You are on page 1of 12

PLC PANEL

Sr
No
1
2

Field Instruments

Sr
No
1
2
3
4
5
6
7
8
9
10

11
Erection Hardware

Sr
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

17

ment

sed Control System along with 1 No. SCADA Software, Control panel and accessories

KVA Online UPS with isolation transformer for 30mins battery backup & 1 No. Commercial Personal Computer
not yet dispatched

ments

ment

emperature Indicating Transmitter


e Transmitter
Valve for H2 line (Line size 25mm)
Valve for steam supply line (Line size 50mm)
valve for Cooling water supply
valve for return line
valve for Steam trap
valve for N2 gas line
valve for Vacuum line
valve for H2 Line

ow meter for H2 line

rdware

ment

X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED


E X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED
E X 1 MM2 SINGLE CABLE , SHIELDED , WIRE ARMOURED
EARTHING COPPER CABLE FOR INSTRUMENTS
M WIDTH 50 MM COLLER ( PERFORATED )
WIDTH 50 MM COLLER ( PERFORATED )
TTING ACCESSORIES ( COUPLAR PLATES,NUT & BOLTS ETC
T DC FLP CABLE GLAND FOR GAS GR.IIC
DC NON FLP CABLE GLAND WITH CHECK NUT FOR PANEL

T MS PLUG WITH CHECK NUT


INTED FERRULES ON WHITE PVC
TUBING - 1.25" THK ., 1/4" OD PVC COATED
TM X 1/4" OD CONNECTOR
D X 1/4" OD UNION
D EQUAL TEE
T PLUG

ADER - 8 POINTS with 1/4" SS 3104 Needle Valve


ted with 2" SS 304 Sch 40 Pipe , 1" Ball Valve At Inlet & Outlet ( Drain ) having Dual AFR in parallary arranged as per
cation

Quantity

Dispatch Control
date from room
Prolific
readiness

17.08.13

17.08.13

Tray entry
upto panel

Panel
Condition

Earthing
upto panel

Quantity
1
1
1
1
1
1
1
1
1
1

Dispatch Process
date from connection
Prolific
avai
17.08.13
17.08.13
17.08.13,
10.09.13

17.08.13,
10.09.13

Instrument
Instrument Wiring &
Instrument installation
installation termination
testing done accessories
status
s
readiness

10.09.13

11

Dispatch
date from
Prolific

Quantity

Units

250
300
250
60
50
50
1
20

Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Mtrs
Lot
Nos

10.09.13
10.09.13
10.09.13

20

Nos

10.09.13

25
1
140
15
20
4
20

Nos
Nos
Mtrs
Nos
Nos
Nos
Nos

10.09.13

10.09.13
10.09.13
10.09.13
10.09.13

10.09.13
10.09.13
10.09.13
10.09.13
10.09.13

Readiness
of Layout

Installation
as per
layout

Nos

10.09.13

Cold loop
check

simulation
check

power on
check