You are on page 1of 5
ABDULLAH A-AL BARRAK & SONS CO.# WELDER CARDS CLIENT: ADVANCED PETROCHEMICAL COMPANY (ADVANCED) PROJECT: REPLACE OLD & INSTALL NEW C3 BOILER PO # 4500010349 Revise as pe a client comments 5122015 00 First Issue 6/1/2015, REV ‘COMMENT DATE REVIEWED BY (Client) | APPROVED BY (Client) TEST RECORD This is ceray net his person has been este in accerdance win ine tequtemenisof ASME oF \eldng Code or aS HSI ALSARRAK NOUSTRIL SERVICES OHO SUFYAN Roy Tonraciors ReoraraTe Auorised by. For VETCO SAUDIARABIA CO. LTD, WELDER QUALIFICATIONCARO. NB Tuboscope. Company. __ AL-BARRAK NDUSTRIAL SERVICES Weders Name — HASSAN BAL thamaNo: 2200455575 ——SyrboTI Ne Warez Weeing Proaeales) —GTANTSNAW Tipe (ManvavSem-aucmaneiagemaiy TENOR Dis & Theiners (acta) SE NPs XTTORR Range qualifies: Wi .GTAW-aarmn & SAM TSOnm Mace POD Eee TestPostion’ 66-TPRIEL Postion Qvaied A Elecrode Clas” ERTOSETETOTE F.No. 6/4 Joint Type: Sagle Grove Bul Test menos —Radeyraahy Toe Project Fue F157 Teron Cen. No WOTTaOP (sto of Test. “Te-Gap- 4 RETEARG] Place ol esber Anobar TEST RECORD ‘This isto cety atts person has been ested in aecordance win ne fequrementsot ASME 2010 Weng Code fr anon SSTST AL-BARRAK NOUSTRIAL SERVICES MONO SUEYAN ConvaciorsRepresanah RANJAN KUMAR JENA Weare napeciorsaa THOMAS VARGHESE ‘autores by For: VETCO SAUDI ARABIA CO.LT0. WELDER QUALIFICATION CARD Ney Gamsany _ALSARRAK NOUSTRUAL seRVCES (heier's Names ATTIGUR RERRAR——ES Kama No: _PP AF 1281902 — SBOTSTS WPSNo: ABI1148-I0Rm0 Pe Pie Daa & Thekness (etal NPS 6° 15 mm — id Wldog PrSces(es)—GTANTSM To Weg arwalSem-2usmsicaiomaey— TERT ———— a Ferreaeet A STHW ben Mark HAT TESTES ceeetn: | 60-UeRL Poa Saati ‘Cen. No.. wor aaree Elecvode Cass’ ERTSZTETIE- ne oT PoE Lie: Sol Ciao Bad Tee aco — Rea ——— ere Te —— Proce ie FATSTTETOE a Deel Test Thug 1 (Renewed) — Pace of sie RRS —— Welder Continuity Record Name: HASSAN BILAL Welder 10: 4742, Test No: WOT-743/10/P Test Date:18-Sep-2014 Material: SA 536r.8 Process: GTAW/SMAW Date Dwng No NDT Method Result 6-8-2014 To 7-9-2014 | paz-Lzi-(11)1124495.025, RT Accepted P35-L21-(11)000175.010 RT Accepted 159-2016 TO 25-9-2014 | 83-L-2L-(11)120795.011 aT Accepted 15-9-2014 To 25-9-2014 | PaS-L-2L11}1400175.008 Rr Accepted 159-2014 TO 25-9-2014 | Pr24L2L(11)1028695.022 Rr Accepted 15-9-2014 To 25-9.2014 | P#5-LZL21)1400175,009 RT Accepted 6-10-2014 TO 7-11-2014 | PBo-L-ZL-(11]012489,001 aT Accepted 6-10-2014 TO 7-11-2014 | pa1-L-2L-(11]025459,002 Rr Accepted 6-10-2014 TO 7-21-2014 | Pas-L-2111)1400175.009 Rr Accepted 9-11-2014 TO 19-1-2015 } Pas--2L21)2201575.015 aT Accepted 20-41-2015 TO 27-1.2015 | Pa2tzL{a1)s124495.025, RT Accepted Contractor Qc: Client ac Amjad Jay Kumar 261-2015, Ral Welder Continuity Record Name: ATTIQUR REHMAN Welder ID: ATR Test No: WaT-257/14/P ‘Test Date: 7-AUG-2014 Material: SA 106-GR.B Process: GTAW/SMAW Date Dwng No NDT Method Result 198-2014 70 25-10-2014 14vRM-6007007 Rr Accepted 198-2014 70 25-10-2014 s14vRM-1207105 RT Accepted 198-2014 70 25-10-2014 14yRM1207004 aT Accepted 19-8-201470 25-10-2014 14VRM-6007050 ar Accepted 19-8-2014 TO 25-10-2014 14vrw-8007001 RT Accepted 198-2014 70 25-10-2014 14VRM-837003 RT Accepted 198-2014 70 25-10-2014 s4van-1207001 ar Accepted 20-10-2014 TO 25-11-2014 avem007006 Rr Accepted 20-10-2014 70 25-11-2014 s4vRM-6007005 RT Accepted 20-10-2014 T0 25-11-2014 24VRM-1207006 RT Accepted 29-12-2014 TO 24-1-2015 s4vaM-3207016 ar Accepted Contractor QC Client ac Lp Sata, OC JAY KUMAR, 26/1/2015

You might also like