Professional Documents
Culture Documents
pp高级教程 2
pp高级教程 2
6c PP Module
BOM
Work center
Routing
Version:2.0
Date:2001/10/0
1
:
Agenda #1
( )BOM maintain
1.Create/change BOM
P 5~24
P25~28
P 29~31
( )ECN
P 32~56
( )Work center
P 57~78
Agenda #2
( ) Create routing
P 79~87
( ) Update Work Schedule View
1.Review before update
P 88
2. Updating
P 89~96
3.Result of update
P 97
Create/change BOM #1
/
BOM BOM
ECN
No
ECN No
5
BOM Usage: (BOM )
1 - Production BOM
planned order production order ,
BOM dependent requirement
Create/change BOM #2
group BOM
Error message
,
BOM,
Create/Change BOM #3
Key
item
1.Item: BOM
2.Ict: Item Category category
L L=stock item, L
3.Component:
4.Un: material master base unit of measure
TP(1/1000piece) material master basic view
PCS TP BOM
5.Sort string:
6. , go to item, ,
component
10
11
12
1.Lead-time offset: /
+
4.AltItem Group:
BOM
13
Maintain AltItemGroup
15
1.AltItem Group: discontinuation material
2.Priority:
( )
3.Strategy: ( )
16
17
AA
18
ECN ,
BOM
19
header
20
Header overview #1
21
Header overview #2
22
1.BOM text: BOM
2.Base quantity: BOM
3.Valid from:BOM
4.BOM status: BOM ( )
BOM
23
Header overview #3
24
Allocate ,
BOM
Mrp1,Mrp2
25
new
assignment
26
27
Mrp
28
29
30
31
32
33
Running change
34
ECN
1. ECN .( ASSY.)
2. ASSY. change, ( ECN )
3.ECN Assembly .
4. ECN BOM , , ECN change.
: ECN ,
ECN. BOM.
5. Running Change ECN , ASSY. ECN No.
ECN , .
35
ECN
1.change number :ECN No. .
2.Valid from: ECN No. .
3.change no.status:ECN No. , ECN No.
.
4.Reason for change:ECN .
5.Administrative data:ECN , ( )
6.object types: . BOM, Routing,
ECN Routing.
36
37
Status detail
Status
01
02
03
11
12
13
Status 03 02 01
ECN ECN No
Object
ECN ECN No
Object
ECN ECN
Object
ECN ECN No
Object Running Change
ECN ECN No
Object Running Change
ECN ECN
Object Running Change
38
,
mgtRec
off
39
Object type
1.Actv. object type ECN
2.object ECN ,( BOM),
ECN NO object .
3.MgtRec ECN , ECN No object
, , ECN , ECN
object, off.
4.Gen new MgtRec., MgtRec. ,Gen new ( )
40
BOM
41
42
Alternative date
Object( Model BOM) ECN NO
Alternative date Object ECN
Object ECN Header Valid from Date
Alternative date .
1.Alternative date:
2.Valid from:
3.objID: V object( BOM)
43
44
45
Page42
46
ECN number
47
48
QPA 1 2
49
ECN
50
BOM
51
Alternat
date
52
BOM
ECN
53
ECN ,
T-code cc03
54
55
56
Work Center
.
58
59
w/c
, w/c BF
60
DELT
61
Person responsible: Work center .
Usage: Work center ( )
a. 009- All task list types, Work center (Task
List), , , ..
b 011- Work Center Group usage, Work center,
Work center Work center, , User
Work center Work Center.
(Routing) , ,
Work center, Routing
Work center , , Work center
Work center
62
Rule for maint.; Work center (Routing)
Activity ( )
a.
no checking Check.
b.
c.
d.
e.
)
63
64
65
66
1.Control key: Work center ,Control Key
:
a. Scheduling Work Center .
b. Capacity Planning Work Center .
c. Costing indicator Work Center .
d Aut. Goods receipt , W/C ,
confirmation , , .
e. Print confirmation&Print time tickets&print
.
f. External processing , Work center .
g. Confirmation Work center Confirm
67
: .pp01 confirmation
.pp05
w/c
.pp11 confirmation
2. Refct.: V Control key Work center
,
.
3. Standard text key: .
4.Units of measure of standard value: basic data view standard value key
\
, , , , ,
, "
68
Capacity overview #1
,
w/c
,
69
1. Capacity category, processing formula, standard value key
70
Capacity overview #2
capacity
header
71
Capacity:header#1
72
1Capacity utilization: .( 100%)
2No. of indiv. Cap.: .
3Capacity: , Operating time * No. of
indiv.cap
4.Planning details: .
a. Relevant to finite scheduling: V Category
b. Overload %: , ,
.
c. Can be used by several operations:
d. Long-term Planning: Run long term planning(
) Work Center Capacity.
73
Scheduling #1
Scheduling
74
Scheduling #2
capacity header
75
76
77
Information of success
78
Create
routing
79
Initial screen
80
Operation overview
81
Header Details #1
82
Header Details #2
Routing ,
routing, field
83
Result of check
84
85
Component overview
86
This is result
87
88
89
90
91
92
93
94
update
95
No warning
no error
96
97