You are on page 1of 5
pRerarep py | 21apr.2000 | Taapong R ptt CHECKED BY 21 Apr.2008 | Wisoot CHERE APPROVED BY 21 Apr. 2008 ES Jeong PTTCH PLANT Il DEBOTTLENECK PROJECT ceamireppy | 21Apr.2008 | sone sheddenuhde a aE oa] SESCRPTON 3 tp zoie | Waowt | lang etn a per Comm ni atAge 2008 | Wheot | 88 omg Tse or Consreton METHOD STATEMENT FOR ERECTION OF UNDERGROUND PIPING (LINE No.11-24"-CWS39755A-123AUE-NOMM) Woc. no. : 8004-L1-WS-002) ‘AREA CODE TWREJOBNO.. ED PLANT It 080040 a is eo CONTRACT NO. SUTLIOB NO. ‘Thai Woo Ree Engineering Co.,Ltd ECELIVE Lots 24 APR 2008 By: fda: Doc. No,:80044.1-WS-002 Rev. : 0 Date: 21 Apr.2008 Page :20f5 Method Statement for Erection of Underground Piping TABLE OF CONTENTS 1. General 2. Tool & Equipment 3. Sequence of Work 4. Attachments Doe. No. 8004.L147S.002 Method Statement for Erection of |"*” : ° Date: 21 Apr.2008 Underground Piping Page :30f5 J. General This method statement describes the construction sequence of underground piping line no.11-24- CWS39755A-123AUE-NOMM for Plant 2 Debottleneck Project 2. Tool & Equipment a.Crane 25 Ton, b.Hiap 5 Ton. Welding Machine/Welding Tools Pump & Accessories €.Gas Cutting £Wind & Fire protection Grinding Machine 4”-7” h.Sting Belt 3Ton iSurvey level j Pressure testing equipment 3. Sequence of Work 3.1 Field verify for existing Tei-in 3.2 Wind and fire protection installation around cutting & welding area 3.3 Piping Installation 3.3.1 Install pipe spool! no, (see attachment 1) 3.3.2 Confirm actual length and marking cut at field, 3.3.3Cutting by grinding machine 7” (or gas cutting if neccessory) and preparation bevel. 3.3.4 Install pipe spool no.2 3.3.SFit-up spool no.1 to spool no.2 (joint no.10)and tack weld. 3.3.6 Confirm actual length and marking cut spool no.3 at field, 3.3.7 Cutting by grinding machine 7” (or gas cutting if neccessory) and preparation bevel. Doc. No.:8004-L1-WS-002 Rev. o Date: 21 Apr.2008 Pago :40f5 Method Statement for Erection of Underground Piping 3.3.8 Install pipe spool no.3 (see attachment 1) 3.3.9Fit-up spool no.2 to spool no.3 (joint no.8)and tack weld 3.3.10Install pipe spool no.4 3.3.11Fit-up spool no.3to spool no.4 Goint no.5)and tack weld 3.3.12 Flang alignment check by transit 3.3.13 Close end of spool no. I (joint no.14)by temporary plate for pressure test. 3.3.14Re-checking for elevation,Location,Diamension and alignment prior to Welding 3.4Welding 3.4.1 Welding joint no.5,8,10 3.4.2Cleaning weld joint 3.5 Inspection as per Inspection and Test Plan No. 8004-QI-PE-004 3.6Pressure test and Flushing 3.6.LInstallation blind flang at flang no.A & B 3.6.2 Pressure test and Flushing Following Procedure no.8004-Q1-PE-006 3.6.3Drain water out(May be hold water inside the pipe after cleaned) 3.7 Wrapping and Coating for weld joint to follow the metrod statement of wrapping work procedure No, 8004-L1-WS-001 3.8Back Fill 3.8.1Final inspection as per 3.3.14 prior to Back Fill, 4.0Attachments 4. Isometric drawing connecting Tic-in portion by other 21 Apr.2008 :0 250f5 3 5 3 g Date Page Underground Piping é 3 e s 3 8 Fi $s = 5 & £ & an 3 8 & 3 = FOR GONSTRUCTION | reel fio (eae SS Attachment 1 [-—— POR SO Pesci PPP PISA SN

You might also like