ABDULLAH A-AL BARRAK & SONS CO.#
WELDER CARDS
CLIENT: ADVANCED PETROCHEMICAL COMPANY (ADVANCED)
PROJECT: REPLACE OLD & INSTALL NEW C3 BOILER
PO # 4500010349
Revise as pe
a client comments 5122015
00 First Issue 6/1/2015,
REV ‘COMMENT DATE REVIEWED BY (Client) | APPROVED BY (Client)TEST RECORD
This is ceray net his person has
been este in accerdance win ine
tequtemenisof ASME oF
\eldng Code or aS HSI
ALSARRAK NOUSTRIL SERVICES
OHO SUFYAN Roy
Tonraciors ReoraraTe
Auorised by.
For VETCO SAUDIARABIA CO. LTD,
WELDER QUALIFICATIONCARO. NB Tuboscope.
Company. __ AL-BARRAK NDUSTRIAL SERVICES
Weders Name — HASSAN BAL
thamaNo: 2200455575 ——SyrboTI Ne Warez
Weeing Proaeales) —GTANTSNAW
Tipe (ManvavSem-aucmaneiagemaiy TENOR
Dis & Theiners (acta) SE NPs XTTORR
Range qualifies: Wi .GTAW-aarmn & SAM TSOnm Mace POD Eee
TestPostion’ 66-TPRIEL Postion Qvaied A
Elecrode Clas” ERTOSETETOTE F.No. 6/4
Joint Type: Sagle Grove Bul Test menos —Radeyraahy Toe
Project Fue F157 Teron Cen. No WOTTaOP
(sto of Test. “Te-Gap- 4 RETEARG] Place ol esber AnobarTEST RECORD
‘This isto cety atts person has
been ested in aecordance win ne
fequrementsot ASME 2010
Weng Code fr anon SSTST
AL-BARRAK NOUSTRIAL SERVICES
MONO SUEYAN
ConvaciorsRepresanah
RANJAN KUMAR JENA
Weare napeciorsaa
THOMAS VARGHESE
‘autores by
For: VETCO SAUDI ARABIA CO.LT0.
WELDER QUALIFICATION CARD Ney
Gamsany _ALSARRAK NOUSTRUAL seRVCES
(heier's Names ATTIGUR RERRAR——ES
Kama No: _PP AF 1281902 — SBOTSTS
WPSNo: ABI1148-I0Rm0 Pe Pie
Daa & Thekness (etal NPS 6° 15 mm —
id
Wldog PrSces(es)—GTANTSM To
Weg arwalSem-2usmsicaiomaey— TERT ————
a
Ferreaeet A STHW ben Mark HAT TESTES
ceeetn: | 60-UeRL Poa Saati
‘Cen. No.. wor aaree
Elecvode Cass’ ERTSZTETIE- ne oT
PoE Lie: Sol Ciao Bad Tee aco — Rea ———
ere Te ——
Proce ie FATSTTETOE a
Deel Test Thug 1 (Renewed) — Pace of sie RRS ——Welder Continuity Record
Name: HASSAN BILAL Welder 10: 4742,
Test No: WOT-743/10/P Test Date:18-Sep-2014
Material: SA 536r.8 Process: GTAW/SMAW
Date Dwng No NDT Method Result
6-8-2014 To 7-9-2014 | paz-Lzi-(11)1124495.025, RT Accepted
P35-L21-(11)000175.010 RT Accepted
159-2016 TO 25-9-2014 | 83-L-2L-(11)120795.011 aT Accepted
15-9-2014 To 25-9-2014 | PaS-L-2L11}1400175.008 Rr Accepted
159-2014 TO 25-9-2014 | Pr24L2L(11)1028695.022 Rr Accepted
15-9-2014 To 25-9.2014 | P#5-LZL21)1400175,009 RT Accepted
6-10-2014 TO 7-11-2014 | PBo-L-ZL-(11]012489,001 aT Accepted
6-10-2014 TO 7-11-2014 | pa1-L-2L-(11]025459,002 Rr Accepted
6-10-2014 TO 7-21-2014 | Pas-L-2111)1400175.009 Rr Accepted
9-11-2014 TO 19-1-2015 } Pas--2L21)2201575.015 aT Accepted
20-41-2015 TO 27-1.2015 | Pa2tzL{a1)s124495.025, RT Accepted
Contractor Qc: Client ac
Amjad Jay Kumar
261-2015,
RalWelder Continuity Record
Name: ATTIQUR REHMAN Welder ID: ATR
Test No: WaT-257/14/P ‘Test Date: 7-AUG-2014
Material: SA 106-GR.B Process: GTAW/SMAW
Date Dwng No NDT Method Result
198-2014 70 25-10-2014 14vRM-6007007 Rr Accepted
198-2014 70 25-10-2014 s14vRM-1207105 RT Accepted
198-2014 70 25-10-2014 14yRM1207004 aT Accepted
19-8-201470 25-10-2014 14VRM-6007050 ar Accepted
19-8-2014 TO 25-10-2014 14vrw-8007001 RT Accepted
198-2014 70 25-10-2014 14VRM-837003 RT Accepted
198-2014 70 25-10-2014 s4van-1207001 ar Accepted
20-10-2014 TO 25-11-2014 avem007006 Rr Accepted
20-10-2014 70 25-11-2014 s4vRM-6007005 RT Accepted
20-10-2014 T0 25-11-2014 24VRM-1207006 RT Accepted
29-12-2014 TO 24-1-2015 s4vaM-3207016 ar Accepted
Contractor QC Client ac
Lp Sata, OC JAY KUMAR,
26/1/2015