Professional Documents
Culture Documents
18 TKDN
18 TKDN
KEGIATAN
PEKERJAAN
LOKASI
KOMPL. HWB PINANG AWAN, KEC. PAUH DUO KAB. SOLOK SELATAN
Nilai Gabungan Barang/Jasa (Rp.)
TKDN
Total
Uraian Pekerjaan
DN
LN
Ribu
(Rp.)
Barang/Jasa
%
KDN
Gabungan
Barang
I.
II.
A.
Material Langsung
(Bahan Baku)
Peralatan (Barang Jadi)
Sub Total Barang
840,000,000.00
0.00
840,000,000.00
100.00
840,000,000.00
840,000,000.00
600,000,000.00
1,440,000,000.00
0.00
0.00
600,000,000.00
1,440,000,000.00
100.00
100.00
600,000,000.00
1,440,000,000.00
600,000,000.00
1,440,000,000.00
240,000,000.00
0.00
240,000,000.00
100.00
240,000,000.00
240,000,000.00
80,000,000.00
160,000,000.00
80,000,000.00
560,000,000.00
0.00
0.00
0.00
0.00
80,000,000.00
160,000,000.00
80,000,000.00
560,000,000.00
100.00
100.00
100.00
100.00
80,000,000.00
160,000,000.00
80,000,000.00
560,000,000.00
80,000,000.00
160,000,000.00
80,000,000.00
560,000,000.00
2,000,000,000.00
0.00
2,000,000,000.00
100.00
2,000,000,000.00
2,000,000,000.00
Jasa
III.
IV.
V.
VI.
B.
Manajemen Proyek
dan Perekayasaan
Alat Kerja/Fasilitas Kerja
Konstruksi dan Fabrikasi
Jasa Umum
Sub Total Barang
C.
Total Biaya (A + B)
Formulasi Perhitungan :
% TKDN
(Gabungan Barang Jasa)
1,440,000,000.00
2,000,000,000.00
0.00
1,440,000,000.00
2,000,000,000.00
0.72
72.00%
560,000,000.00
2,000,000,000.00
0.00
560,000,000.00
2,000,000,000.00
0.28
28.00%
ttd
Ir. FERRY ERIANDY
Wakil Direktur