Introduction to Supply Chain


Management
Discussion Questions
Question 1
Pick any car model manufactured by a domestic auto maker. For example, consider the
2002 Ford Thunderbird.
a. The supply chain for a car typically includes the following components:
1. Suppliers for raw materials
2. Suppliers for parts and subsystems
3. Automobile manufacturer (Ford, in this example). Within a company, there are also
dierent departments, which constitute the internal supply chain:
i. Purchasing and material handing
ii. Manufacturing
iii. Marketing, etc.
4. Transportation providers
5. Automobile dealers
b. Many rms are involved in the supply chain.
1. Raw material suppliers. For instance, suppliers for steel, rubber, plastics, etc.
2. Parts suppliers. For instance, suppliers for engines, steering wheels, seats, and electronic components, etc.
3. Automobile manufacturer. For instance, Ford.
4. Transportation providers. For instance, shippers, trucking companies, railroads, etc.
5. Automobile dealers. For example, Hayward Ford.
c. All companies involved in the supply chain want to maximize their respective prots
by increasing revenue and decreasing cost. However, companies may employ dierent
2

strategies in order to achieve this goal. Some of them focus on customer satisfaction
and quick delivery, while others may be more concerned about minimizing inventory
holding costs.
d. In general, dierent parts of the supply chain have objectives that are not aligned with
each other.
1. Purchasing: Stable order quantities, exible delivery lead times and little variation
in mix.
2. Manufacturing: Long production runs, high quality, high productivity and low production costs.
3. Warehousing: Low inventory, reduced transportation costs and quick replenishment
capability.
4. Customers: Short order lead times, a large variety of products and low prices.
Typically, the automobile dealer would like to oer a variety of car colors and congurations to accommodate dierent customer preferences, and meanwhile have a short
delivery lead time from the manufacturer. However, in order to maximize the length of
production runs, and utilize resources more eciently, the manufacturer would like to
aggregate orders from dierent dealers and oer less variety in car congurations. This
is a clear example of conicting marketing and manufacturing goals.

Question 2
a. The supply chain for a consumer mortgage oered by a bank may involve various components:
1. Marketing companies that handle solicitation to potential customers.
2. Credit reporting agencies that evaluate potential customers.
3. The bank that extends the mortgage loans.
4. Mortgage brokers through which the loans are distributed.
b. The marketing companies strive to increase the response rate from homebuyers in order
to maximize their returns. Banks aim at a customer portfolio with a relatively low risk,
healthy ow of payments and low average loan maturity date. The brokers would like
to maximize their sales commissions.
c. Similar to product supply chains, the objective of a service supply chain is to provide
what is needed (in this case a particular type of service, rather than a physical product)
at the right location, at the right time, and in a form that conforms to customer requirements while minimizing systemwide costs. However, there are a number of dierences
between the two types of supply chains. For instance:
1. In a product supply chain, there is both a ow of information and physical products.
In a service supply chain, it is primarily information.
2. Contrary to a service supply chain, transportation and inventory are major cost
components in a product supply chain.
3

3. Services typically cannot be held in inventory, so matching capacity with demand is


frequently more important in a service supply chain.
4. In a service supply chain, the (explicit) cost of information is higher than in a product
supply chain. Note that in the mortgage example above, the bank has to compensate
the credit reporting agency for each credit report it obtains.

Question 3
Many supply chains evolve over time. For example, consider a memory chip supply chain.
Production strategies may change during dierent stages of the product life cycle. When
a new memory chip is introduced, price is high, yield is low, and production capacity
is tight, and the availability of the product is important. Consequently, production is
usually done at plants close to markets, and the management focuses on increasing yield,
reducing the number of production disruptions, and fully utilizing capacity. When the
product matures, however, its price drops and demand is stabilized for a period of time,
so minimizing production cost moves to center stage. To reduce costs, production may be
outsourced to overseas foundries, where labor and materials are much cheaper.

Question 4
A vertically integrated company aims at tighter interaction among various business components, and frequently manages them centrally. Such a structure helps to achieve systemwide goals more easily by removing conicts among dierent parts of the supply chain
through central decision making. In a horizontally integrated company, there is frequently
no benet in coordinating the supply chains of each business within the company. Indeed,
if every business specializes in its core function, and operates optimally, an overall global
optimum may be approached.

Question 5
Eective supply chain management is also important for vertically integrated companies.
In such an organizational structure, various business functions are handled by dierent
departments of the company that usually have dierent internal objectives, and these
objectives are not necessarily aligned with each other. This may be due to lack of communication among departments or the incentives provided by the upper management. For
instance, if the sales department is evaluated based on revenue only, and the manufacturing
department is evaluated based on cost only, the companys prot may not be maximized
globally. Eective supply chain management is still necessary to achieve globally optimal
operations.

Question 6
The sources of uncertainty in this example include:
1. Factors such as weather conditions, diseases, natural disasters cause uncertainty in
availability of raw materials, i.e., peach crop.
2. Uncertain lead times during transportation of crop from the eld to the processing
facility may aect the quality of peaches, e.g., they may get spoiled.
4

3. Processing times in the plant, as well as the subsequent warehousing and transportation
times are subject to uncertainty.
4. Demand is not known in advance.

Question 7
A small number of centrally located warehouses allows a rm to take advantage of risk
pooling in order to increase service levels and decrease inventory levels and costs. However,
outbound transportation cost is typically higher, and delivery lead times are longer. On
the other hand, by building a larger number of warehouses closer to the end customers, a
rm can decrease outbound transportation costs and delivery lead times. However, this
type of system will have increased total inventory levels and costs, decreased economies of
scale, increases warehousing expenses, and potentially increased inbound transportation
expenses.

Question 8
The choice of the particular transportation service depends largely on the types and sizes
of products the company wants to transport, the inventory and delivery strategies and the
need for exibility:
1. A truckload carrier is better if delivering bulky items or small items in large and stable
quantities from warehouses to demand points (stores). A good example is the delivery
of groceries from warehouses to supermarkets. Note that in this case we would like the
demand to be in increments of full truck loads.
2. A package delivery rm is more appropriate if relatively small items are delivered from
the manufacturer/warehouse directly to the customers. Additionally, a package carrier
company oers more exibility by dierent modes of transportation depending on the
needs of the individual customers.

Question 9
1. High inventory levels
i. Advantages: High ll rate (service level) and quick order fulllment.
ii. Disadvantages: High opportunity cost of capital tied in inventory, danger of price
declines over time and obsolescence, need for more warehouse space.
2. Low inventory levels
i. Advantages: Low inventory holding and warehousing costs.
ii. Disadvantages: Higher risk of shortages and lower service levels.

Case Discussion Questions Meditech Surgical


Question 1
Meditech experiences poor service levels for new products, and inventory levels higher than
necessary for all products.

Question 2
There are many causes for these problems:
1. Demand is not studied in detail.
2. Information systems that record and monitor demand and inventory are poorly designed.
3. Forecasting errors are not tracked.
4. There is a tendency to shift the blame to the customers, e.g., panic ordering.
5. There are built-in delays and monthly buckets in the planning system.
6. The planning system amplies small variations in demand.
7. Poor communication with customers; Meditech doesnt typically see end-customer demand.

Question 3
The customer service manager is directly exposed to the complaints from the customers.
Hence, he is in a good position to gauge the scope of the problems. Other managers do
not face the customers, and they do not necessarily focus on their satisfaction.

Question 4
1. Recognize that demand is predictable, and establish better forecasting systems and
accountability for forecasts.
2. Institute better planning systems to eliminate planning delays; reduce the size of system
time buckets.
3. Alternatively, put assembly within the pull system and eliminate bulk inventory completely.
4. Develop and implement better information systems.
5. Improve communications with customers.

Chapter 2

Logistics Network Configuration


Discussion Questions
Question 1
The factors that aect the performance of the logistics network are not static, i.e., they
change over time. These factors include demand, product design, various costs in the
logistics network, regulations, contracts, etc. The eects of these dynamics need to be
evaluated periodically in order to determine whether the existing conguration is still
satisfactory given the new operating environment.
For instance, service level requirements may change due to increased competition which
typically means that the lead time to fulll customer orders needs to be shortened. This
may require the rm to redesign its logistic network and build new warehouses that are
closer to the end customers.

Question 2
The design of the logistics network is a strategic decision that has long lasting eects and
impacts all functions within the company. For the success of such a project, many levels
of the organization must be involved:
1. Upper Management: The new design must be aligned with the vision and strategic goals
of the company. Additionally, such a project may be costly, so management buy-in is
essential to ensure that sucient resources are devoted to the project.
2. Sales and Marketing: Demand forecasts and anticipated changes in product design and
oerings aect the network and need the involvement of sales and marketing teams.
3. Manufacturing and Operations: The logistics network design has obvious impact on dayto-day operation of the rm. In order for the implementation to succeed, it is essential
that the people involved with operating the system on a daily basis are involved in its
design.

Question 3
The decision that a single warehouse will be built has been made up-front. Therefore, we
only need to focus on the location and capacity of the warehouse, and determine how much
7

space should be allocated to each product in the warehouse. The main steps of the analysis
are outline below.
1. Data collection
i. Location of retail stores, existing warehouses (5 warehouses located in Atlanta,
Boston, Chicago, Dallas and Los Angeles), manufacturing facilities (a single manufacturing facility in San Jose), and suppliers.
ii. Candidate locations for the new warehouse.
iii. Information about products, i.e., their sizes, shapes and volumes.
iv. Annual demand (past actuals and future estimates) and service level requirements
of the retail stores.
v. Transportation rates by available modes.
vi. Transportation distances from candidate warehouse locations to retail stores.
vii. Handling, storage and xed costs associated with warehousing. Fixed costs should
be expressed as a function of warehouse capacity.
viii. Fixed ordering costs, order frequencies and sizes by product or product family.
2. Data aggregation. Demand needs to be aggregated based on distribution patterns
and/or product types. Replace aggregated demand data points by a single customer.
3. Mathematical model building.
4. Model validation based on existing network structure.
5. Selection of a few low cost alternatives based on the mathematical model.
i. For the nal decision, incorporate qualitative factors that were disregarded in the
mathematical model, e.g., specic regulations, environmental factors, etc.
ii. Optionally, build a detailed simulation model to evaluate these low cost candidate
solutions.
6. Decide where to locate the centralized warehouse.
With the centralized warehouse, service level will increase (less stock-outs) and inventory holding costs will decrease due to risk pooling. Also, xed costs associated with warehousing will typically decrease, and inbound transportation costs from the manufacturing
facility to the warehouse should be less than the sum of the previous inbound transportation costs. However, we will incur increased outbound transportation costs from the central
warehouse to the retailers. In summary, the essential design trade-o is between transportation costs on one hand, and inventory holding costs and service level requirements on
the other.

Question 4
a. In automobile manufacturing, cars are usually delivered over land, and demand is concentrated around major cities. Therefore, we would expect warehouses in this industry
to be located near large cities with easy access to freeways and railroads. This would
help to reduce the delivery lead time to dealerships in the cities.
8

b. In the pharmaceutical industry, overnight delivery is common. Therefore, proximity


to a major airport is a factor that should be considered when choosing a warehouse
location. Additionally, for raw material warehouses it is important that these are close
to natural resources.
c. In the book industry, supplier warehouse locations would be aected by the availability
of nearby natural resources.
d. In the aircraft manufacturing industry, sub-assemblies and parts are delivered by thousands of suppliers scattered all over the globe to the manufacturing facilities. Therefore,
for these supplier warehouses, by far the most signicant consideration is the ability to
ship parts easily and on-time, i.e., the proximity to railroads, freeways, harbors, etc.
In such a capital intensive industry, we would also expect that regulations such as tax
breaks have an impact on potential warehouse locations.
e. With a large customer base shopping for books on-line, short delivery lead times are
crucial. Therefore, in book distribution, we would expect to nd large centralized warehouses on reasonably priced land and where quick transportation modes are available.
f. Furniture manufacturing and distribution depends heavily on manual labor. Therefore,
warehouses in this industry should be located close to cities with sucient labor supply.
g. In PC manufacturing, outsourcing from all around the world is common where labor is
cheaper and regulations favor the huge investments associated with high-tech manufacturing. These considerations should be factored in when choosing candidate warehouse
locations.

Question 5
In the pharmaceutical industry, we would expect more warehouses closer to the end customers for short delivery lead times. On the other hand, in the chemical industry there
would be fewer centralized warehouses in order to consolidate orders and decrease outbound
transportation costs.

Question 6
If we expect that the truck would travel empty on its return route, then TL rate would
be higher. Considering the example in Section 2.2.2, the probability that the truck comes
back empty from Illinois (industrial heartland) to New York is lower than the corresponding
probability from New York to Illinois which explains the asymmetric cost structure between
these two cities.

Question 7
1. Handling Costs
i. Labor cost of workers in material handling.

ii. Costs of conveyors, fork lifts, automated guided vehicles (AGVs), etc., used to carry
the goods in the warehouse. Note that these costs have two components: variable
costs that are linearly proportional to the distances the goods are transported over;
and purchasing costs of equipment that are proportional to the daily output required
from the material handling system, but in a non-linear way because equipment is
purchased in discrete quantities.
2. Fixed Costs
i. Purchasing or rental cost of land.
ii. Cost of maintaining and operating the warehouse building which includes annual
depreciation and utility costs.
iii. Cost of racks that depend on the capacity of the warehouse.
iv. The cost of insurance for the facility.
3. Storage Costs
i. Opportunity cost of capital tied up in inventory.
ii. Cost of price declines while inventory is sitting in the warehouse. Note that this
includes the risk of obsolete inventory that needs to be salvaged.

Question 8
An exact optimization technique is guaranteed to provide an optimal solution (if one exists)
even if it takes a long time. On the other hand, a heuristic algorithm is a method that
will nd good solutions to the problem in a reasonable amount of time where the terms
good and reasonable depend on the heuristic and the particular problem instance. (See
Bramel and Simchi-Levi (1997).) The choice between an exact optimization technique and
a heuristic algorithm for a given problem frequently depends on the trade-o between
solution quality and solution time. Note that even if a heuristic algorithm (by chance)
nds the optimal solution to a problem, it cannot conrm the optimality of the solution.
On the other hand, for many problems there are no known optimal algorithms, so heuristics
must be used.

Question 9
Simulation is a popular performance evaluation and modeling tool for complex stochastic
systems that cannot be evaluated analytically. A simulation model can closely reect a
real system and mimic its behavior, but it has some drawbacks: simulation is a descriptive
tool, i.e., it cannot provide optimal values for system inputs. It generates, for a given set
of inputs, sample outputs from the system that are used to compute statistical estimates
of the performance measures. Also, accurate simulation models of large systems require
extensive development eort, and typically take a long time to run. Thus, we advocate a
two-phase approach to solve dicult logistics problems:
1. Use a mathematical optimization model to generate a number of good candidate
solutions, taking into account the most important cost components.

10

2. Use a detailed simulation model to evaluate the candidate solutions generated in the
rst phase.

11

Chapter 3

Inventory Management and Risk


Pooling
Discussion Questions
Question 1
Companies can cope with uncertainty by
1. keeping safety stock,
2. shortening production and order lead times,
3. using risk pooling strategies,
4. delaying product dierentiation in the supply chain as much as possible, i.e., aggregating demand for parties upstream of the supply chain, and
5. by installing systems to achieve information sharing between suppliers and buyers,
thus enabling collaborative demand forecasting.

Question 2
In general, higher inventory levels make it easier to maintain higher service levels. However,
modern inventory management techniques may make it possible to increase service levels
without increasing inventory levels as much as in the past.

Question 3
The variability in demand increases as the average and the variance of lead time increase.
Therefore, for a given service level, inventory levels increase with longer lead times and
higher lead time variance.

Question 4
The target service level depends on the mission-criticality of the product. For instance,
consider a service parts vendor for equipment for which every hour of down time is very
12

expensive. (See Example 6-5.) In this case, we would expect the management of the vendor
company to specify a service level close to 100%.
Market conditions also play an important role in determining target service levels. For
commodities, we would expect relatively high service levels since customers can switch
products easily if they do not nd the particular product they look for. However, a lower
service level may be acceptable if the product has a clear value dierentiation compared
to its competitors. For instance, customers of a high-end server that is clearly deemed
superior to the rest of the market may be willing to wait for 1-2 weeks if the manufacturer
is out-of-stock.

Question 5

The reorder level s = L AV G + z ST D L has two components. The rst component


L AV
G covers the expected demand during lead time, and the second component z
ST D L is the safety stock that protects against deviations from the expected demand
during lead time. Therefore, immediately before the order arrives, we expect
that the rst
Then, when
component is depleted completely and the inventory level is z ST D L.
an order of Q units arrives, the expected level of inventory is Q + z ST D L.

Question 6
In the base-stock policy, at the time the warehouse places an order, thisorder raises the
inventory position to the base-stock level (r + L) AV G + z ST D r + L. Similar
to the reorder level s in the continuous review policy discussed in Question 5, this basestock includes two components: the average demand(r + L) AV G until the order arrives
after r + L periods, and the safety stock z ST D r + L that protects against demand
uncertainty during lead time. Thus, just before
an order arrives, the expected inventory
on hand is equal to the safety stock z ST D r + L.
In order to determine the expected inventory level right after an order arrives at time
t + L, note that when inventory is reviewed at time t, the inventory position is raised to
the base-stock level, and an order that was placed at time t r arrives at time t + L. (See
Figure 3-12.) Therefore, when an order arrives, the expected inventory level
is L AV G
units less than the base-stock level, i.e., is equal to r AV G + z ST D r + L.

Question 7
Observe that the longer L1 , the more time the system has before allocation of inventory
to the retailers need to be made by the cross-dock facility. Thus, the longer L1 the more
the system can take advantage of the risk pooling concept. Hence, the total amount of
inventory is smaller when the cross dock facility is closer to the retail outlet.

Question 8
The answer is not immediately clear because the required safety stock depends both on
the average and the variance of the lead time. The retailer would have to make a decision
depending on the relative eects of these two factors. See Section 3.2.6. Also, your decision
would ultimately depend on the requirements of the retailers customers.

13

Question 9
For a mature product, it is reasonable to expect that the price and demand are stable
in the short term. However, as the time horizon gets longer, and new products are introduced into the market, the demand and price for this particular product decrease and
excessive inventories may have to be written o. Thus, inventory holding costs related to
obsolescence may be regarded as xed in the short term, but not in the long term.
Some storage costs are another example of inventory related costs xed in the short
term, but variable in the long term. For instance, due to large inventories a company may
have to rent multiple warehouses for a xed lease term. However, if inventory policies are
improved and turnover rates are increased in this period of time, then it may be possible
to rent fewer warehouses when renewing the lease contracts. Clearly, similar arguments
can be made for material handling equipment, storage racks, insurance, personnel, etc.

Question 10
Such deterministic models can be used as proxies for the more realistic stochastic models
if the planning horizon is short, and the parameters of the problem are expected to be
relatively stable over this time frame. However, most importantly, simple models can
illustrate the basic trade-os in a given type of problem which also translate into more
realistic and complex situations. For instance, the optimal policy for the economic lot
sizing model balances ordering and inventory holding costs which is a general insight for
more sophisticated systems as well.

Question 11
There are implicit and explicit penalties associated with a highly variable demand. For
instance:
1. As discussed in Sections 3.2.5 to 3.2.7, the level of safety stock is proportional to the
variability in demand, i.e., the higher the variability in demand the higher the inventory
holding costs.
2. From a manufacturers perspective, highly variable demand means that utilization of
equipment will greatly uctuate, and equipment will sit idle when demand is low.
3. From a managerial perspective, high variability makes planning a very complex task
that requires additional resources, sophisticated models and tools.
On the other hand, if a company is successful at implementing strategies to cope with
high variability in demand, it may be possible to leverage on these to increase market share
and/or revenue if the competitors are not as successful.

Question 12
The factors that aect the choice of the supply contract type include the following:
1. Business convention: Companies tend to choose the contract form that is most common
in their type of business.

14

2. Information availability: The type of information available may dictate what type of
contract can be implemented in practice. Depending on the contract type, suppliers
and buyers require access to dierent types of information, and some information may
be dicult for the supplier to acquire but easier for the retailer, or vice versa.
3. Decision making and incentives: To achieve the optimal prot for the whole system and
to allocate it properly, both suppliers and retailers must understand that decisions must
be made collaboratively. All parties must be aware that they have to give up part of the
control in their individual systems, and the choice of the supply contract type depends
on the level of control that parties are willing to share with each other.
1. Buy-back contracts:
i. Advantages:
(a) Commonly used in many businesses.
(b) The coordinating prices are not very sensitive to the demand distribution.
ii. Disadvantages:
(a) The supplier may have to buy back a large quantity of the product when demand
is low.
(b) Extra transportation and re-stocking costs for returned items.
2. Revenue-sharing contracts:
1. Advantages:
(a) Easy to understand.
(b) The optimal values of the decision variables are not very sensitive to the demand
distribution.
2. Disadvantages:
(a) Need to monitor the total revenue.
3. Quantity-exible contracts:
i. Advantages:
(a) Commonly used in many businesses.
ii. Disadvantages:
(a) The optimal values of the decision variables are sensitive to the demand distribution.
(b) Extra transportation and re-stocking costs for returned items.
4. Sale-rebate contracts:
i. Advantages:
(a) It is a direct incentive to the retailer to increase sales.
ii. Disadvantages:
(a) Dicult to track and implement.
15

Question 13
Generally speaking, there is a lag between development of algorithms in the operations
management literature and their adoption in business. There are several reasons for this:
1. Practitioners are not familiar with the literature.
2. It is hard to convince the industry that analytical models are useful. There is resistance
to change.
3. Possible gaps between theory and practice.
4. There are practical problems in implementation. For instance, without the development
of information technology, it would have been hard for the movie studios to track endcustomer demand and the revenue received by Blockbuster.
Also, in this particular case, the increasingly lucrative movie rental business due to
advances in home theater systems, and increased competition from media distribution
over the Internet may have forced Blockbuster and the movie studios to re-consider and
improve their business models.

Question 14
(a) Risk pooling across locations: combining several warehouses into a single central warehouse.
(b) Risk pooling across time: using quarterly demand forecasts instead of monthly forecasts
to do capacity planning.
(c) Risk pooling across products: designing products with maximum commonality and
delaying product dierentiation in the supply chain as much as possible.

Question 15
If pricing strategies, service levels and quality of service in two stores are similar, then we
would expect the demand in these two stores to be positively correlated. However, assume
that while the overall market demand is relatively stable, one of the stores is running a
promotion. In this case, we would expect that the promotional campaign would steal sales
from the other store, so that the demand in the two stores would be negatively correlated.

Question 16
In the absence of historical data, judgment and market research methods would be most
useful at the beginning of the life cycle of the rst Sony WalkmanTM . As more data becomes available during the product adoption phase, time-series methods could be employed
successfully. Then, as the product matures and the manufacturer has a better understanding of the factors that aect demand, both time-series and causal methods could prove
eective.
When introducing a more recent Walkman model, we would expect Sony to rely much
less on judgment and market research methods compared to the very rst model. Years of
experience, knowledge and data can be used to develop accurate quantitative time-series
and causal models.
16

Question 17
a. The benets of risk pooling increase as the correlation between demands decrease.
Therefore, similarity of demand across the ve regions makes the proposed system less
appealing.
b. The total cost of the decentralized system is $9,272 per week. In the centralized system,
LA is the best location with the total cost of $6,545 per week. Please refer to the
attached spreadsheet Chapter 3 Question 17.xls for details.
c. In this case, the minimum total cost is $8,808 per week, and the central warehouse
is located in LA. In other words, the decrease in the inventory holding costs due to
the decreased lead time between the manufacturing facility and the warehouse is more
than oset by the increase in the transportation costs. Please refer to the attached
spreadsheet Chapter 3 Question 17.xls for details.

Case Discussion Questions Sport Obermeyer


Please refer to Harvard Case Notes: Sport Obermeyer Ltd., Teaching Note (5-696-012)
31p, Janice H. Hammond, Ananth Raman for solutions of the case discussion questions.

17

Chapter 4

The Value of Information


Discussion Questions
Question 1
a. Barilla experiences wild uctuations in pasta demand while variability in end-customer
demand is quite small. This amplication in demand variability in the supply chain
is known as the bullwhip eect, and it strains Barillas manufacturing and logistics
operations. Several factors contribute to this eect:
1. Transportation discounts, which induce distributors to order larger quantities less
frequently
2. Trade promotions and volume discounts that create demand uctuations.
3. Delivery lead times of an average of 10 days from Barilla to the distributors.
4. Product proliferation, which makes forecasting more dicult.
5. Poor communication between parties in the supply chain.
6. Sequential decision making process in the supply chain, i.e., no collaboration.
The JITD program transfers decision-making authority for determining Barilla-distributor
shipments from the distributor to Barilla. Rather than simply lling orders specied
by the distributor, Barilla would monitor the ow of its product through the distributors warehouse, and then decide what to ship to the distributor and when to ship it.
This system alleviates many of the problem listed above, and enables Barilla to make
manufacturing and logistics decisions that benet the entire system.
b. The most signicant internal barrier to JITD is raised by the sales reps, who feel that
JITD would diminish their role in managing inventory and setting up promotions, potentially threatening their job security. Giorgio Maggiali needs to explain and demonstrate
to the sales force that the proposed program would in fact increase customer service
level by reducing stock-outs, and potentially lead to cost savings. Ultimately, JITD
would help the sales reps to manage the orders more eciently by increasing visibility
of the demand process. JITD is not a substitute for the sales force; it is a tool that
is made available to them for better customer service. Also, Maggiali needs to explain
that JITD is a company-wide eort, essential for Barillas long term success.
18

c. As a customer, JITD would at rst be disconcerting because I would be losing control of my inventory. In order for me to agree to JITD, Barilla needs to convincingly
demonstrate the specic benets that JITD will have for me.
d. The proposed system will be eective if it can be implemented correctly, and indeed,
subsequent results showed that JITD was very eective. In order to show value, it
would be useful to demonstrate that JITD benets the distributors (lowering inventory,
improving their service levels, and increasing their returns on assets) by running experiment at one or more of Barillas 18 depots. If customers will not agree to JITD, they
may at least agree to collaborative forecasting or increased supply chain visibility.

Question 2
a. E-commerce and the Internet allow upstream parties, e.g., suppliers, to have access
to more accurate demand information. It mitigates the bullwhip eect by preventing
distortion and miscommunication of demand information, and reducing the lead time
in order processing.
b. Express delivery reduces lead times, and the associated demand variance. Note that in
the formulas in Sections 4.2.1 and 4.2.2, the variability of demand is proportional to the
lead times in the system.
c. Collaborative forecasts help all stakeholders in the supply chain to arrive at a common,
agreed-upon forecast of end-customer demand and reduce the bullwhip eect.
d. Periodic promotions create articial demand peaks and bottoms and increase the variance in customer demand which amplies the bullwhip eect. By everyday low pricing,
these demand uctuations can be prevented, alleviating the bullwhip eect partly.
e. Vendor-managed inventory allows the supplier to monitor downstream demand and to
make a well-informed decision about how much to keep on-hand and how much to ship
to its customers. Thus, the supplier does not have to rely on order data to forecast
demand and thus reduces the bullwhip eect.
f. Supply contracts align incentives in the supply chain, and reduce the uncertainty in
demand by determining agreed-upon supply limits, thereby reducing the bullwhip eect.

Question 3
Sharing inventory is a form of risk pooling because it reduces the amount of safety stock
needed at each of the retail stores without decreasing the service level. Thus, sharing
inventory reduces inventory holding costs or increases service level. Additionally, transportation costs may be reduced because goods are delivered from closer sources in case of
stock-outs.
Proper incentives must be in place to encourage retailers to share inventory. For instance, consider a case in which retailer one holds relatively less safety stock than retailer
two. Retailer one will experience stock-outs more frequently, and will order those items
from retailer two. However, retailer two may not be willing to share its inventory unless it
is compensated by retailer one for the additional holding costs it incurs, because retailer
19

twos additional inventory is a (typically expensive) competitive advantage. For example,


think about a small Chevy dealer and a large Chevy dealer in the same town. The larger
number of cars on the large dealers lot is an advantageif he constantly supplies cars to
the smaller dealer, he loses that advantage.

Question 4
Several strategies can be employed to reduce the lead times in the supply chain:
1. Use EDI (Electronic Data Interchange) that reduces the information lead time in the
order process.
2. Use cross-docking to reduce/eliminate the time items spend in inventory.
3. Share inventory with nearby retail stores to reduce the lead time during stock-outs.
4. Share demand information throughout the supply chain to be able to respond to demand
uctuations rapidly.
5. Use delayed dierentiation, which pushes generic products down the supply chain as
much as possible, and allows the supply chain to more easily accommodate demand for
a variety of related products.
6. Implement VMI (Vendor Managed Inventory) strategies so that suppliers can be more
responsive to changes in inventory levels.
7. Use an express delivery service such as UPS to reduce the transportation lead time.
8. Adopt new technologies such as machine automation to reduce the manufacturing lead
time.

Question 5
1. The farmers prefer large and stable demand over time so that they can dedicate large
portions of land to a particular product, e.g., wheat, corn, etc.
2. The manufacturing division likes long production runs with minimal number of setups
and a low mix of cereal products which keep the production costs low.
3. The logistics division wants to ship full truck loads to reduce transportation costs.
4. The marketing division prefers a high product mix with short lead times. For marketing
purposes, the ability to oer dierent types of cereal is crucial.
5. The distribution arm of the grocery chain wants to replenish stocks as quickly as possible
while keeping inventory and transportation costs low.
6. The grocery store manager wants on-time delivery of a high variety of products with
short notice in order to be able to quickly respond to a highly diversied end-customer
demand.
Note that the upstream parties in the supply chain typically prefer stable demand with
a low mix while the more downstream parties prefer shorter lead times and a higher mix.
20

Chapter 5

Supply Chain Integration


Note: The solutions for this chapter are incomplete at this time. For more
complete solutions, please see the textbook web site.

Discussion Questions
Question 1
A push-based supply chain has following advantages: 1) It utilizes long-term forecast and
planning; 2) It stores inventory in the system. If the products are generic, custom demand
can be satised from inventory right away and customers waiting time is reduced.
A pull-based supply chains has following advantages: 1) It has minimal inventory in
the system. 2) It can better match supply and demand when products are dierentiated;
3) It reduces the reliance of production planning on forecast.

Question 3
The advantages of moving the push-pull boundary are as follows: 1) It increases the degree
of risk pooling and therefore reduces the inventory level in the system; 2) It reduces the
reliance of production planning on forecast.
The advantage of moving the push-pull boundary later are as follows: If the products
are generic, custom demand can be satised right away from inventory. It, therefore,
shortens the customers waiting time.

Question 4
1. Amazon: Amazon switched form pure pull to push and pull, because the sale volume has
grown large. The boundary is at the their regional warehouses. This change is because
the large volume allows Amazon to aggregate demand across geographical areas.
2. Peapod: Similar to Amazon, Peapod moved form pure pull to push and pull by establishing warehouses which serve demand aggregated over an area larger than traditional
supermarkets. Delivery time constraint and service level are also reason cause Peapod
moving to push-pull mode.

21

3. Dell: The push-pull boundary in Dell supply chain is at the assembly. Computer
components are standard, their demands are aggregated over all nished products that
require those components. They can be managed using push mode to take advantage
of risk pooling and economy of scale. Computers are customized according to the
conguration specied by buyers, the assembly of computers should be managed in a
pull mode.
4. Furniture companies: The production is based on pull but delivery is push, because
the transportation cost for furniture is high and furniture companies need to aggregate
demand over some period to take advantage of risk-pooling and economy of scale.

Question 10
Consider Wal-Mart.
1. Cross Docking
Suppliers for nonperishable products such as beer, rice, and shampoo, for which the
total sale volume is large but demand at each individual stores is low, are suited to
a cross-docking strategy. These products can be cross-docked with other low-volume
goods to create full-loaded truck for each store.
2. Direct Shipment
Suppliers for perishable and time sensitive products such as fruits and milk are suited
to a direct shipment strategy. Goods that are ordered by retailers in full truck loads
can also be shipped directly.

Case Discussion Questions The Great Inventory Correction

22

Chapter 6

Strategic Alliances
Discussion Questions
Question 1
a. Consider a company for whom logistics is a core competency, and that has sucent
resources to implement the strategy.
b. Consider a company whose products are perishable, and for which environmental conditions must be tightly controlled during warehousing and transportation. (For instance,
a biotechnology or a pharmaceutical company.) In this case, the company may not
want to give up control of products during logistics operations in order to ensure their
quality, and it may choose to acquire a logistics company with appropriate expertise.
c. Consider a company that has internal logistics expertise, and that is trying to expand
its operations into new markets. If the company is already resource-constrained, it
may make sense to develop the strategy in-house, but delegate specic operations to
third-party logistics providers.
d. Consider a new company that established its manufacturing operations recently, and is
struggling to ramp-up its output. In this case, it may make sense for this company to
focus on design, manufacturing and sales operations of its products and outsource all
activities related to transportation and warehousing of raw materials, and distribution
of nished goods.

Question 2
Logistics is a complex set of tasks that requires vast resources, analytical expertise, related
software and a signicant amount of investment in information technology which goes out
of date very rapidly. Thus, unless logistics is a core competency of the company and it has
resources to dedicate to it, it is dicult to design and implement eective logistics operations. Therefore, companies are increasingly willing to outsource logistics operations to
third parties who have the analytical expertise, necessary software and sucient resources
to keep their information systems up-to-date. In addition, since these third party logistics
providers have several (or many) customers, they have sucient economies of scale to make
the necessary capital investments to operate an advanced logistics system.
23

Question 3
1. Quick response: In a quick response system, the retailer determines the order quantities
and replenishment times, while suppliers analyze POS data to improve their forecasting
and production scheduling. This system could be preferred when the retailer-supplier
relationship is new, and trust between the two parties has not been fully developed yet.
In this strategy, the retailer has complete control on its inventory, but helps suppliers improve operations by providing POS data. Additionally, this type of partnership
could be preferred if nancial and personnel resources to develop a more integrated
relationship are not available.
2. Continuous replenishment: In a continuous replenishment system, vendors receive POS
data and use these data to prepare shipments at previously agreed-upon intervals to
maintain specic levels of inventory. This type of partnership is a system between quick
response and VMI, because suppliers and buyers together agree on target inventory and
service levels. It involves less risk for retailers than VMI, and typically leads to a more
stable and long-term relationship between suppliers and retailers than quick response
does.
3. In a vendor-managed inventory system, suppliers decide on the appropriate inventory
level for each product and the appropriate inventory policies to maintain these levels.
The retailers give the vendors full authority to manage inventory replenishment. This
system is more integrated than the previous two systems, and requires a high level
of trust between the supplier and the buyer. If implemented properly, VMI can lead
to more overall system savings than the other two types of partnerships. However,
VMI requires more commitment, and initially, signicant investment in information
infrastructure, time and personnel.

Question 4
Information sharing in this case is most benecial if the production capacity of the supplier
is tight. The supplier can use the weekly POS data to forecast the order size that will arrive
at the beginning of next month, to adjust its production schedule accordingly given the
tight capacity, and to reduce the risk of not being able to meet the demand.

Question 5
Initial VMI schemes in which ownership of goods transferred to the retailer when goods
were delivered beneted suppliers by giving them complete control of their system. Additionally, it also provided an incentive to the suppliers to ship as much inventory to the
retailer as permitted under the contract. This was an important disadvantage of these
contracts because the overall system prot was not necessarily maximized.
The more recently developed consignment schemes have clear inventory and managerial
cost reductions for the retailer since the supplier owns the goods until they are sold.
However, this strategy still allows the supplier to manage its operations more eciently
because it makes all the production and distribution decisions. Note that inventory holding
and personnel costs at the supplier increase, and these issues must be addressed in the
supply contract by sharing cost savings of the retailer with the supplier.
24

In general, both of these types of inventory ownership policies require signicant information sharing and large technology investments. Also, note that in these policies the
retailer does not have any control on its inventory any more, and trust issues must be
resolved completely for this type of partnership to work out.

Question 6
Some of the following steps could have been taken to prevent the failure of the program:
1. In a VMI system, trust issues should be resolved at the very beginning during contract
negotiations. Additionally, communication channels must be open at all times to discuss
any additional concerns that may arise. Clearly, these issues were not addressed in
sucient detail at Spartan.
2. Spartan could have specied a test period for its suppliers, and after the test period the
program could have been discontinued with unsuccessful suppliers.
3. Spartan could have collaborated with its suppliers to determine agreed-upon forecasts
and help them resolve forecasting issues due to promotions.
4. The retailer-supplier partnership could have started with a continuous replenishment
system which is less risky than a vendor-managed inventory system. Then, the VMI
system could have been established based on this experience.

Case Discussion Questions Audio Duplication Services, Inc.


(ADS)
Question 1
ADSs customers customers, i.e., the national retailers, want to reduce inventory holding
costs and expenses related to managing inventory by moving towards VMI agreements.

Question 2
The most signicant impact on ADSs business will be on its distribution functions because it will have to ship directly to the individual stores instead of distribution centers.
Transportation costs will increase due to the increase in the number of destinations. Also,
depending on its agreement with the record companies, ADS may incur additional inventory holding costs because compact disks and cassettes will spend more time in its system.
ADS should take this situation as an opportunity to re-design and streamline its operations and prepare itself for the general trend towards VMI in the industry. This may
help ADS to gain a competitive advantage, and potentially increase its market share.

Question 3
Logistics is not a core competency of ADS. Additionally, the management team of ADS
must address more crucial issues such as the emerging media distribution business over
the Internet. Therefore, ADS should outsource its distribution functions to a third-party
logistics provider in order to focus on issues threatening its core business.
25

Question 4
Under the proposed consignment scheme, inventory belongs to the suppliers until the
products are sold. Under this scheme, it would be inecient and unreasonable if products
were rst delivered to distribution centers that belong to the retailers. This would add an
unnecessary complexity to the system as to how goods in the distribution centers would
be handled and ultimately delivered to the individual stores. Additionally, by encouraging
direct shipments, retailers can reduce the warehouse space they rent or own, and reduce
costs further.

26

Chapter 7

Procurement and Outsourcing


Strategies
Discussion Questions
Question 1
In order to assess the eect of product life cycles on the make/buy framework developed
in Section 7.3, we need to understand how product knowledge and capacity requirements
evolve over the life cycle of a product. A typical product life cycle has several stages:
1. The product is newly introduced, and bought initially by a relatively small number of
customers (early adopters). At this stage of the product life cycle, production level is
low and capacity is usually not an issue. Also, quite possibly, there are problems in
the design and manufacturing of the product such that yield is low, and changes in the
production processes are frequent. Under these conditions, the buy/make framework
implies that a new product should not be immediately outsourced.
2. In the rapid adoption phase, demand for the product increases at an increasing rate. If
this leads to tight production capacity, and the production processes are already stable,
then outsourcing should be considered. It may even be the only choice to keep up with
the increasing demand.
3. When the product reaches the maturity phase, i.e., when demand stabilizes over time,
then the outsourcing decision should be re-considered under the framework discussed in
Section 7.3. For instance, if earlier an integral product was outsourced due to capacity
constraints, then the rm should consider installing additional capacity to meet the
stabilized demand, and manufacturing the product in-house.
4. When the product is approaching its end-of-life, outsourcing is a good option for both
integral and modular products because the company should focus on new products.

Question 2
This question is relevant for modular products for which only a subset of the components
drive the customers purchasing decision. For instance, consider the PC market. In general,
27

the customers are primarily concerned with the CPU speed, the amount of memory, and
the hard disk capacity when buying a PC. Typically, all other components of a PC, e.g.,
the motherboard, the sound card, the CD drive, cables, etc., are of secondary importance
to most of the buyers.
In other words, the value proposition of a modular product depends on a few of its
components, and we can expect that manufacturers focus their innovative eorts and new
product introductions on this small set. Thus, it is crucial that the knowledge for these
components is kept in-house. Under the buy/make framework developed in Section 7.3,
this implies that the manufacturer should refrain from outsourcing key components of a
modular product.

Question 3
In this case, the risk is high, but also the potential return is high. If the base commitment
level is low, the option level is high, and the demand turns out to be higher than what the
retailer expects, then the return of the supplier may be substantially more than what it
would have been under a long-term contract. This is due to the dierential between the
overall unit price (prepayment plus the exercise price) in an option contract and the unit
price in a long-term contract. In addition, the supplier can pool the risk among several
customers.

Question 4
The private and consortia-based e-marketplaces play dierent roles in IBMs supply chain.
IBM benets from both marketplaces in dierent ways.
1. In the private exchange, the focus is on better supply chain collaboration. Sensitive
information such as product design, customer orders, cost, production plans, etc., are
shared between IBM and its suppliers to improve operations, decrease costs and increase
revenues.
2. The objective in the consortia-based e-marketplace is to increase purchasing power by
aggregating buyers, to nd new and high quality suppliers, and to allow these suppliers
achieve cost eciencies by dealing with standardized systems.

28

Chapter 8

International Issues in Supply


Chain Management
Discussion Questions
Question 1
a. Domestic production with international distribution is typical for small businesses that
attempt to expand to serve global markets. For instance, Mavi Jeans manufactures its
products in two facilities in Istanbul, Turkey, but sells them in more than 3,000 locations
worldwide. (See Mavi Jeans (2003).)
b. The product(s) may be so complex that the necessary expertise and resources to manufacture dierent components are spread across the world. For instance, Boeing has
more than 15,000 suppliers in 81 countries. (See The Boeing Company (2003).)
c. Typically, high labor cost in labor-intensive industries causes manufacturing operations
to shift oshore. For instance, consider Nike, which subcontracts its manufacturing to
approximately 350 factories in the Asia-Pacic region employing nearly 400,000 workers.
(See Nike (2003).)
d. A fully integrated supply chain is crucial for companies that implement exible global
supply chain strategies in a highly variable environment, e.g., for companies that intend
to shift production from country to country in order to reduce costs or risk. The PC
manufacturing industry is a good example of this.

Question 2
Although the specic answer depends on the management style, resources and long-term
strategies of the rm, a hedge strategy seems more appropriate for a small rm. Following
a speculative strategy may be disastrous if the company does not have the size and nancial
strength to absorb potential losses associated with a speculative strategy. On the other
hand, following a flexible strategy may require a signicant amount of additional investment
in infrastructure to ensure the necessary coordination, and for the re-design of products
and processes. The resources necessary to implement a exible strategy successfully may
not be available to a small rm. Clearly, for a large rm, the nancial and resource
29

constraints may be much less relevant than for a small rm, and the global strategy to be
employed may be any of the three strategies mentioned above depending on the specics
of the situation.

Question 3
Some of the factors that aect whether a product can be sold globally without modication
are discussed below:
1. Brand recognition. Some brands have developed a global image of quality and desirability that they do not have to be customized to regional and national tastes. This is
especially true for luxury brands, such as Ferrari that sells the same cars globally.
2. Cultural dierences. Some products reect long-term traditions and/or a certain regional taste developed over time, and t into the regional category. A lot of food
products fall here, and it is much harder for these products to get accepted globally.
For instance, it is hard to think of kabobs that are very popular in the Middle East to
be sold in global chain restaurants. An exception in this category is pizza, for instance.
3. Standardization. In consumer electronics and computer manufacturing there are plenty
of examples of global products. The complexity of such products requires standardization throughout the world, and makes them global products. However, note that
exceptions exist. For instance, TV systems in the US and Europe are dierent, and
the same TV set cannot be sold in both markets. Medical products also t into this
category as long as they satisfy dierences in health regulations in dierent countries.

Question 4
In Belgium and Canada, the most important issue would be keeping the costs down. Bakery
production is labor-intensive and requires relatively unskilled labor. However, unskilled
labor costs in the First World countries are typically very high compared to the rest of the
world.
In the emerging nations, such as Russia, Singapore and Argentina, logistics issues would
be most important since the necessary infrastructure may not be in place. On-time delivery
of bakery products is crucial because they are perishable items, and there is a time window
they need to reach the bakeries in order to be sold. For instance, if the fresh products
arrive at noon, instead of early in the morning, most of these items may be left on the
shelves at the end of the day.
In a Third World country, such as Nigeria, in addition to the logistics problems mentioned above for the emerging nations, environmental conditions may not be sucient to
ensure a healthy production of bakery products. For instance, water may not be clean,
etc.

Question 5
a. Possible reasons for Wal-Mart to start international operations include:
1. Domestic revenues do not increase at a pace Wal-Mart wants them to. Therefore,
Wal-Mart intends to achieve a high growth rate in foreign countries to hedge against
the slow business in the domestic markets.
30

2. A rival European chain, Carrefour SA, has already a strong presence in the South
American market. Wal-Mart could lose the market totally if it did not respond
quickly.
3. Foreign operations would also help Wal-Mart identify potential new low-cost suppliers
for domestic operations.
b. Having many suppliers in dierent countries would enhance Wal-Marts everyday low
pricing formula by allowing it to hedge against cost increases due to economic and/or
political conditions in a given country.
c. Strong centralized control is helpful for aligning local operations with the overall corporate objectives. Additionally, Wal-Marts years of domestic expertise in retail operations, e.g., distribution systems, can best be leveraged to improve distribution in South
America if strong centralized control is implemented. On the other hand, it may be
impossible to analyze customer preferences and understand cultural dierences unless
local managers control certain aspects of the business.
d. In general, political instability is a major concern in South American countries. For
instance, due to the recent downfall of the Argentine economy, Wal-Mart may experience
diculties if the Argentine government starts to employ policies that favor domestic
producers rather than foreign companies. Also, if the dollar continues to gain in value
against major South American currencies such as the Argentine Peso and Brazilian
Real, American exports into these countries will be expensive compared to their local
competitors, which will negatively impact Wal-Marts margins.

31

Chapter 9

Coordinated Product and Supply


Chain Design
Note: The solutions for this chapter are incomplete at this time. For more
complete solutions, please see the textbook web site.

Discussion Questions
Question 1
1. IKEA Furniture
2. oor lamps
3. Tupperware made by Rubbermaid
4. Collapsible chairs
5. Fedex package box

Question 2
1. Oering more products, models, and options requires more customization and more
complicated production scheduling.
2. Product proliferation makes it dicult for manufacturers to take advantage of economy
of scale, because products are processed in small batches.
3. Oering more products adds diculty to inventory tracing.
4. Non-aggregate demand usually has higher variability than aggregate demand.
5. Great demand variability makes forecast inaccurate.
6. When demand variability is high, a rm needs to prepare more stock to maintain the
same service level than when demand variability is little.

32

Question 4
Standardization must be a positive force to eliminate the cost and inconvenience caused
the possible incompatibility between products oered by dierent vendors, and still allow
competition and innovation. Excessive standardization could reduce design options and
stie the development of a product or industry.
Microsoft windows is an example of excessive standardization. The large population
of MS windows users and the wide acceptance of this operating system among various
software vendors make many MS window technologies industrial standards. Microsoft
takes advantage of this to block competition and manipulate market rather than improve
the performance of its products.

Case Discussion Questions Hewlett-Packard Company:Network


Printer Design for Universality

33

Chapter 10

Customer Value and Supply Chain


Management
Discussion Questions
Question 1
In traditional retailing, quality is frequently the primary determinant of price: the higher
the quality of the physical product, the higher is the price. However, in on-line retailing,
rms are able to leverage on value propositions other than product quality, and thus gain
more exibility in pricing. For instance, the ability to browse and search an on-line catalog
or the availability of an order tracking system may lure the customer to a site which has
higher prices for the same product or to a site that oers lower quality products for the
same price. In other words, in on-line retailing the price versus quality trade-o curve is
aected by other factors.

Question 2
a. As the available capacity decreases with respect to the average demand, it may be
impossible to satisfy the realized demand. Therefore, by changing prices to aect the
demand distribution, the rm would be able to increase revenues. For instance, increasing price may decrease the overall demand, but if the realized demand for the company
is still more than the available capacity, the rm is better o by increasing price.
b. As the standard deviation of demand increases with respect to its mean, it becomes
more likely that the realized demand over time is not close to the demand estimate
associated with a xed-price policy. Therefore, adjusting prices over time increases
prots when demand variability is high.
c. Demand is not only a function of price. Seasonality and macroeconomic conditions,
e.g., changes in the size of the whole market, aect the demand distribution that an
individual rm faces. Clearly, as the demand distribution changes over time, the optimal
price changes as well.

34

Question 3
a. This dimension of customer value refers to the ability to match supply and demand. As
discussed in Section 10.2.1., if the supply chain is not designed by taking into account
the specic characteristics of the market, then the consequences can be severe. For
instance, if the demand is highly variable, then the focus of the supply chain should
be on exibility and reducing lead times such that the product can be delivered to
the market before the conditions change. Otherwise, customer requirements cannot be
satised, sales are lost, and obsolete inventories accumulate.
b. The decision where to draw the push-pull boundary in the supply chain has a strong
impact on what product portfolio can be oered. For instance, if nished products are
made-to-stock and kept in a central inventory until a customer order arrives, then it
may not be possible to meet the demand for all types of product congurations. On
other hand, if the push-pull boundary is at the assembly operation, as it is in the Dell
case, it is possible to oer a greater variety of products.
c. An important component of price is cost. Supply chain decisions determine production,
inventory and transportation costs, and aect the ability of a company to oer low
prices. Furthermore, supply chain decisions impact the brand recognition of a product.
Note that it would be very hard to build a prestigious brand name if the supply chain
produces defective products, does not meet delivery due dates, and does not provide
support for its products after the sale.
d. Consider, for example, service and maintenance support. Clearly, in order to perform
these activities, the supply chain must satisfy certain requirements. For instance, if
on-site support is provided, then it may be necessary to keep component inventories
close to the major customer locations in addition to the necessary personnel to perform
these activities. Also, if a piece of hardware needs to be sent back to the factory to be
xed, then reverse logistics operations must be planned, e.g., pick-up from the customer
site, transportation back to the factory, etc.
e. In order to ensure that the learning process enhances customer value, it is critical to
install the necessary information loops in the supply chain. For instance, if databases
are used to track customer preferences, then this data must be fed back to the product
design process, and eventually a superior product must reach the customer. Clearly,
this may require additional investment in information technology infrastructure.
Also, consider the Dell example, in which Dell manages the entire purchasing process of
large customers including special custom features. In this case, the supply chain must
have enough exibility in production and distribution to accommodate customer-specic
demands.

Question 4
a. Starbucks emphasizes customer access along with experience by creating a pleasant
ambiance in its stores.
b. The Gap creates customer value by oering aordable products along with a brand
image built around stylish designs.
35

c. Expedia.com brings customer value by oering a large selection of products, i.e., consolidating information about dierent travel rates from many companies for easier shopping,
and enabling one-stop shopping for ights, hotels and cars.

Question 5
Examples of experiences enabled by the Internet include:
1. Newsletters sent regularly by e-mail.
2. On-line customer service.
3. On-line birthday cards sent based on birthday data collected from customers.
4. User groups created by companies that bring together people that share the same enthusiasm and interest about the companys products.

Question 6
1. Possible performance measures for Amazon.com include:
i. The average interval between re-visits (of the same customer) to the site.
ii. Average order size in dollars, average number of items in an order.
iii. Growth rate of hits on the site.
iv. Links to the site from other web sites.
v. Classical performance measures, such as sales, total revenue, costs and prots,
earnings per share, etc.
2. Possible performance measures for the supply chain include:
i. On-time delivery, lead time, ll rate.
ii. Return rate.
iii. Value added per employee.
iv. Inventory turnover.

36

Chapter 11

Information Technology for Supply


Chain Management
Discussion Questions
Question 1
The ERP industry is fragmented, and there are many ERP vendors (see TechnologyEvaluation.Com (2002)); a number of them are also mentioned in this chapter: Baan Co.,
Oracle, QAD Inc., System Software Associates, PeopleSoft, SAP, etc. The reason for this
fragmentation seems to be the lack of standardization in the large portfolio of business
functions, e.g., human resources, nance, purchasing, production, that these ERP systems
support. All companies have some subset of these functions, and they all have dierent
needs which lead to dierent software requirements and a number of ERP vendors.

Question 2
In addition to enabling access to data that currently reside in closed systems, the Web
service technology would ultimately remove the barriers to adopting a best-of-breed approach to supply chain management by alleviating the challenging application integration
and version upgrade issues.
For instance, a 3PL provider that handles inbound logistics of a company may install
a tracking system for its trucks that can be integrated to its customers systems over the
Web service technology. This would provide better information to the vendor when to
anticipate deliveries in order to improve production schedules.

Question 3
The most important advantage of buying a Decision Support System (DSS) from an Application Service Provider (ASP) is that it reduces initial implementation costs, both for
hardware and services. The company does not have to buy the IT infrastructure that is
needed to support the DSS, and many issues related to the setup of the DSS system are
taken care of automatically by the ASP. Thus, in general, we would expect that the initial
implementation project would take less time and eort compared to an on-site DSS imple-

37

mentation. Additionally, no maintenance costs related to version upgrades are incurred.


(See the Starbucks case at the beginning of the chapter.)
On the other hand, there are many issues that need to be addressed before a company
decides to run a DSS in this mode. First, sensitive data, such as production costs, need to
be transferred to a remote site over which the company has no control. Most companies
would be very reluctant to agree to this due to security concerns, especially if the same ASP
would be hosting the DSS for a competitor at the same time. Second, there may be serious
integration issues involving the DSS and the internal systems of the company, e.g., the ERP
software that feeds the input data into the DSS. In other words, cross-enterprise integration
could be substantially more challenging than intra-enterprise integration. Third, a DSS is
typically a complex system, and changes to modeling are certain to occur in a dynamic
business environment. In the ASP mode, it is much harder for the company to develop skills
and expertise to make these changes happen, and the company will always be dependent
on the ASP. Note that this becomes a very critical issue if the ASP is not a big and stable
company and eventually goes out of business.

Question 4
The purpose of the second generation of ERP systems (ERP II) is to achieve integration
across the supply chain, and the Internet technology is a major tool for the ERP vendors
to achieve this objective. Three of the four goals of the supply chain information technology, i.e., collection and access of information and collaboration, can be facilitated greatly
through standardization by the use of Internet. (See the topics Communications and
Collaboration in Section 11.3.) Along these lines, we are beginning to see the architecture
of ERP systems evolve toward a modular and Web-based environment.

Question 5
a. Network design has the longest planning horizon (up to a few years) with a strategic
focus on how to optimize the overall supply chain. Supply chain master planning is
a tactical decision with the objective of coordinating dierent functions in the supply
chain, and the planning horizon ranges typically from a week to a few weeks. Operational
planning systems have short planning horizons and the focus is on a single system,
e.g., production planning. The objective is to generate feasible strategies under the
constraints imposed by the decisions made previously in strategic network design and
supply chain master planning. In operational execution systems, the focus is on realtime execution.
b. The execution systems use very detailed data about the state of the supply chain, and
the level of data aggregation increases as you move from execution to strategic network
design. For instance, strategic network design problems aggregate demand typically on
an annual basis.
c. Complexity and duration of implementation increases as you move from strategic decisionmaking toward execution due to increasing level of detail.
d. Only a few people need to be involved in a strategic network design project, but the
number of users increases dramatically toward execution.

38

Chapter 12

Decision-Support Systems for


Supply Chain Management
Discussion Questions
Question 1
Some of the factors that need to be considered when selecting a DSS for supply chain
master planning are:
1. Analytical capabilities.
i. Consider whether the algorithms are heuristics or provide optimal solutions. If they
are heuristics, is it possible to quantify the quality of the heuristic solution?
ii. Scalability. How is the performance aected by the length of the planning horizon,
number of products, etc.?
iii. Robustness and sensitivity analysis. Do the master plans change signicantly with
small changes in demand forecasts? Is the DSS able to perform sensitivity analysis?
iv. Can multiple solutions be generated easily?
2. Data requirements. Is there enough data of sucient quality to support the needs of the
planning system? Does the planning tool integrate easily into existing ERP software or
other pre-existing systems?
3. User interface. Is the DSS easy to use? Are there import/export capabilities based on
common PC formats?
4. Output analysis. Is the output presented in a format that is easy to understand and
interpret? Can the results be exported into common PC formats?
5. Integration with operational planning systems. Is the integration possible from an IT
perspective? Is it possible to generate feasible solutions in the operational planning
systems based on the output of the supply chain master planning tool?
6. Collaboration. Does the DSS facilitate collaboration with other parties involved in the
supply chain, e.g., suppliers?
39

7. Hardware and software requirements.


8. Price.

Question 2
For instance, if a DSS is used by many users spread across dierent geographic locations, it
is important that the DSS has a Web-based client/server technology in order to facilitate
collaboration. Clearly, a similar argument can be made if the input data reside on many
dierent systems across dierent locations. However, the Web technology may not be
important for a strategic network design DSS that is used every few years by a few users.

Question 3
Planning does not add much value unless the plan can be executed properly. Therefore,
the interface between supply chain planning tools and execution systems is critical. Of
course, this is true from an IT perspective, but it is also crucial from an analytical point of
view. For instance, consider an execution system to which a large order from an important
customer arrives, and assume that this is a rush order. In this case, a relatively short lead
time is quoted to the customer, and production and delivery schedules must be updated
by disrupting the schedules of the rest of the orders minimally. In other words, the DSS
is required to propagate the eect of this rush order back to operational planning, and to
supply chain master planning if necessary.

Question 4
a. By benchmarking, a company can assess its performance against its competitors along
common dimensions in the specic industry. This helps the company to determine its
strengths and weaknesses, and prioritize the areas in which improvements are needed.
b. For instance, benchmarking can provide insight into what the customers value the most.
In other words, it may be possible to attribute dierences in sales, revenue and customer service among dierent companies to the specic performance measures based on
benchmarking results.
c. We would expect benchmarking to have an immediate impact on the performance at the
front-end of the supply chain, e.g., order fulllment, customer service, etc., because this
is highly visible to the customer, and aects sales and marketing signicantly. Of course,
the front-end must be supported by the back-end, and the eect of benchmarking would
eventually propagate back toward the supply chain planning level.

40

Bibliography
Bramel, J. and Simchi-Levi, D. (1997). The logic of logistics : theory, algorithms, and
applications for logistics management, chapter 1. Springer, New York.
Mavi Jeans (2003). Mavi.com.
http://www.mavi.com/story.asp?s=4.
Nike (2003). Nike Biz::About::Company Overview:: The Facts.
http://www.nike.com/nikebiz/nikebiz.jhtml?page=3&item=facts.
TechnologyEvaluation.Com (2002). ERP Evaluation Center - Technology Evaluation.Com.
http://www.erpevaluation.com/index.asp.
The Boeing Company (2003). Quick Facts.
http://www.boeing.com/companyoces/aboutus/quickfacts.html.

41

You might also like