2600 oF in a rotary kiln. The resulting material, clinker, is
cooled and inters ground with small percentages of gypsum to form Portland
cement. In addition to the raw materials, other components such as sand, bauxite,
72
and iron oxide may be added to adjust the chemical composition of the clinker for
the different types of Portland cement. The principal components of the finished
Portland cement are lime, silica, alumina, and iron. Each component affects the
slurry in a different manner. When water is added to cement, setting and
hardening reactions begin immediately. The chemical compounds in the cement
undergo hydration and re-crystallization, resulting in a set product. The API has
established a classification system for cements used in oil and gas operations.
Slurry Features
Variables involved in the design of the slurry include:
yield, density, mix water, thickening time, compressive strength, fluid loss
and downhole temperature.
-The yield of the cement in cubic ft per sack, is the volume of space that will
be occupied by the dry cement, water and additives when the slurry is mixed
according to design specifications. A major factor affecting the slurry yield is
the density, since water must be added in significant volumes to achieve low
weight cements that will not fracture shallow, weak zones.
-The density of cement is an important design criterion. It must be sufficient
to prevent kick and blow-outs yet it should not cause lost circulation.
-The mixing water requirements will vary, depending primarily on cement class
and slurry density. Most cement jobs use well site water. Quality of mixing water
is an important parameter in cement planning. The hydration and curing of the
73
slurry will react differently with varying amounts of salt, calcium, or magnesium
the mix water.
-Thickening time is the amount of time that cement remains pumpable with
reasonable pressures. This is the perhaps the most critical property in the
displacement process. Factors affecting the thickening time include cement
composition and temperature. The compressive strength is measured in pounds
per
square inch.
decrease.
-Fluid loss is the water lost from the slurry to the formation during slurry
placement operations. If a large volume of water is lost, the slurry becomes too
viscous or dense to pump. Neat cement, or cement with no special additives has
a fluid loss rate in excess of 1000 cc/30 min.
Good control
Moderate control
Fair control
No control
74
Cement Additives
Neat slurry is a mixture of water and cement only. Special chemicals are
often added to the slurry to achieve some desired purposes. These additives are:
F.
Density Adjusters: High formation pressures for neat slurry densities require
additions in cement density. Formations with low fracture gradients require
reductions in cement weight. Dispersants as an additive can increase slurry
75
densities to 17.5 ppg due to their effect on viscosity. Adding more water to the
slurry and adding materials to prevent solid separation achieve density
reductions.
Dispersants: Dispersants provide several beneficial features for the slurry.
-reduce slurry viscosity
-allow slurry turbulence at lower pump rates
-assist in providing fluid loss control for densified slurries
Fluid Loss Additives: Fluid loss agents are used in cement slurries for the
following reasons:
-minimize cement dehydration in the annulus
-reduce gas migration
-improve bonding
-minimize formation damage.
Slurry Design
A well plan is not complete until the cement slurry has been designed.
Major aspects of the design are as follows:
-Volumetric requirements for the casing and annulus
-cement
-mixing water
-density selection
76
Example 4-1
Calculate the weight, percent mix and yield or set volume of a slurry given?
Water-cement ratio = 5.5 gal/sx
Spec. Grav. of cement = 3.14
1 sx = 1 cu ft = 94 lb
Density of water = 8.34 ppg
Solution:
77
Slurry weight = (lb cement + lb water + lb additive) / (gal cement + gal water +
gal additive)
Slurry weight = [(94 lb/sx + (5.5 gal/sx x 8.33 lb/gal)] / [(94 lb/sx / 8.33 lb/gal x
3.14) + 5.5 gal/sx]
Slurry weight = 15.4 lb/gal
Yield = (gal cement + gal water + gal additive) / 7.48 gal/cu ft
Yield = [(94 lb/sx / 8.33 lb/gal x 3.14) + 5.5 gal/sx] / 7.48 gal /cu ft
Yield = 1.215 cu ft
Absolute Volume, gal = (lb of material) / (8.34 lb/gal x spec. grav. of material)
Absolute Volume = 94 lb/sx / (8.34 lb/gal x 3.14)
Absolute Volume = 3.6 gal/sx
Percent Mix = (5.5 gal/sx x 8.34 lb/gal x 100) / 94 lb/sx
Percent Mix = 48.8 % by weight of cement
Example 4-2
Calculate the number of sacks of cement and bentonite required to obtain
cement returns on surface casing.
Volume of 9 5/8 inch 40 lb/ft casing = 0.4256 cuft / lin ft
Class-A cement with 4 % gel
Water-cement ratio = 7.73 gal/sx
Slurry weight = 14.10 lb/sx
78
Solution:
Cement left in casing = 30 ft
0.4256 cu ft / ft
0.3469 cu ft / ft
1.35
94 lb/sx = 40890 lb
Cement planning involves evaluating and selecting equipment to be used with the
cementing process. The down-hole equipment includes shoes and collars that are run as
integral sections of the casing string. In addition, many cementing aids attached to the
exterior of the pipe may be used, i.e., centralisers, scratchers and cement baskets.
Casing Shoe: A casing shoe is a short, heavy walled pipe run on the bottom of the
casing string. It has a rounded nose to guide the casing into the hole. The shoe is
screwed on the casing and generally is glued with a thread-locking compound. Casing
shoes are generally available in three types.
79
i) guide shoe; ii) float shoe and iii) differential fill shoe.
A guide shoe contains an orifice through the centre that allows mud to pass
freely. A float shoe contains a back pressure valve that prevents mud from flowing into
80
the casing from the bottom yet allows fluid to be pumped through the shoe. Float valve
prevents surface casing pressure resulting from cement U-tubing. The driller must fill,
or partially fill, the casing with mud periodically to prevent casing collapse as the
annulus hydrostatic pressure increases with depth. Differential fill shoe are similar in
concept to float shoes.
Collars: A cementing collar is typically run as an integral part of the string and is
placed at the top of the first or second casing joint. The collar serves as a stop for the
cement wiper plug so that all the cement is not inadvertently pumped completely out of
the casing and into the annulus. Multi-stage cementing requires special collars with
sliding sleeves and ports. The sleeves are usually closed during the primary stage of
cementing. The sleeves are activated with either the free-fall or displacement
methods.
81
Centralizers: Centralizers are placed on the exterior of the casing string to provide
stand-off distance between the well bore and the pipe in an effort to assist in
attaining cement encirclement of the pipe. Numerous types of centralizers are
available. The bow spring type is most common.
Scratchers: To achieve an effective cement job, the slurry must bond to the
formation. Scratchers assist by scraping and scratching the mud cake on the formation
to promote bonding to the virgin formation.
Cement Baskets: Cement baskets provide support for the column of cement while it
cures, or hardens. The baskets are often placed above lost circulation zones that
cannot support a full column of cement.
Plugs: The cement slurry is normally separated from the mud column by plugs that
minimise interface contamination. The bottom plug has a diaphragm that is ruptured
with pump pressure after it seats on the collar or shoe. The top plug has a solid
aluminium insert. The plugs are mounted in a cementing head at the top of the casing.
82
Displacement Process
Pumping the cement into the annulus is an important to the successful cementing
program as the slurry design. The displacement rate affects the flow regime in the
annulus. High flow rates convert the flow regime from laminar to turbulent. Although
annular turbulent flow is not desirable in most drilling operations, it is desirable in
cementing operations because it erodes the mud cake on the formation. Contamination
of the interface between the mud and cement is a problem that can reduce the
effectiveness of the cement job. This problem can be controlled by separating the mud
and cement with a spacer fluid (Figure 4-4, 4-5).
83
Figure 4-4 Diagram of a casing cementing job (Courtesy World Oils Cementing
Handbook)
84
Figure 4-5 Equipment typically used to install and cement a drilling liner
(Courtesy BJ-Hughes Services)
85
Figure 4-6 Setting and cementing casing (Courtesy Oil & Gas Journal)
86
11.Pump until sharp pressure increase is noted on pump truck gauge, indicating top plug
has bumped.
Step 12-16 is for stage cementing.
12.Drop bomb, open ports.
13.Circulate any excess cement around the stage tool.
14.Wait at least 6 hr. for cement to gain initial strength.
15.Mix second stage cement and displace until all cement is mixed and in casing.
16.Release top closing plug and displace until a sharp increase is noted on the pump
truck gauge, indicating the plug has bumped.
17.Release pressure to determine if single stage or stage tool is holding.
87
Example 4-3
Assume that a 10000-ft well is in an area where the geothermal gradient is 1.8
o
F/100 ft. Determine the bottom hole temperature (BHT) if the ambient temperature
is 70 oF.
Solution:
BHT = (D / 100 x G) + TA
BHT = (10000 / 100 x 1.8) + 70
BHT = 250 oF
Figure 4-7 Cementing plugs: (a) top and (b) bottom plugs (Courtesy World Oils
Cementing Handbook)
88
Example 4-4
A cementing engineer was preparing to runcompressive strength tests on a
cement slurry prior to upcoming casing job. The following data wre available from the
logging engineer. The well had been circulated for 6 hr prior to logging.
Run No
1
2
3
Temp. oF
220
225
228
Solution:
TD = time after circulation / (time of circulation + time after circulation)
Run 1, TD = 7 / (6 + 7) = 0.538
Run 2, TD = (7 + 4.5) / (6 + 7 + 4.5) = 0.657
Run 3, TD = (7 + 4.5 + 8) / (6 + 7 + 4.5 + 8) = 0.765
Plot the data and extrapolate to a BHST of 235 oF.
89
Example 4-5
A 7
5/8
surface casing set at 2000 ft. The bottom of the 9 inch hole is at 9100 ft (casing
seat). Compute the volume of casing and annulus. A 6 inch
be used to pump the cement plg against the float shoe. If the pump operates at 90 %
efficiency, how many strokes will be required? After the job was completed, the
drilling engineer at the well site observed that 1990 strokes were required to bump the
plug. What is the actual pump efficiency?
Solution:
7 5/8 inch pipe capacity = 0.2394 cu ft / lin ft; 0.0426 bbl / lin ft
7
5/8
in.
5/8
in.
5/8
in.
5/8
in.
90
100 = 85.4 %
Example 4-6
A 3000 ft 13 3/8 inch surface casing is to be cemented in a 17.5 inch hole. The
1000 ft tail slurry is 14.2 lb/gal Class-A cement with 4 % gel.The remaining lead slurry
is 12.2 lb/gal Class-A cement with 16 % gel. Use 100 % volumetric wash out. Compute
the cement, water and gel requirements.
Solution:
The annulus volume is computed as:
0.6946 cu ft / lin ft
2000 ft = 1389.2 cu ft
0.6946 cu ft / lin ft
1000 ft = 694.6 cu ft
2 = 2778.4 cu ft
2 = 1389.2 cu ft
91
Gel: (1089.5 sx) (16 % gel) (94 lb/sx) = 16386 lb gel = 163.86 sx of gel
Water : 14.7 gal/sx x 1089.5 sx = 16015 gal = 381 bbl
Tail slurry calculations are as follows:
Cement: 1389.2 cu ft / (1.52 cu ft / sx) = 913.9 sx of cement
Gel: (913.9 sx) (4 % gel) (94 lb/sx) = 3436 lb gel = 34.4 sx of gel
Water : (913.9 sx) x 7.57 gal/sx = 6918 gal = 164.7 bbl
Class-A
-Used at a depth range of 0 6000 ft.
-Used at a temperature of up to 170 oF.
-Intended for use when special properties are not required; well conditions permit.
-Economical compared with premium cements.
Class-B
-Used at a depth range of 0 6000 ft.
-Used at a temperature of up to 170 oF.
-Intended for use when moderate to high sulfate resistance is required; well conditions
permit.
-Economical compared with premium cements.
92
Class-C
-Used at a depth range of 0 6000 ft.
-Used at a temperature of up to 170 oF.
-Intended for use when early strength is required; its special properties are required.
-High in tricalcium silicate.
Class-D & E
-Class-D is used at a depth range of 6000 10000 ft.
-Class-E is used at a depth range of 10000 14000 ft.
-Class-D is used at a temperature of 170 oF to 260 oF.
-Class-E is used at a temperature of 170 oF to 290 oF.
-Intended for use when moderately high temperature and high pressure are
encountered; its special properties are not required.
-Available in types that exhibit regular and high resistance to sulfate.
-Retarded with an organic compound, chemical composition and grind.
-More expensive than Portland cement.
Class-F
-Used at a depth range of 10000 16000 ft.
-Used at a temperature of 230 oF to 320 oF.
-Intended for use when extremely high temperature and high pressure are
encountered; its special properties are not required.
-Available in types that exhibit moderate and high resistance to sulfate.
93
Class-G & H
-Used at a depth range of 0 8000 ft.
-Used at a temperature up to 200 oF without modifiers. A basic cement compatible with
accelerators or retarders.
-Useable over the complete range of classes A to E with additives.
Class-J
-Used at a depth range of 12000 16000 ft.
-Used at a temperature of 170 oF to 320 oF without modifiers.
-Useable with accelerators and retarders.
-Will not set at temperature less than 150 oF if used as a neat slurry.
C3 S
C2 S
C3A
C4AF
Fineness
Sq cm/g
53
47
70
24
32
10
8
3
3
8
12
13
1500-1900
D
G
H
J
26
52
52
53.8
54
32
32
-
2
8
8
8.8
12
12
12
1500-1900
20002400
1100-1500
1400-1600
1200-1400
94
12402480
Water /
Cement
0.46
0.46
0.56
0.38
0.44
0.38
0.44
Mix Water
Gal /s x
Slurdy density
Ppg
Slurry yield
Cuft / sx
Thicken.
Time
113 oF, hr
Comp.
Streng.
110 oF, psi
A
C
G
H
5.2
6.3
5.0
4.3
15.6
14.8
15.8
16.5
1.18
1.32
1.15
1.05
2
1
1
2
4000
2700
3000
3700
8
12
24
80 oF
203
750
1570
100 oF
1100
1710
2720
120 oF
2320
2600
3740
140 oF
2235
3420
4580
160 oF
2900
4150
5190
Mixing Water
gal/sx
5.18
7.57
9.96
12.4
14.7
Slurry Density
lb/gal
15.7
14.2
13.3
12.6
12.2
95
Slurry Volume
cu ft /sx
1.17
1.52
1.86
2.21
2.55