Section C5
Schedule F Bonus & Penalties
GENERAL
Notwithstanding the General Conditions for Construction Contracts, Document C3, if the
Contractor exceeds the maximum durations for imposition of penalties with respect to
applicable clauses below, this shall be accepted by the Contractor as sufficient justification for
the Company to consider them as in default.
2.0
3.0
4.0
5.0
6.0
for each whole day the milestone is not achieved after the required period subject to a
maximum of:
US$50,000 (in words Fifty Thousand US Dollars)
7.0
8.0
9.0
10.0
11.0
12.0
OMANISATION PENALTY
The Contractor shall note the requirements of Document C-7 and the penalties stated therein.