Professional Documents
Culture Documents
Delta Project Status
Delta Project Status
Sr
No
1
2
Field Instruments
Sr
No
1
2
3
4
5
6
7
8
9
10
11
Erection Hardware
Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
ment
sed Control System along with 1 No. SCADA Software, Control panel and accessories
KVA Online UPS with isolation transformer for 30mins battery backup & 1 No. Commercial Personal Computer
not yet dispatched
ments
ment
rdware
ment
Quantity
Dispatch Control
date from room
Prolific
readiness
17.08.13
17.08.13
Tray entry
upto panel
Panel
Condition
Earthing
upto panel
Quantity
1
1
1
1
1
1
1
1
1
1
Dispatch Process
date from connection
Prolific
avai
17.08.13
17.08.13
17.08.13,
10.09.13
17.08.13,
10.09.13
Instrument
Instrument Wiring &
Instrument installation
installation termination
testing done accessories
status
s
readiness
10.09.13
11
Dispatch
date from
Prolific
Quantity
Units
250
300
250
60
50
50
1
20
Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Lot
Nos
10.09.13
10.09.13
10.09.13
20
Nos
10.09.13
25
1
140
15
20
4
20
Nos
Nos
Mtrs
Nos
Nos
Nos
Nos
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
10.09.13
Readiness
of Layout
Installation
as per
layout
Nos
10.09.13
Cold loop
check
simulation
check
power on
check