BEGINNING

BEGINNING

1.1.- Quality
Quality checking
checking of
of supplier
supplier
sample
sample

The Quality checking


of Sample is correct?

NO

NG
NG back
back material
material to
to suplier
suplier

Contact
Contact suplier
suplier

YES

2.-Ingot
2.-Ingot reception
reception

YES

NO

3.-Aluminum
3.-Aluminum melting
melting in
in
Furnance
Furnance

Need
Need advice
advice to
to
supplier?
supplier?

Drain
Balance de
Drain or
or Balance
de chemical
chemical composic
composic
percentage.
percentage.

4.4.- Aluminum
Aluminum treatmeant
treatmeant

5.-Ladle
5.-Ladle Preheat
Preheat

6.6.- Ladle
Ladle Drain
Drain

7.a sample
7.- Take
Take a
sample of
of
Al
Al

8.Aluminum degassing
8.- Aluminum
degassing
and
and slag
slag cleaning
cleaning

18.18.- NG
NG material
material return
return

9.-Holding
9.-Holding Furnace
Furnace Fill
Fill (Die
(Die
Casting
Casting Machine)
Machine)

10.10.- Die
Die Casting
Casting High
High Pressure
Pressure injection
injection 2500t
2500t

11.11.- Trimming
Trimming

12.-Point
12.-Point check
check

2
1

7.1.Analyze a
7.1.- Analyze
a sample
sample
of
of Al
Al

The Chemical analyze


is correct?

1
2
NO

The Quality checking . Qtime/Point check are correct?

YES
13.13.- Parts
Parts Accomodation
Accomodation

14.14.- Material
Material Transfer
Transfer from
from
casting to
casting
to triming
triming area
area

15.15.- Trimming
Trimming 2
2&
&3
3

16.16.- Material
Material Transfer
Transfer from
from
trimming to
trimming
to Dy
Dy check
check

17.17.- Dy
Dy check
check

YES
The part has a
crack?

NO
19.19.- Transfer
Transfer to
to Machining
Machining
area
area

END
END

plier
plier

Balance
Balance de
de chemical
chemical composicion
composicion
percentage.
percentage.

NO

The Chemical analyze


is correct?

YES

PQ-time
PQ-time

Q-Time
Q-Time Patroll
Patroll

QC
QC Lab
Lab Inspection
Inspection

Page 1/2

Page 2/2